Site Formats

100 formats
Popular
100 of 100
FormatTypeCategoryCodesID
Pre-Qualification (PQ) ApplicationFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-001
Technical Bid Compliance SheetFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-002
Financial Bid — Item RateFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-003
Financial Bid — Percentage RateFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-004
BOQ Format (CPWD-style)ScheduleTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-005
BOQ Format (PWD-style)ScheduleTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-006
EMD (Earnest Money Deposit) RegisterRegisterTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-007
Performance Bank Guarantee (PBG) TrackerRegisterTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-008
Pre-Bid Query RegisterRegisterTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-009
Bid Comparison Statement (Techno-Commercial)FormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-010
Deviation Sheet — TechnicalFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-011
Deviation Sheet — CommercialFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-012
Letter of Intent (LOI)FormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-013
Letter of Award (LOA)FormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-014
Performance BG Submission LetterFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-015
Mobilisation Advance RequestFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-016
Interim Payment Certificate (IPC)RegisterTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-017
Vendor / Sub-Contractor EmpanelmentFormTendering & Contracts
CPWD Works Manual 2019FIDIC Red Book+1
FMT-TND-018
Bar Bending Schedule (BBS) — BeamScheduleSite Execution
IS 456IS 2502+2
FMT-SIT-001
Bar Bending Schedule (BBS) — ColumnScheduleSite Execution
IS 456IS 2502+2
FMT-SIT-002
Bar Bending Schedule (BBS) — SlabScheduleSite Execution
IS 456IS 2502+2
FMT-SIT-003
Bar Bending Schedule (BBS) — FootingScheduleSite Execution
IS 456IS 2502+2
FMT-SIT-004
Bar Bending Schedule (BBS) — Pile / Pile CapScheduleSite Execution
IS 456IS 2502+2
FMT-SIT-005
Level Book FormatRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-006
Setting-Out / Line-Out RegisterRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-007
Pour Card — ColumnFormSite Execution
IS 456IS 2502+2
FMT-SIT-008
Pour Card — BeamFormSite Execution
IS 456IS 2502+2
FMT-SIT-009
Pour Card — SlabFormSite Execution
IS 456IS 2502+2
FMT-SIT-010
Pour Card — Raft / Mat FoundationFormSite Execution
IS 456IS 2502+2
FMT-SIT-011
Pour Permit (Concrete)FormSite Execution
IS 456IS 2502+2
FMT-SIT-012
Concrete Cube Test LogRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-013
Slump Test LogRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-014
Daily Concrete Pour RegisterRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-015
Daily Progress Report (DPR) — SiteRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-016
Weekly Progress Report — SiteRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-017
Brickwork Inspection ChecklistChecklistSite Execution
IS 456IS 2502+2
FMT-SIT-018
Plaster Inspection ChecklistChecklistSite Execution
IS 456IS 2502+2
FMT-SIT-019
Blockwork Inspection ChecklistChecklistSite Execution
IS 456IS 2502+2
FMT-SIT-020
Shuttering / Formwork InspectionChecklistSite Execution
IS 456IS 2502+2
FMT-SIT-021
De-shuttering PermitFormSite Execution
IS 456IS 2502+2
FMT-SIT-022
Reinforcement Fixing InspectionChecklistSite Execution
IS 456IS 2502+2
FMT-SIT-023
Formwork Removal ScheduleScheduleSite Execution
IS 456IS 2502+2
FMT-SIT-024
Curing RegisterRegisterSite Execution
IS 456IS 2502+2
FMT-SIT-025
GRN (Goods Received Note)FormStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-001
Indent / MIR (Material Issue Request)FormStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-002
Issue VoucherFormStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-003
Material Returns NoteFormStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-004
Bin CardRegisterStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-005
Monthly Stores ReconciliationRegisterStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-006
Cement Consumption RegisterRegisterStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-007
Steel Consumption RegisterRegisterStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-008
