QA/QC Templates

300 templates
Popular
300 of 300
TemplateTypeFamilyIS CodesID
Pre-Pour Inspection ChecklistChecklistConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-CHK-001
During-Pour Inspection ChecklistChecklistConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-CHK-002
Post-Pour / Curing ChecklistChecklistConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-CHK-003
Formwork Inspection ChecklistChecklistConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-CHK-004
Reinforcement Inspection ChecklistChecklistConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-CHK-005
Concrete Mix Design WorksheetFormConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-FRM-001
RCC Work Method StatementFormConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-FRM-002
Concrete Inspection & Test Plan (ITP)PlanConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-PLN-001
Concrete Pour RegisterRegisterConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-REG-001
Cube Test Tracker / RegisterRegisterConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-REG-002
Cube Casting & Compression Test ReportTest ReportConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-TST-001
Slump / Workability Test ReportTest ReportConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-TST-002
UPV (Ultrasonic Pulse Velocity) Test ReportTest ReportConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-TST-003
Rebound Hammer Test ReportTest ReportConcrete & RCC
IS 456IS 1199IS 14687+3
QC-CON-TST-004
Rebar Receiving Inspection ChecklistChecklistSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-CHK-001
Bar Bending & Cutting ChecklistChecklistSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-CHK-002
Reinforcement Placement ChecklistChecklistSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-CHK-003
Structural Steel Erection ChecklistChecklistSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-CHK-004
Welding Inspection ChecklistChecklistSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-CHK-005
Steel Erection Method StatementFormSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-FRM-001
Welding Procedure Specification (WPS)FormSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-FRM-002
Steel Work Inspection & Test Plan (ITP)PlanSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-PLN-001
Steel Material RegisterRegisterSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-REG-001
Welding LogRegisterSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-REG-002
Tensile / Bend / Re-bend Test ReportTest ReportSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-TST-001
Chemical Composition Test ReportTest ReportSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-TST-002
Weld Test Report (Visual + NDT)Test ReportSteel & Reinforcement
IS 1786IS 2502IS 456+3
QC-STL-TST-003
Structural Design Review ChecklistChecklistStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-CHK-001
Seismic Compliance ChecklistChecklistStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-CHK-002
Load Calculation Verification ChecklistChecklistStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-CHK-003
Structural Design Review Process Method StatementFormStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-FRM-001
Structural Works ITPPlanStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-PLN-001
Structural Design Review RegisterRegisterStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-REG-001
Structural Load Test ReportTest ReportStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-TST-001
Deflection Measurement ReportTest ReportStructural Design & Loading
IS 456IS 800IS 1893+3
QC-STR-TST-002
Excavation Inspection ChecklistChecklistSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-CHK-001
Backfilling & Compaction ChecklistChecklistSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-CHK-002
Pile Installation ChecklistChecklistSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-CHK-003
Foundation (Footing/Raft) ChecklistChecklistSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-CHK-004
Excavation Method StatementFormSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-FRM-001
Piling Method StatementFormSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-FRM-002
Geotechnical ITPPlanSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-PLN-001
Soil Investigation RegisterRegisterSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-REG-001
Pile Driving / Boring LogRegisterSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-REG-002
SPT (Standard Penetration Test) ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-001
CBR (California Bearing Ratio) Test ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-002
Proctor Compaction Test ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-003
Atterberg Limits Test ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-004
Grain Size / Sieve Analysis ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-005
Field Density Test ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-006
Plate Load Test ReportTest ReportSoil & Foundation
IS 3764IS 2720 Part 7IS 2720 Part 8+3
QC-SOL-TST-007
Brick/Block Receiving Inspection ChecklistChecklistMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-CHK-001
Masonry Construction ChecklistChecklistMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-CHK-002
Mortar Preparation & Quality ChecklistChecklistMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-CHK-003
Plastering Inspection ChecklistChecklistMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-CHK-004
Brick/Block Masonry Method StatementFormMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-FRM-001
