BOQ Builder โ€” Pre-filled Quantities & CPWD-DSR Rates

Enter dimensions, get a complete Bill of Quantities with IS-1200 measurement deductions, CPWD DSR 2023 rates, plan / elevation / section views, and an editable Excel download โ€” for boundary walls, culverts, retaining walls, septic tanks, drains and more.

Indian construction tenders run on BOQs โ€” Bill of Quantities tables that list every priced item required to build a structure. Preparing a BOQ manually is slow: you draw the structure, measure every item against IS 1200, look up the rate in your local SOR booklet, type item descriptions, compute amounts, apply deductions for openings and corners, and reconcile cement-and-steel quantities. The InfraLens BOQ Builder does all of this from your dimensions in seconds: enter wall length / culvert span / drain depth, pick a structure type, get a complete BOQ with CPWD DSR 2023 rates, IS 1200-compliant deductions, plan-elevation-section views to confirm inputs, and an editable Excel with formula-bound totals.

Available now

18 structure templates are live. Each gives you a complete BOQ from your dimensions + Excel download.

๐Ÿงฑ
Boundary Wall
Brick + RCC columns + plaster + paint
10 itemsLive
๐Ÿญ
Compound Wall (Industrial)
2.5โ€“3 m tall, concertina-ready
10 itemsLive
๐Ÿชจ
Footpath / Paver Block
Surface excav + PCC + sand + paver + kerb
5 itemsLive
๐Ÿ’ง
Soak Pit / Recharge Pit
IS 2470 sanitation + IS 15797 RWH
6 itemsLive
๐Ÿž๏ธ
Farm Pond
MGNREGA + PMKSY water-conservation work
4 itemsLive
ใ€ฐ๏ธ
RCC Storm Drain
Open / covered U-section drain per IS 4111
10 itemsLive
๐Ÿšง
Hume Pipe Culvert
NP3 / NP4 RCC pipe + headwalls (450-1200 mm)
14 items*Live
๐ŸŒ‰
Box Culvert (1-3 m span)
RCC monolithic box + wing walls + backfill
12 itemsLive
๐Ÿšฐ
Septic Tank (5-50 user)
IS 2470 Part 1 brick masonry + RCC cover
14 itemsLive
๐Ÿšป
Toilet Block (1/2/4 seat)
SBM-G + Swachh Vidyalaya brick shell + WC pans
18 itemsLive
๐Ÿ—๏ธ
Check Dam
MGNREGA random-rubble trapezoidal weir + apron
8 itemsLive
๐Ÿชจ
Cantilever Retaining Wall
IS 14458 RCC stem + heel + toe + backfill
10 itemsLive
๐Ÿ›ฃ๏ธ
Internal Road (BT)
Per km, MoRTH / PMGSY flexible pavement
6 itemsLive
๐Ÿ›ค๏ธ
Internal Road (CC)
Per km, IRC 58 rigid concrete pavement
6 itemsLive
๐Ÿ—ผ
OHSR Water Tank
JJM overhead cylindrical RCC tank + staging
15 itemsLive
๐Ÿ›ข๏ธ
UGSR Underground Sump
IS 3370 underground RCC water tank
13 itemsLive
๐ŸŒ
Slab Culvert / Minor Bridge
Single-span 4-12 m RCC deck + abutments
14 itemsLive
๐Ÿซ
Public Building (PHC / School)
Single-storey RCC frame + finishes + doors
25 itemsLive
Coming soon

Templates in active design โ€” shipping at ~1 per week in roughly the order shown. Tell us if you need a specific one prioritised.

What makes a real BOQ โ€” and where most online tools fall short

A complete BOQ has six layers, and most free online calculators only cover two of them. The six layers: (1) structure decomposition โ€” every item that physically goes into the structure (excavation, PCC, brick, RCC, plaster, paint, steel, formwork, finishes); (2) IS 1200 measurement rules โ€” net quantities computed per the BIS standard for each work category, with proper deductions for openings, column volumes, reinforcement displacement and so on; (3) item descriptions in the language of the governing SOR (CPWD DSR, MoRTH, IRC, state PWD) so the BOQ matches tender expectations; (4) per-item unit rates from the active edition of that SOR; (5) rate analysis showing how each composite rate breaks into labour + material + plant + overhead โ€” for negotiation or escalation claims; (6) abstract / summary rolled up by chapter for the cover page. Free Excel templates floating online give you items 3 and 4 โ€” descriptions and rates โ€” but force you to manually decompose the structure, apply measurement rules, and compute amounts. The InfraLens BOQ Builder ships all six layers from your dimensional inputs.