Stores Inward RegisterRegisterStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-009
Dead Stock RegisterRegisterStores & Materials
CPWD Works Manual 2019ISO 9001
FMT-STR-010
Rate Analysis — PCC (Plain Cement Concrete)FormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-001
Rate Analysis — RCC M25FormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-002
Rate Analysis — Brickwork (1st class)FormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-003
Rate Analysis — Plaster (Internal 1:4)FormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-004
Rate Analysis — Plaster (External 1:6)FormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-005
Rate Analysis — Shuttering / FormworkFormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-006
Labour Productivity SheetFormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-007
Plant Productivity SheetFormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-008
Overhead & Profit ComputationFormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-009
Escalation / Price Adjustment CalculationFormEstimation & Rate Analysis
CPWD DSRIS 1200
FMT-EST-010
AHU (Air Handling Unit) Commissioning ChecklistChecklistMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-001
Chiller Commissioning ChecklistChecklistMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-002
DG Set Load Test ProtocolTest ReportMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-003
Lift / Elevator Testing ProtocolTest ReportMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-004
Fire Alarm System (FAS) T&C ProtocolTest ReportMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-005
PA / Public Address System T&CTest ReportMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-006
LT Panel ScheduleScheduleMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-007
Cable ScheduleScheduleMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-008
Earthing Test RegisterRegisterMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-009
IR (Insulation Resistance) Test RegisterRegisterMEP Testing & Commissioning
IS 732IS 13364+1
FMT-MEP-010
Building Permit Application (BPA) ChecklistChecklistStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-001
Fire NOC ApplicationFormStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-002
Occupation Certificate (OC) ApplicationFormStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-003
Completion Certificate (CC) ApplicationFormStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-004
AERB License TrackerRegisterStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-005
Pollution NOC (CPCB / SPCB) TrackerRegisterStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-006
Factory License ApplicationFormStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-007
Rain Water Harvesting (RWH) ComplianceChecklistStatutory & NOCs
NBC 2016Factories Act 1948+1
FMT-STA-008
Quarterly Progress Report (QPR) — RERARegisterRERA & Real Estate
RERA Act 2016RERA Rules 2017
FMT-RER-001
Form 5 — Annual Audit Report (RERA)FormRERA & Real Estate
RERA Act 2016RERA Rules 2017
FMT-RER-002
Escrow Account ReconciliationRegisterRERA & Real Estate
RERA Act 2016RERA Rules 2017
FMT-RER-003
Allotment LetterFormRERA & Real Estate
RERA Act 2016RERA Rules 2017
FMT-RER-004
Possession LetterFormRERA & Real Estate
RERA Act 2016RERA Rules 2017
FMT-RER-005
Customer Ledger / Demand LetterRegisterRERA & Real Estate
RERA Act 2016RERA Rules 2017
FMT-RER-006
Control Point RegisterRegisterSurvey & Geomatics
IS 14252IS 1892
FMT-SUR-001
Traverse RegisterRegisterSurvey & Geomatics
IS 14252IS 1892
FMT-SUR-002
Total Station Reading SheetRegisterSurvey & Geomatics
IS 14252IS 1892
FMT-SUR-003
DGPS / GPS Observation LogRegisterSurvey & Geomatics
IS 14252IS 1892
FMT-SUR-004
Cross-Section FormatScheduleSurvey & Geomatics
IS 14252IS 1892
FMT-SUR-005
Bore Log FormatRegisterGeotechnical
IS 1892IS 1888+2
FMT-GEO-001
SPT Test SheetTest ReportGeotechnical
IS 1892IS 1888+2
FMT-GEO-002
Plate Load Test SheetTest ReportGeotechnical
IS 1892IS 1888+2
FMT-GEO-003
CBR Test SheetTest ReportGeotechnical
IS 1892IS 1888+2
FMT-GEO-004
Lab Test Request FormFormGeotechnical
IS 1892IS 1888+2
FMT-GEO-005
3A / 3D Notification Tracker (NHAI)RegisterLand Acquisition & RoW
NH Act 1956RFCTLARR Act 2013
FMT-LAN-001
LA Act §4(1) / §6(1) Notice RegisterRegisterLand Acquisition & RoW
NH Act 1956RFCTLARR Act 2013
FMT-LAN-002
R&R Compensation RegisterRegisterLand Acquisition & RoW
NH Act 1956RFCTLARR Act 2013
FMT-LAN-003

