Checklist Preview

S.No.CheckpointIS RequirementStatus
A. MATERIAL VERIFICATION & CERTIFICATION
A1Sealant/waterproofing material has valid product datasheet and safety certificate
Acceptance: Datasheet provided; Material grade specified; Expiry date valid; Proper storage verified
Cl. 3 — Material certification
OK
NC
NA
HOLD
A2Sealant type compatible with metal substrate (non-corrosive, adhesive properties confirmed)
Acceptance: Compatible per datasheet; No staining or corrosion on test surfaces; Proper primer applied
Cl. 4 — Material compatibility
OK
NC
NA
HOLD
A3Sealant stored in dry, cool location; containers sealed and protected from UV exposure
Acceptance: Storage <25°C; Containers unopened until use; No skin formation; Within shelf life (typically 12 months)
Cl. 5 — Storage conditions
OK
NC
NA
HOLD
B. JOINT & SEAM PREPARATION
B1All roof joints, seams, and overlaps identified and marked for waterproofing treatment
Acceptance: All laps, ridge caps, eaves, and penetrations marked; No joints missed
Cl. 6.1 — Joint mapping
OK
NC
NA
HOLD
B2Joint surfaces cleaned: dust, rust, paint chips, and loose material removed
Acceptance: Surfaces swept/wire brushed; No loose scale or paint; Visual inspection confirms cleanliness
Cl. 6.2 — Surface cleaning
OK
NC
NA
HOLD
B3Joint surfaces wiped with solvent/cloth to remove dust and moisture residue
Acceptance: Surfaces dry; No visible moisture; Wiped with clean lint-free cloth post-cleaning
Cl. 6.3 — Moisture removal
OK
NC
NA
HOLD
B4Primer application where required per sealant datasheet (typically for metal surfaces)
Acceptance: Primer applied per datasheet; Even coverage; Drying time observed (typically 10-30 min)
Cl. 6.4 — Priming requirement
OK
NC
NA
HOLD
C. SEALANT APPLICATION
C1Sealant applied in continuous bead along entire joint length; no gaps or skips
Acceptance: Continuous bead observed; No gaps >2mm; All seams fully covered
Cl. 7.1 — Continuity requirement
OK
NC
NA
HOLD
C2Bead width and depth appropriate for joint type (typically 10-20mm wide, 5-10mm deep)
Acceptance: Width 10-20mm; Depth 5-10mm for metal joints; Uniform cross-section
Cl. 7.2 — Bead profile specification
OK
NC
NA
HOLD
C3Sealant adheres fully to joint sides; no air bubbles, voids, or poor bonding visible
Acceptance: Full adhesion to sides; No voids; Probe test shows solid contact (no separation)
Cl. 7.3 — Bond quality
OK
NC
NA
HOLD
C4Sealant cured per datasheet time (typically 24-48 hours before water exposure)
Acceptance: Minimum cure time observed; Surface tack-free; No premature water/moisture contact
Cl. 7.4 — Curing duration
OK
NC
NA
HOLD
Showing 11 of 20 checkpoints ·
A. MATERIAL VERIFICATION & CERTIFICATION
A1Sealant/waterproofing material has valid product datasheet and safety certificate
Cl. 3 — Material certification (IS 2645)
Datasheet provided; Material grade specified; Expiry date valid; Proper storage verified
OKNCNAHOLD
A2Sealant type compatible with metal substrate (non-corrosive, adhesive properties confirmed)
Cl. 4 — Material compatibility (IS 13592)
Compatible per datasheet; No staining or corrosion on test surfaces; Proper primer applied
OKNCNAHOLD
A3Sealant stored in dry, cool location; containers sealed and protected from UV exposure
Cl. 5 — Storage conditions (IS 2645)
Storage <25°C; Containers unopened until use; No skin formation; Within shelf life (typically 12 months)
OKNCNAHOLD
B. JOINT & SEAM PREPARATION
B1All roof joints, seams, and overlaps identified and marked for waterproofing treatment
Cl. 6.1 — Joint mapping (IS 13592)
All laps, ridge caps, eaves, and penetrations marked; No joints missed
OKNCNAHOLD
B2Joint surfaces cleaned: dust, rust, paint chips, and loose material removed
Cl. 6.2 — Surface cleaning (IS 2645)
Surfaces swept/wire brushed; No loose scale or paint; Visual inspection confirms cleanliness
OKNCNAHOLD
B3Joint surfaces wiped with solvent/cloth to remove dust and moisture residue
Cl. 6.3 — Moisture removal (IS 2645)
Surfaces dry; No visible moisture; Wiped with clean lint-free cloth post-cleaning
OKNCNAHOLD
B4Primer application where required per sealant datasheet (typically for metal surfaces)
Cl. 6.4 — Priming requirement (IS 13592)
Primer applied per datasheet; Even coverage; Drying time observed (typically 10-30 min)
OKNCNAHOLD
C. SEALANT APPLICATION
C1Sealant applied in continuous bead along entire joint length; no gaps or skips
Cl. 7.1 — Continuity requirement (IS 2645)
Continuous bead observed; No gaps >2mm; All seams fully covered
OKNCNAHOLD
C2Bead width and depth appropriate for joint type (typically 10-20mm wide, 5-10mm deep)
Cl. 7.2 — Bead profile specification (IS 2645)
Width 10-20mm; Depth 5-10mm for metal joints; Uniform cross-section
OKNCNAHOLD
C3Sealant adheres fully to joint sides; no air bubbles, voids, or poor bonding visible
Cl. 7.3 — Bond quality (IS 2645)
Full adhesion to sides; No voids; Probe test shows solid contact (no separation)
OKNCNAHOLD
C4Sealant cured per datasheet time (typically 24-48 hours before water exposure)
Cl. 7.4 — Curing duration (IS 2645)
Minimum cure time observed; Surface tack-free; No premature water/moisture contact
OKNCNAHOLD
Showing 11 of 20 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — NCR RAISED
Remarks
Name / Sign / Date
Inspected By
Name / Sign / Date
Reviewed By
Name / Sign / Date