Masonry Work Inspection & Test Plan (ITP)PlanMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-PLN-001
Masonry Material RegisterRegisterMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-REG-001
Brick Compressive Strength Test ReportTest ReportMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-TST-001
Brick Water Absorption Test ReportTest ReportMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-TST-002
Mortar Cube Compressive Strength TestTest ReportMasonry & Bricks
IS 1077IS 1905IS 2250+2
QC-MAS-TST-003
Subgrade Inspection ChecklistChecklistRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-CHK-001
Sub-base & Base Course ChecklistChecklistRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-CHK-002
Bituminous Layer (DBM/BC) ChecklistChecklistRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-CHK-003
Surface Dressing & Finishing ChecklistChecklistRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-CHK-004
Road Paving Method StatementFormRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-FRM-001
Road Works Inspection & Test Plan (ITP)PlanRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-PLN-001
Road Paving Progress RegisterRegisterRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-REG-001
Marshall Stability & Flow Test ReportTest ReportRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-TST-001
Bitumen Property Tests ReportTest ReportRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-TST-002
Road Core Test ReportTest ReportRoads & Pavement
IS 2720IS 2386SP 20+1
QC-ROD-TST-003
Bridge Foundation ChecklistChecklistBridges
IS 2911IS 456IRC 6+1
QC-BRG-CHK-001
Bridge Substructure ChecklistChecklistBridges
IS 2911IS 456IRC 6+1
QC-BRG-CHK-002
Bridge Superstructure ChecklistChecklistBridges
IS 2911IS 456IRC 6+1
QC-BRG-CHK-003
Bearing & Expansion Joint ChecklistChecklistBridges
IS 2911IS 456IRC 6+1
QC-BRG-CHK-004
Bridge Method StatementFormBridges
IS 2911IS 456IRC 6+1
QC-BRG-FRM-001
Bridge Works ITPPlanBridges
IS 2911IS 456IRC 6+1
QC-BRG-PLN-001
Bridge Construction RegisterRegisterBridges
IS 2911IS 456IRC 6+1
QC-BRG-REG-001
Proof Load Test ReportTest ReportBridges
IS 2911IS 456IRC 6+1
QC-BRG-TST-001
Deflection Measurement ReportTest ReportBridges
IS 2911IS 456IRC 6+1
QC-BRG-TST-002
Bearing Test ReportTest ReportBridges
IS 2911IS 456IRC 6+1
QC-BRG-TST-003
Surface Preparation ChecklistChecklistWaterproofing
IS 2645
QC-WPF-CHK-001
Waterproofing Application ChecklistChecklistWaterproofing
IS 2645
QC-WPF-CHK-002
Flood Test / Ponding ChecklistChecklistWaterproofing
IS 2645
QC-WPF-CHK-003
Waterproofing Application Method StatementFormWaterproofing
IS 2645
QC-WPF-FRM-001
Waterproofing Inspection & Test Plan (ITP)PlanWaterproofing
IS 2645
QC-WPF-PLN-001
Waterproofing Application RegisterRegisterWaterproofing
IS 2645
QC-WPF-REG-001
Waterproofing Adhesion Test ReportTest ReportWaterproofing
IS 2645
QC-WPF-TST-001
Membrane Thickness Test ReportTest ReportWaterproofing
IS 2645
QC-WPF-TST-002
Pipe Laying Inspection ChecklistChecklistPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-CHK-001
Joint & Connection Inspection ChecklistChecklistPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-CHK-002
Plumbing Fixture Installation ChecklistChecklistPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-CHK-003
Pipe Laying Method StatementFormPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-FRM-001
Water Tank Installation Method StatementFormPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-FRM-002
Plumbing & Water Supply ITPPlanPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-PLN-001
Plumbing Installation RegisterRegisterPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-REG-001
Hydrostatic Pressure Test ReportTest ReportPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-TST-001
Pipe Leakage Test ReportTest ReportPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-TST-002
Water Quality Test ReportTest ReportPlumbing & Water Supply
IS 2065IS 10500
QC-PLB-TST-003
Trench Excavation ChecklistChecklistDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-CHK-001
Drainage Pipe Laying ChecklistChecklistDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-CHK-002
Manhole Construction ChecklistChecklistDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-CHK-003
Sewer Pipe Laying Method StatementFormDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-FRM-001
Manhole Construction Method StatementFormDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-FRM-002
Drainage Works ITPPlanDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-PLN-001
Drainage Installation RegisterRegisterDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-REG-001
Drainage Leakage / Water Test ReportTest ReportDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-TST-001
Smoke Test ReportTest ReportDrainage & Sewerage
IS 1729IS 458IS 4127
QC-DRN-TST-002
Conduit & Wiring Installation ChecklistChecklistElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-CHK-001
Distribution Board Installation ChecklistChecklistElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-CHK-002
Earthing System ChecklistChecklistElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-CHK-003
Lightning Protection System ChecklistChecklistElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-CHK-004
Cable Laying Method StatementFormElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-FRM-001
Electrical Installation ITPPlanElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-PLN-001
Electrical Installation RegisterRegisterElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-REG-001
Insulation Resistance (Megger) Test ReportTest ReportElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-TST-001
Earth Resistance Test ReportTest ReportElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-TST-002