Why every Indian site needs a standard format library

Indian construction runs on paperwork — and the paperwork is format-driven. The contractor's site office prints stacks of GRNs, MIRs, bin cards, pour cards, BBS sheets every week. The PMC office tracks IPCs, FPCs, MOMs, and risk registers. The developer files RERA QPRs every quarter. The surveyor maintains traverse and level books from day one of site mobilization. Without standardised formats, you get inconsistency across sites, lost data between contractors, audit failures during ISO/RERA/NABL reviews, and disputes that drag on for years.

The CPWD Works Manual 2019, MoRTH Specifications for Road & Bridge Works, FIDIC Conditions of Contract, IS 456, IS 1786, IS 383, RERA Act 2016, and BOCW Act 1996 all explicitly or implicitly require certain documents — IPCs per the contract, MTC verification per IS 1786, NCRs per ISO 9001, QPRs per RERA Section 11(1)(d). InfraLens Formats provides the operational documents themselves — pre-formatted, code-mapped, ready to print or fill in Excel.

Three role-hubs on InfraLens: PMC Templates is the consultant's toolkit (150 templates for site oversight). QA/QC Templates is the quality engineer's toolkit (300+ checklists, test reports, ITPs). Formats is everything else — the contractor's, storekeeper's, surveyor's, developer's, MEP engineer's day-to-day documents. Together the three hubs cover the full lifecycle: tender → mobilise → execute → bill → quality-check → hand over.

How the 100 formats are organised — 10 work-streams

Tendering (18 formats): BOQ format (CPWD + PWD), PQ application, technical bid compliance, financial bid (item rate + percentage rate), EMD register, bid bond tracker, pre-bid query register, bid comparison statement, deviation sheets (tech + commercial), LOI/LOA templates, performance bank guarantee submission, mobilisation advance request, tender schedule, vendor empanelment.

Site Execution (25 formats): Bar Bending Schedule (BBS) for beam / column / slab / footing / pile, level book, setting-out register, pour cards (column / beam / slab / raft), pour permit, concrete cube log, slump test log, daily pour register, site DPR, site WPR, brickwork / plaster / blockwork inspection, shuttering inspection, de-shuttering permit, reinforcement fixing inspection, formwork removal schedule, curing register.

Stores (10 formats): GRN (Goods Received Note), Indent / MIR, issue voucher, material returns note, bin card, monthly reconciliation, cement consumption register, steel consumption register, stores inward register, dead stock register.

Estimation & Rate Analysis (10 formats): Rate analysis for PCC, RCC M25, brickwork, plaster (internal + external), shuttering; labour productivity, plant productivity, overhead & profit computation, escalation calculation per price-adjustment formula.

MEP Testing & Commissioning (10 formats): AHU commissioning, chiller commissioning, DG set load test, lift / elevator testing protocol, fire alarm (FAS) T&C, PA system T&C, LT panel schedule, cable schedule, earthing test register, IR (insulation resistance) test register.

Statutory / NOC (8 formats): Building permit application (BPA) checklist, fire NOC, OC application, CC application, AERB license tracker, pollution NOC (CPCB / SPCB) tracker, factory license application, rain water harvesting compliance.

RERA (6 formats): Quarterly Progress Report (QPR), Form 5 (Annual Audit), escrow account reconciliation, allotment letter, possession letter, customer ledger / demand letter.

Survey (5 formats): Control point register, traverse register, total station reading sheet, DGPS observation log, cross-section format.

Geotechnical (5 formats): Bore log, SPT test sheet, plate load test, CBR test sheet, lab test request form.

Land Acquisition (3 formats): 3A/3D notification tracker (NHAI), LA Act Section 4(1)/6(1) notice register, R&R (Resettlement & Rehabilitation) compensation register.

What's the right format for your role?