How IS 1200 deductions are applied automatically

IS 1200 Methods of Measurement has 28 parts, each defining the net-quantity rules for one work category. The BOQ Builder hard-wires the relevant rules into each structure template. Examples: IS 1200 Part 1 (Earthwork) โ€” trench width = wall thickness + 2 ร— 150 mm working space (Clause 5.1.1). IS 1200 Part 2 (Concrete) โ€” reinforcement displacement deducted only where steel exceeds 1% of concrete volume (Clause 5.2.1). IS 1200 Part 3 (Brick masonry) โ€” openings above 0.1 mยฒ deducted from masonry volume (Clause 5.4.2); RCC stiffener columns subtracted from net brickwork. IS 1200 Part 5 (Reinforcement) โ€” measured as actual length ร— unit weight per IS 1786 Table 3, with NO lap-length deduction. IS 1200 Part 12 (Plaster) โ€” openings up to 0.5 mยฒ ignored (small-opening balance); 0.5-3 mยฒ deducted on one face only; >3 mยฒ both faces deducted plus jambs/soffits added separately. Every template states which IS 1200 parts apply, and the formulas implement those rules. You don't need to remember them.

What's live now and what's coming

Live today: Boundary Wall. Brick + RCC stiffener column boundary wall with full plaster + exterior paint. 10 BOQ items per CPWD DSR 2023, plan / elevation / section views with break-lines for long walls, IS 1200 gate-opening deductions, Excel download. Coming soon (in rough priority order): Box Culvert (1ร—1, 2ร—2, 3ร—3 m spans) โ€” full PWD/PMGSY culvert BOQ with wing walls, deck slab, parapet, bearing pads. Cantilever Retaining Wall โ€” heel + toe + stem with IS 14458 design check, drainage backfill. Septic Tank (5, 10, 20, 50-user) โ€” IS 2470 standard sizes with leach pit. Soak Pit + Recharge Pit โ€” rainwater harvesting per IS 15797. UGSR / OHSR (5, 10, 25, 50 kL) โ€” RCC water tank with staging. RCC Drain โ€” storm-water network with manholes and gulley pits. Internal Road โ€” per km BT (Bituminous) or CC (Concrete) per MoRTH/IRC, with cross-drainage. Hume Pipe Culvert โ€” NP3 / NP4 pipes with bedding + headwalls. Anganwadi / PHC Building โ€” single-storey rural building. Check Dam โ€” masonry / RCC small dam for water harvesting. Compound Wall variants โ€” for industrial, residential, commercial plots. The roadmap follows GSC search-volume + ease-of-formula-implementation; templates ship as engineering-reviewed, not all at once.

How rates are sourced โ€” and how to use your own

Each structure template ships with CPWD DSR 2023 rates as the default because DSR is the most-cited national reference and reflects fully-loaded Indian rates including labour, material at controlled rate, plant hire, overhead and profit. The CPWD DSR is published in two volumes โ€” Vol 1 (Civil Works) and Vol 2 (Finishing) โ€” and a separate DSR (E&M) Vol 1 + Vol 2 for mechanical-electrical work. Rates valid from October 2023. For your tender or estimate, you'll typically want to override these with your local PWD / SOR rates: state SORs (Maharashtra PWD, Karnataka PWD, Rajasthan RHB, Gujarat WSSB, Bihar RCD, Andhra Pradesh SoR, Tamil Nadu Highways, Telangana SSR, Madhya Pradesh PWD Roads, etc.) typically run 8-15% below DSR; municipal corporation SORs are usually still cheaper. The downloaded Excel keeps rates editable in column F โ€” change a rate, the SUM formulas recompute totals automatically. The item codes and descriptions stay DSR-aligned but item codes from your state SOR can be manually added to the same row if needed for tender compliance.

Visual confirmation โ€” plan, elevation, section

Every BOQ has a hidden assumption: that the person ordering the estimate visualised the structure the same way the person preparing it did. Misread one dimension (foundation depth 0.75 vs 7.5 m, height in metres vs feet) and the BOQ is wildly wrong. The InfraLens BOQ Builder shows three engineering schematics โ€” plan (top-down), elevation (front face) and section (cross-cut) โ€” generated live from your inputs. The section view in particular catches dimensional mistakes instantly: the foundation depth, wall height, plinth band and coping are all visible at scale with annotations. The drawings are schematic, not detailed โ€” they confirm dimensions, they don't replace structural drawings. For actual execution, get a licensed structural engineer to produce GFC drawings.

Frequently asked questions
A **Bill of Quantities (BOQ)** is the priced item list that defines a construction tender or budget. Each row has: item description, IS code reference, unit of measurement (cubic metre, square metre, running metre, tonne, etc.), quantity required, unit rate, and amount. The contractor quotes the rate; the client multiplies rate ร— quantity to get amount. Without a BOQ, tenders are not legally enforceable in India (per CPWD Works Manual and standard FIDIC contract conditions) and disputes over scope become impossible to settle. Every tender from a panchayat to the National Highways Authority of India runs on a BOQ โ€” typically 50-2,000 items long depending on project complexity.