Continuity & Loop Impedance Test ReportTest ReportElectrical Installations
IS 732IS 3043IS 2309
QC-ELC-TST-003
Fire Hydrant System ChecklistChecklistFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-CHK-001
Fire Sprinkler System ChecklistChecklistFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-CHK-002
Fire Detection and Alarm System ChecklistChecklistFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-CHK-003
Passive Fire Protection ChecklistChecklistFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-CHK-004
Fire Fighting System Installation Method StatementFormFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-FRM-001
Fire Safety Installation ITP (Inspection and Test Plan)PlanFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-PLN-001
Fire Safety Installation RegisterRegisterFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-REG-001
Fire Hydrant Flow and Pressure Test ReportTest ReportFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-TST-001
Sprinkler System Test ReportTest ReportFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-TST-002
Fire Alarm Response and Zone Test ReportTest ReportFire Safety & Fighting
IS 2189IS 15105IS 2175+1
QC-FIR-TST-003
Daily Site Safety Walk ChecklistChecklistHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-CHK-001
Site Emergency Response PlanPlanHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PLN-001
Work at Height PermitFormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-001
Hot Work Permit (Welding, Cutting, Grinding)FormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-002
Confined Space Entry PermitFormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-003
Lifting Plan & Crane Operation PermitFormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-004
Excavation & Trenching PermitFormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-005
Electrical Isolation & LOTO PermitFormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-006
Hazardous Material Handling PermitFormHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-PRM-007
PPE Issue & Return RegisterRegisterHSE Permits & Safety
IS 3696IS 14489NBC 2016
QC-HSE-REG-001
Excavation & Earthwork Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-001
Piling Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-002
Shuttering / Formwork Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-003
Rebar Work Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-004
Concreting Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-005
Masonry Work Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-006
Plastering Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-007
Waterproofing Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-008
Painting Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-009
Pre-Commissioning Method StatementFormMethod Statements
IS 456IS 2911IS 1786+1
QC-MST-FRM-010
Mockup Approval ChecklistChecklistSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-CHK-001
Project Handover ChecklistChecklistSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-CHK-002
Request For Inspection (RFI)FormSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-FRM-001
Request For Approval (RFA)FormSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-FRM-002
Snag List RegisterRegisterSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-REG-001
Defect Liability Period (DLP) RegisterRegisterSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-REG-002
Non-Conformance Report (NCR) LogRegisterSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-REG-003
Site Observation RegisterRegisterSite Paperwork & Coordination
ISO 9001NBC 2016IS 4082
QC-SPW-REG-004
Daily Progress Report (DPR)RegisterReports & Site Diary
ISO 9001NBC 2016IS 4082
QC-RPT-REG-001
Weekly Progress Report (WPR)RegisterReports & Site Diary
ISO 9001NBC 2016IS 4082
QC-RPT-REG-002
Daily Manpower ReportRegisterReports & Site Diary
ISO 9001NBC 2016IS 4082
QC-RPT-REG-003
Equipment Log & Downtime RegisterRegisterReports & Site Diary
ISO 9001NBC 2016IS 4082
QC-RPT-REG-004
Material Consumption RegisterRegisterReports & Site Diary
ISO 9001NBC 2016IS 4082
QC-RPT-REG-005
Cement Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-001
Steel Rebar Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-002
Aggregate Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-003
Chemical Admixture Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-004
Tile Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-005
Paint Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-006
Pipe Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-007
Electrical Cable Material Test Certificate (MTC) Receipt VerificationTest ReportMaterial Test Certificates (MTC)
IS 269IS 1786IS 383+1
QC-MTC-TST-008
Sample Dispatch Form (Chain of Custody)FormTesting Lab
ISO 17025IS 1199IS 2720
QC-TLB-FRM-001
Test Equipment Calibration RegisterRegisterTesting Lab
ISO 17025IS 1199IS 2720
QC-TLB-REG-001
Lab Test Equipment RegisterRegisterTesting Lab
ISO 17025IS 1199IS 2720
QC-TLB-REG-002
Field Slump Test RecordTest ReportTesting Lab
ISO 17025IS 1199IS 2720
QC-TLB-TST-001
Field Density Test Record (Sand Replacement / Core Cutter)Test ReportTesting Lab
ISO 17025IS 1199IS 2720
QC-TLB-TST-002
Internal QA Audit ChecklistChecklistAudit & Review
ISO 9001ISO 19011IS 14489
QC-AUD-CHK-001
Surveillance / Third-Party Audit ChecklistChecklistAudit & Review
ISO 9001ISO 19011IS 14489
QC-AUD-CHK-002
Client Walkthrough ChecklistChecklistAudit & Review
ISO 9001ISO 19011IS 14489
QC-AUD-CHK-003
Corrective Action Request (CAR) TrackerRegisterAudit & Review
ISO 9001ISO 19011IS 14489
QC-AUD-REG-001
Lessons Learned RegisterRegisterAudit & Review
ISO 9001ISO 19011IS 14489
QC-AUD-REG-002