Contractor's site office — start with the Site Execution family (BBS, pour cards, daily reports) + Stores (GRN, bin card) + Tendering (BOQ formats for the next bid). Roughly 50 of the 100 formats are directly used by a contractor's site team.

PMC / Consultant — primarily use PMC Templates (MOMs, IPC certification, audit reports), but cross-reference Tendering formats during bid evaluation + Statutory trackers for compliance oversight.

Developer / Real-estateRERA quarterly and annual filings + Statutory (BPA, OC, fire NOC) + selective Site Execution trackers from contractor.

SurveyorSurvey family from day 1 (control points, traverse, level book) + Geotech during initial soil investigation.

MEP contractorMEP T&C family for system commissioning + Stores for material tracking + Tendering during bidding.

Project manager — uses all 10 work-streams selectively. The Estimation rate analysis sheets and Tendering BOQ formats are the most commercially valuable; the Site Execution + Stores formats are operational backbone.

Each format on InfraLens is downloadable as Excel (editable, with formulas where applicable) and PDF (print-ready). Most are 1-3 pages; the BOQ and rate analysis formats are tabular, ready for population. All formats are mapped to the relevant IS code, IRC code, FIDIC sub-clause, CPWD Works Manual chapter, or statutory Act / Rule wherever applicable.

Frequently Asked Questions

10 common questions about this topic, answered by civil engineers.

What is a BBS (Bar Bending Schedule) and how do I prepare one?+

A BBS is a table listing every reinforcement bar in a concrete element — bar mark, diameter, shape, length, number of pieces, weight. It's the procurement document for steel and the issue document for steel-fixers. Prepare per IS 2502:1963 (Code of Practice for Bending and Fixing of Bars). Columns: Bar Mark, Diameter (mm), Type / Shape Sketch, Length (mm), No. of Bars, Total Length (m), Unit Weight (kg/m per IS 1786 Table 3), Total Weight (kg). One BBS per element (footing, column, beam, slab) is standard; site uses it to cut + bend rebar before fixing. Total weight from BBS × wastage factor (~3-5%) = procurement quantity.

What is the difference between a GRN, MIR, and Issue Voucher?+

GRN (Goods Received Note) is filled when material arrives at site — it records the supplier, invoice number, quantity received, quality check status. The storekeeper signs the GRN to acknowledge receipt; the GRN is the basis for raising the bill. MIR (Material Issue Request) or Indent is filled by the site engineer requesting material from stores — element, quantity, date needed. The storekeeper checks bin card, issues against the MIR. Issue Voucher is the storekeeper's confirmation that material was actually issued to the requesting site engineer, with quantity, date, signature. These three documents — GRN, MIR, Issue Voucher — form the audit trail from supplier to site consumption.

What is RERA Form 5 and when is it filed?+

RERA Form 5 is the Annual Audit Report that every promoter must file with the state RERA Authority within 6 months of the end of each financial year. It's a Chartered Accountant's certificate confirming that (a) 70% of amounts collected from allottees were deposited into the project-specific escrow account, (b) withdrawals were proportionate to the percentage of construction completion, (c) project finances are healthy. Required per RERA Act 2016 Section 4(2)(l)(D) and state RERA rules. Quarterly progress reports (QPRs) are separate — they're filed every 3 months, covering work done, photos, money received, money spent, expected completion date. Both forms vary by state RERA; MahaRERA, RERA Karnataka, RERA Haryana each have slightly different templates.

What is a Performance Bank Guarantee and how is it tracked?+

A Performance Bank Guarantee (PBG) is a bank guarantee submitted by the contractor securing performance of the contract — typically 5-10% of contract value per CPWD or 5% per FIDIC Red Book Sub-Clause 4.2. Issued by a scheduled commercial bank, valid for the contract period + defects liability period (usually 12-24 months). The Performance BG Tracker format records: BG number, issuing bank, amount, validity from-to, project, contractor, status (live / extended / claimed / released). Common issues tracked: BG expiry (renewal needed 30 days before expiry), claim invocation (during disputes), release after DLP completion. Every contract has a separate PBG — the tracker maintains the portfolio for the PMC / developer.

