Himachal Pradesh Schedule of Rates

Authority:HP PWD · IPHRegion:Himachal PradeshDocuments:3
3 documents available — direct from official sources, free
HP PWD SoR — PMGSY Bridge 2021
roads bridgesVerified↓ Download
HP PWD SoR — PMGSY Road 2021
roads bridgesVerified↓ Download
HP PWD Schedule of Rates 2020
civilVerified↓ Download
Official portal: https://hppwd.hp.gov.in/
HP PWD publishes the Schedule of Rates 2020 as the current baseline, with separate dedicated SoRs for PMGSY Road (2021) and PMGSY Bridge (2021) works. IPH (Irrigation & Public Health) handles water-supply schemes; its rates are issued through tender NITs rather than a department-wide SOR.

About HP PWD / IPH

Himachal Pradesh's fully-hilly terrain — Shimla, Manali, Dharamshala, Kullu, Solan, Mandi, Hamirpur, Bilaspur, Kangra, Chamba, Kinnaur and Lahaul-Spiti districts — and short productive construction window (typically May-October at lower elevations, June-September at higher elevations) drive specific rate considerations: limited working seasons, high lead/lift due to mountainous transport, weather contingencies, snow-clearing overheads, and limited skilled-labour availability inside the state. The 2020 base SOR remains the canonical reference document for general civil works including building construction, district roads, and standard infrastructure. PMGSY-specific schedules from 2021 (Road and Bridge as separate PDFs) supplement rural-roads work funded under the Pradhan Mantri Gram Sadak Yojana — these documents apply NRIDA's rural-roads adoption circular methodology with HP-specific lead/lift factors. IPH (Irrigation & Public Health) is HP's combined water-resources and water-supply department; it does not publish a standalone SOR but issues rates through individual tender NITs that reference PWD SOR for civil items and CPHEEO for water-treatment specifications. JJM-HP works are administered by IPH using this layered approach. BRO handles strategic border-road works in Lahaul-Spiti and Kinnaur (China border, Indo-Tibet roads) using BRO/MoRTH defence-grade specifications and rate framework — state-funded approach roads to BRO works use HP PWD SOR. HP PWD SOR has built-in hilly-terrain rates throughout (the entire state is hilly, so no separate plains-vs-hills distinction exists within the SOR). For external comparison, a 15-25% premium over MoRTH SDB Vol I (Plain) is typical for HP works, with steeper premiums (30%+) for high-elevation projects above 2,500m.

Frequently Asked Questions

What is HP PWD SOR 2020?

The current baseline Schedule of Rates for HP — covers building, road, and general civil items. The page at hppwd.hp.gov.in/hp-public-works-department-schedule-of-rates-2020 is the index; tender-level NITs supplement specific projects.

Why are PMGSY Road and Bridge published separately?

PMGSY rural-roads have specifications (labour-intensive, lighter pavement, smaller spans) that warrant separate SoRs from the general PWD baseline. The 2021 dedicated PDFs (Road and Bridge) are referenced for state-share PMGSY works in HP.

What is IPH?

Irrigation & Public Health — HP's combined water-resources and water-supply department. IPH does not publish a standalone SOR; rates are issued through individual tender NITs that reference PWD SOR for civil items and CPHEEO for water-treatment specifications.

Does HP have Char Dham / strategic-road works?

HP isn't part of the Char Dham project. Strategic border-road works in Lahaul-Spiti, Kinnaur (China border) are under BRO with MoRTH SDB rate analysis. State-funded works use HP PWD SOR.

How is hilly-terrain factor applied?

HP PWD SOR has built-in hilly-terrain rates (the entire state is hilly, so no separate plains rates exist). For comparison with central rates, a 15-25% premium over MoRTH SDB Vol I (Plain) is typical for HP works.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.