Surface Preparation ChecklistChecklistPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-CHK-001
Primer & Undercoat Application ChecklistChecklistPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-CHK-002
Finish Coat Application & DFT ChecklistChecklistPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-CHK-003
Painting Method StatementFormPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-FRM-001
Painting Works Inspection & Test Plan (ITP)PlanPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-PLN-001
Painting Works RegisterRegisterPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-REG-001
Dry Film Thickness (DFT) Test ReportTest ReportPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-TST-001
Paint Adhesion (Cross-Cut) Test ReportTest ReportPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-TST-002
Paint Visual Quality & Finish ReportTest ReportPainting & Coatings
IS 5411IS 2395IS 101
QC-PNT-TST-003
Floor Substrate Preparation ChecklistChecklistFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-CHK-001
Tile/Stone Laying Inspection ChecklistChecklistFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-CHK-002
Grouting & Curing ChecklistChecklistFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-CHK-003
Flooring Method StatementFormFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-FRM-001
Flooring Works ITPPlanFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-PLN-001
Flooring Installation RegisterRegisterFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-REG-001
Floor Tile Adhesion Pull-Off Test ReportTest ReportFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-TST-001
Slip Resistance Test ReportTest ReportFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-TST-002
Tile Water Absorption Test ReportTest ReportFlooring & Finishing
IS 1237IS 13801IS 15622
QC-FLR-TST-003
Roof Sheet Installation ChecklistChecklistRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-CHK-001
Insulation Laying ChecklistChecklistRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-CHK-002
Roof Waterproofing ChecklistChecklistRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-CHK-003
Roofing Installation Method StatementFormRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-FRM-001
Roofing Works ITPPlanRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-PLN-001
Roofing Installation RegisterRegisterRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-REG-001
Thermal Conductivity Test ReportTest ReportRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-TST-001
Insulation Water Absorption Test ReportTest ReportRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-TST-002
Roof Load/Pull-Out Test ReportTest ReportRoofing & Insulation
IS 277IS 13592IS 5454+1
QC-ROF-TST-003
Scaffold Erection Inspection ChecklistChecklistScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-CHK-001
Daily Scaffold Inspection ChecklistChecklistScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-CHK-002
PPE & Fall Protection Inspection ChecklistChecklistScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-CHK-003
Work at Height Safety ChecklistChecklistScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-CHK-004
Scaffold Erection/Dismantling Method StatementFormScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-FRM-001
Safety Management PlanFormScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-FRM-002
Safety Works ITPPlanScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-PLN-001
Scaffold Inspection RegisterRegisterScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-REG-001
Scaffold Load Capacity Test ReportTest ReportScaffolding & Safety
IS 3696IS 2750IS 14489
QC-SCF-TST-001
Duct Installation ChecklistChecklistHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-CHK-001
AHU/FCU Installation ChecklistChecklistHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-CHK-002
HVAC Insulation ChecklistChecklistHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-CHK-003
HVAC Installation Method StatementFormHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-FRM-001
HVAC Installation ITP (Inspection and Test Plan)PlanHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-PLN-001
HVAC Installation RegisterRegisterHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-REG-001
Air Flow Measurement Test ReportTest ReportHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-TST-001
Duct Leakage Test ReportTest ReportHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-TST-002
Testing Adjusting Balancing (TAB) ReportTest ReportHVAC & Air Conditioning
IS 3103IS 14665
QC-HVC-TST-003
Lift Shaft Construction ChecklistChecklistLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-CHK-001
Guide Rail & Car Installation ChecklistChecklistLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-CHK-002
Electrical & Commissioning ChecklistChecklistLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-CHK-003
Lift Installation Method StatementFormLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-FRM-001
Lift Installation RegisterRegisterLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-REG-001
Lift Load Test ReportTest ReportLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-TST-001
Safety Device Test ReportTest ReportLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-TST-002
Speed & Performance Test ReportTest ReportLifts & Escalators
IS 14665IS 1860IS 15785
QC-LFT-TST-003
Pipe Receiving ChecklistChecklistPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-CHK-001
Joint & Support ChecklistChecklistPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-CHK-002
Pressure Test Prep ChecklistChecklistPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-CHK-003