What is a price adjustment / escalation formula?+

Price Adjustment (PA) or Escalation compensates the contractor for cost increases over a long-duration contract. The standard CPWD / MoRTH formula breaks the contract into components (cement, steel, bitumen, labour, fuel, others) each with a weightage and an indexed base + current price. Formula: PA = Contract Value × Σ (Weight × (Index_Now − Index_Base) / Index_Base). Indices used: All India WPI for cement / steel (released monthly by Economic Advisor's office), Labour wage rate from CPWD Schedule, RBI fuel index. The Escalation Calculation format does this computation for each Running Account Bill — typically applied after 24 months from contract date or quarterly depending on contract terms. For DSR-based contracts, the analogous concept is star rate for new items not in the schedule.

What test is conducted with a plate load test?+

The Plate Load Test (PLT) is conducted per IS 1888:1982 to determine the safe bearing capacity and settlement characteristics of soil at the foundation level. A steel plate (300mm × 300mm or 600mm × 600mm) is placed at the test depth, loaded incrementally (5 increments to design load + 50%), and settlement is measured at each increment. Output: load-settlement curve, ultimate bearing capacity (load at which curve becomes asymptotic), safe bearing capacity (ultimate / factor of safety, typically 2.5-3). Test is performed for important structures > 3 floors or wherever soil is variable; minimum 2-3 tests per building. The Plate Load Test format records the apparatus, load increments, settlement readings every 5-10 min until stable, and computed bearing capacity.

What is the LA Act 2013 Section 4(1) notice?+

Under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013 (LA Act 2013, also called RFCTLARR Act), Section 4(1) is the preliminary notification that the government intends to acquire land for a public purpose. It triggers the Social Impact Assessment (SIA) under Section 4(2). After SIA, Section 6(1) is the declaration of acquisition. Section 11 is the public notice + objections period. Section 19 is the award (compensation determination). The LA Act notice register tracks each notification (3A under NHAI Act 1956 for highways, or Section 4(1) under RFCTLARR for general acquisition), dates, area notified, objections received, status. Each highway project from NHAI follows the National Highways Act 1956 Sections 3A, 3D, 3G (faster process for highways, ~1 year).

What is an IR (Insulation Resistance) test and how often is it done?+

Insulation Resistance (IR) Test checks the integrity of electrical cable insulation by applying a DC voltage (500V or 1000V depending on system voltage) between conductor and earth using a megger instrument. Per IS 732:2019 (Code of Practice for Electrical Wiring Installations), the minimum acceptable IR value is 1 megohm (for low-voltage systems up to 500V) or higher for HV systems. Test is conducted: (a) Before commissioning every new circuit, (b) After any modification, (c) Periodic preventive maintenance — typically annually for industrial, 5-yearly for residential. The IR Test Register records: circuit ID, cable size, voltage, megger reading at 1 minute, polarisation index (10-min reading / 1-min reading — > 2 is good), pass/fail, signed by electrical engineer.

Are these formats free to use commercially?+

Yes — all 100 InfraLens formats are free to download, free to edit, and free to use on commercial construction projects. There's no watermark, no licensing fee, no attribution requirement. Use them as-is, modify the heading to add your company name and logo, integrate them into your project quality manual. The underlying IS / IRC / FIDIC / CPWD / RERA references in the formats are public domain — InfraLens's contribution is the synthesis, the cross-references, and the field-tested structure. If you find an error or want to suggest improvements, contact us.

Do these formats work for projects outside India?+

The format structure (table columns, sections, signoff blocks) is universally applicable to any civil construction project. The specific code references (IS, IRC, CPWD, RERA, BOCW) are India-specific. For projects using ASTM, BS, EN, or FIDIC-based contracts internationally, replace the IS code references with the contract-specified standards (e.g., "per IS 456" becomes "per ACI 318" or "per BS 8110"). The pour card, BBS, GRN, level book, traverse register, bore log, plate load test structures are independent of jurisdiction. Tendering formats (BOQ, IPC) follow CPWD format but the FIDIC-style equivalents are very similar. RERA formats are India-specific (no direct international equivalent).