Piping Method StatementFormPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-FRM-001
Piping System ITPPlanPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-PLN-001
Piping RegisterRegisterPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-REG-001
Hydrostatic Test ReportTest ReportPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-TST-001
Ring Stiffness Test ReportTest ReportPiping Systems (Plastic)
IS 4985IS 14333IS 15328
QC-PIP-TST-002
Door/Window Frame Installation ChecklistChecklistDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-CHK-001
Shutter Fitting and Glazing ChecklistChecklistDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-CHK-002
Hardware and Sealant Installation ChecklistChecklistDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-CHK-003
Door/Window Installation Method StatementFormDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-FRM-001
Door and Window Installation ITP (Inspection and Test Plan)PlanDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-PLN-001
Door and Window Installation RegisterRegisterDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-REG-001
Door/Window Dimensional Check ReportTest ReportDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-TST-001
Door/Window Operation and Performance Test ReportTest ReportDoors, Windows & Hardware
IS 4351IS 1948IS 1361+1
QC-DWH-TST-002
Timber Receiving ChecklistChecklistTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-CHK-001
Treatment Verification ChecklistChecklistTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-CHK-002
Carpentry & Joinery ChecklistChecklistTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-CHK-003
Timber Method StatementFormTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-FRM-001
Timber Works ITPPlanTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-PLN-001
Timber Material RegisterRegisterTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-REG-001
Moisture Content Test ReportTest ReportTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-TST-001
Preservative Retention Test ReportTest ReportTimber & Wood
IS 1141IS 401IS 4021+2
QC-TMB-TST-002
Cement Receiving Inspection ChecklistChecklistCement
IS 269IS 8112IS 12269+2
QC-CEM-CHK-001
Cement Storage & Handling ChecklistChecklistCement
IS 269IS 8112IS 12269+2
QC-CEM-CHK-002
Cement Storage & Handling Method StatementFormCement
IS 269IS 8112IS 12269+2
QC-CEM-FRM-001
Cement Quality Inspection & Test Plan (ITP)PlanCement
IS 269IS 8112IS 12269+2
QC-CEM-PLN-001
Cement Receipt & Consumption RegisterRegisterCement
IS 269IS 8112IS 12269+2
QC-CEM-REG-001
Cement Physical Tests ReportTest ReportCement
IS 269IS 8112IS 12269+2
QC-CEM-TST-001
Cement Chemical Analysis ReportTest ReportCement
IS 269IS 8112IS 12269+2
QC-CEM-TST-002
Cement Mortar Cube Compressive Strength ReportTest ReportCement
IS 269IS 8112IS 12269+2
QC-CEM-TST-003
Aggregate Receiving Inspection ChecklistChecklistAggregates & Sand
IS 383IS 2386
QC-AGG-CHK-001
Aggregate Stockpile Management ChecklistChecklistAggregates & Sand
IS 383IS 2386
QC-AGG-CHK-002
Aggregate Processing & Stockpile Method StatementFormAggregates & Sand
IS 383IS 2386
QC-AGG-FRM-001
Aggregate Quality Inspection & Test Plan (ITP)PlanAggregates & Sand
IS 383IS 2386
QC-AGG-PLN-001
Aggregate Receipt & Stock RegisterRegisterAggregates & Sand
IS 383IS 2386
QC-AGG-REG-001
Aggregate Sieve Analysis ReportTest ReportAggregates & Sand
IS 383IS 2386
QC-AGG-TST-001
Aggregate Physical Properties ReportTest ReportAggregates & Sand
IS 383IS 2386
QC-AGG-TST-002
Aggregate Chemical Tests ReportTest ReportAggregates & Sand
IS 383IS 2386
QC-AGG-TST-003
Borehole Logging ChecklistChecklistSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-CHK-001
Survey Control Verification ChecklistChecklistSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-CHK-002
Setting Out ChecklistChecklistSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-CHK-003
Geotechnical Investigation Method StatementFormSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-FRM-001
Surveying & Geotechnical ITPPlanSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-PLN-001
Survey & Investigation RegisterRegisterSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-REG-001
Cone Penetration Test ReportTest ReportSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-TST-001
Permeability Test ReportTest ReportSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-TST-002
Rock Core UCS Test ReportTest ReportSurveying & Geotechnical
IS 1892IS 5529IS 6926+1
QC-SRV-TST-003
Receiving Inspection ChecklistChecklistGeneric Master Forms
QC-GEN-CHK-001
Pre-Activity / Pre-Work ChecklistChecklistGeneric Master Forms
QC-GEN-CHK-002
Safety Audit ChecklistChecklistGeneric Master Forms
QC-GEN-CHK-003
Material Approval RequestFormGeneric Master Forms
QC-GEN-FRM-001
Material Test Certificate VerificationFormGeneric Master Forms
QC-GEN-FRM-002
Lab Test Request FormFormGeneric Master Forms
QC-GEN-FRM-003
Method Statement TemplateFormGeneric Master Forms
QC-GEN-FRM-004
Non-Conformance Report (NCR)FormGeneric Master Forms
QC-GEN-FRM-005
Corrective Action Report (CAR)FormGeneric Master Forms
QC-GEN-FRM-006
Work Completion CertificateFormGeneric Master Forms
QC-GEN-FRM-007
Hold Point ReleaseFormGeneric Master Forms
QC-GEN-FRM-008
Document TransmittalFormGeneric Master Forms
QC-GEN-FRM-009
Incident / Accident ReportFormGeneric Master Forms
QC-GEN-FRM-010
Risk Assessment FormFormGeneric Master Forms
QC-GEN-FRM-011
Work PermitFormGeneric Master Forms
QC-GEN-FRM-012
Inspection & Test Plan (ITP)PlanGeneric Master Forms
QC-GEN-PLN-001
Sample Collection RegisterRegisterGeneric Master Forms
QC-GEN-REG-001
Daily Inspection LogRegisterGeneric Master Forms
QC-GEN-REG-002
Generic Lab Test ReportTest ReportGeneric Master Forms
QC-GEN-TST-001

What is QA/QC in civil construction and why templates matter

Quality Assurance (QA) and Quality Control (QC) are the two complementary halves of construction quality management. QA is *process-oriented* — it's about setting up systems, procedures, and documentation to ensure quality can be achieved consistently (method statements, inspection plans, training, audits). QC is *product-oriented* — it's about actually verifying that individual work items meet specifications (cube tests, sieve analysis, rebar inspection, finish checks).

Every civil project of any significance has a QA/QC plan — mandated by the contract, enforced by the client or PMC consultant, and audited by regulatory bodies. For residential and small commercial work, it's often light (material test certificates, cube test reports, snag lists). For infrastructure (bridges, highways, dams, high-rise) and industrial projects (refineries, power plants), it's extensive — hundreds of checklists, test formats, and registers per work package.

InfraLens provides 300 QA/QC templates organized by work family (Concrete, Steel, Aggregates, Cement, Soil, Finishes, Formwork, Piling, Waterproofing, Painting, Electrical, Plumbing, Fire Safety, HVAC, Bridges, Tunnels, Ports, Highways, Roofing, etc.). Every template references the relevant IS code or IRC code — e.g., concrete cube test format references IS 516:2021, sieve analysis references IS 2386 Part 1, TMT bar inspection references IS 1786. Templates are in Excel (with formulas and dropdowns) and PDF (print-ready for field use).

How to use QA/QC templates effectively on your project

Start by mapping the templates you need against your project's scope: make a list of all work packages (excavation, PCC, RCC, masonry, plaster, tile, steel erection, painting, waterproofing, MEP), then pull the relevant checklists, test formats, and registers for each. A residential building typically needs 30-50 templates; a commercial highrise 80-120; a bridge project 150+; a large industrial project 200+.

The three core template types: (1) Checklists — pre-pour concrete, pre-shotcrete rebar check, formwork alignment, brick layer inspection — used by site supervisors before or after an activity. (2) Test Reports — cube compression (IS 516), slump test (IS 1199), sieve analysis (IS 2386), cement consistency (IS 4031) — filled by the lab technician, signed by QC engineer. (3) Registers — concrete pour log, material inward, NCR register, test report summary — cumulative records maintained throughout the project.

Best practice: start each work package with the checklist, use the test format whenever a test is conducted, update the register daily/weekly. Share monthly summaries with the PMC/client. Close out every NCR raised. Keep the QA/QC file current and accessible — during ISO audits or client inspections, a well-maintained QA/QC file tells 80% of the quality story.

Frequently Asked Questions

12 common questions about this topic, answered by civil engineers.

What's the difference between QA and QC?+

QA (Quality Assurance) is process-focused — ensuring the systems exist to deliver quality. Activities: writing method statements, training workers, inspection test plans (ITP), internal audits, management reviews. QC (Quality Control) is product-focused — actually testing and inspecting the work. Activities: cube tests, dimensional checks, finish inspection, material test reports. QA prevents defects; QC detects defects. A good project has both — strong processes (QA) plus thorough inspection (QC). ISO 9001 is the global standard for quality management systems that governs both.

Which IS code specifies concrete cube test frequency?+

IS 456:2000 Clause 15 and IS 516:2021 together govern concrete quality testing. Cube test frequency per IS 456 Clause 15.2.1: 1 set of 3 cubes per 1 m³ up to 5 m³, then 1 set per 5 m³ up to 25 m³, then 1 set per 25 m³ up to 50 m³, then 1 set per 50 m³ up to 100 m³, then 1 set per 100 m³. Cubes tested at 28 days (also 7 days for intermediate check). Acceptance criteria: individual cubes >0.85×fck + 3 MPa; mean of 4 consecutive cubes >fck + 3 MPa (M15-M20) or fck + 4 MPa (M25+).

What is an Inspection Test Plan (ITP)?+

An ITP is a document that lists every inspection and test required for a specific work package, the frequency, the acceptance criteria, who carries it out, and who verifies/witnesses. Columns typically: activity, specification reference (IS code clause), inspection method, frequency, acceptance criteria, responsibility (contractor/consultant/third-party lab), record format (the test report template used), hold points (H = mandatory witness by consultant), review points (R = consultant reviews records). ITPs are the backbone of any QA/QC plan — a typical civil ITP might have 100-200 line items for an RCC building.

What is a hold point and a review point in an ITP?+

Hold Point (H): work cannot proceed past this point without the consultant/client present for inspection. Example: pre-pour rebar inspection before concrete is cast — if the consultant isn't there, the pour is delayed. Hold points are for critical, irreversible steps. Review Point (R) or Witness Point (W): consultant reviews records after the fact (not in real-time). Example: reviewing cube test reports in monthly meeting. Information Point (I): contractor informs consultant but no action required. Hold points are the strongest control; they're used sparingly for high-impact quality gates.

Which IS code is used for steel reinforcement inspection?+

IS 1786:2008 — the TMT bar specification — has the acceptance criteria: Fe 415 UTS 485 MPa, yield 415 MPa, elongation 14.5% min; Fe 500 UTS 545 MPa, yield 500, elongation 12% min; Fe 500D UTS 565 MPa, yield 500, elongation 16% min (ductile, for seismic zones III-V). Inspection checklist: manufacturer's test certificate (MTC), ISI mark, rolling mark visible, bar size by weight (IS 1786 Table 3 tolerances), surface condition (no rust flakes), bend test per IS 1599, rebend test per IS 1786. Sample 1 set per 25-30 tonne delivery lot.

What should be checked before a concrete pour?+

Our pre-pour checklist covers: (1) Rebar — diameter, spacing, cover, lap position, lap length, binding wire, cleanliness (no rust/oil/grease); (2) Formwork — alignment, plumb, level, tightness, release agent applied, inspection holes accessible; (3) Embedded items — plumbing sleeves, electrical conduits, anchor bolts, dowels — confirmed per drawings; (4) Construction joint preparation — roughened, cleaned, kept wet, pre-bonding agent applied; (5) Concrete placement — mix design approved, slump test equipment ready, cube mould ready, vibrator checked, curing material on standby; (6) Weather — no rain forecast, temperature 5-35°C. Signed by site engineer + consultant. Checklist is a hold point — pour doesn't start until it's green.

What is a Non-Conformance Report (NCR) and how do I manage one?+

An NCR is raised when work is found not in conformance with specifications — cube test fail, rebar cover less than specified, dimensional deviation outside tolerance, wrong finish. NCR workflow: (1) Raise — site supervisor or consultant identifies non-conformance, writes NCR with description, references, photos, (2) Classify — minor (rework easy, no structural impact), major (rework required, schedule impact), critical (removal/redo), (3) Disposition — accept as-is (with concession), rework, repair, reject/remove, (4) Corrective action — fix the immediate issue, (5) Preventive action — fix the root cause (training, revised method, better supervision), (6) Close-out — consultant signs off. All NCRs tracked in the NCR Register with open/closed status.

What tests are done on cement before use?+

Per IS 4031 (Methods of Physical Tests for Hydraulic Cement — 15 parts) and IS 4032 (Chemical Analysis): (1) Fineness (Blaine's method, IS 4031 Part 2) — min 225 m²/kg for OPC 33, 225 for 43, 370 for 53; (2) Standard consistency (IS 4031 Part 4); (3) Setting time (initial not less than 30 min, final not more than 600 min); (4) Compressive strength of mortar cubes at 3, 7, 28 days per grade; (5) Soundness (Le Chatelier method, IS 4031 Part 3); (6) Heat of hydration (for low-heat cement); (7) Chloride content (max 0.05% per IS 456). Sample 1 per 100 tonnes of cement delivery.

Which IS codes are used for aggregate testing?+

IS 2386 — Methods of Test for Aggregates — has 8 parts: Part 1 (particle size & shape — sieve analysis, flakiness, elongation), Part 2 (estimation of deleterious materials), Part 3 (specific gravity, density, voids, water absorption, bulking), Part 4 (mechanical properties — abrasion, impact, crushing value), Part 5 (soundness), Part 6 (measuring mortar making properties), Part 7 (alkali-aggregate reactivity), Part 8 (petrographic examination). IS 383:2016 — Coarse and Fine Aggregates for Concrete — specification: grading zones, deleterious limits, crushing value ≤30%, impact ≤30%, abrasion ≤30%. Test frequency: 1 set per 50 m³ of aggregate or per source change.

Are these templates compliant with ISO 9001 and NABL requirements?+

The templates follow ISO 9001:2015 principles (process approach, risk-based thinking, traceability, document control) — they can be used as-is within an ISO 9001 quality management system. Individual test format templates capture the data required by NABL (National Accreditation Board for Testing and Calibration Laboratories) for accredited lab reports: sample identification, test method reference (IS code + clause), environmental conditions, equipment calibration status, result and uncertainty, signatures. For formal NABL accreditation of your in-house lab, additional documentation (quality manual, procedures, SOPs, calibration records) is required beyond what the templates cover.

How are the 300 templates organized?+

Templates are organized by family (work package): Concrete (~60 templates), Steel & Reinforcement (~25), Aggregates (~20), Cement (~15), Soil & Earthwork (~25), Formwork & Shuttering (~15), Brickwork & Masonry (~20), Plastering (~15), Flooring & Tiling (~15), Painting & Finishes (~15), Waterproofing (~10), MEP — Electrical & Plumbing (~25), Fire Safety (~10), Bridges — Specific (~15), Roads & Pavement (~15), Piling (~10), Others (~20). Each family has checklists, test formats, and registers. The total adds up to ~300 templates. Filter by family on the /qaqc page.

Do the QA/QC templates work for international projects?+

The templates are based on Indian Standards (IS) and MoRTH specifications — they work directly on Indian projects. For international projects using ASTM, EN, BS, or AS/NZS standards, the format (checklist/test/register structure) is universally applicable, but the specific acceptance criteria and test methods need to be mapped to the contract-specified code. Our templates show the IS code reference clearly so you can identify what to replace (e.g., "Concrete cube test per IS 516:2021" becomes "Concrete cube test per ASTM C39" on an ASTM-referenced project). The structural logic of the template doesn't change.

Related resources on InfraLens