QA/QC  › Roofing & Insulation  › Roof Sheet Installation
Checklist · QC-ROF-CHK-001
Roof Sheet Installation Checklist
18 checkpoints across 5 sections. During roofing sheet installation and before final acceptance
18 Checkpoints
5 Sections
Per installation batch or per 500 m² of roof area
QC Engineer, Site Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. MATERIAL INSPECTION
A1Sheets are of correct type, grade and gauge per order specifications
Acceptance: Gauge matches approved drawing; Galvanizing per IS 277 Table 1
Cl. 4.2 — Conformance to specification
OK
NC
NA
HOLD
A2Sheets are visually inspected for defects (dents, deformation, corrosion, coating damage)
Acceptance: No visible damage, dents <2mm, galvanizing uniform without flaking
Cl. 5.1 — Surface condition requirements
OK
NC
NA
HOLD
A3Sheets stored on level, raised platforms with protection from moisture
Acceptance: Storage 1m above ground; ventilation gaps maintained; no pooling water
Cl. 6 — Storage and handling
OK
NC
NA
HOLD
B. ROOF STRUCTURE & SUBSTRATE
B1Roof structure (purlins/trusses) inspected and confirmed free from defects
Acceptance: All purlins level (±5mm/m); fasteners tight; no buckling or cracks
Clause 7.1 — Structural readiness
OK
NC
NA
HOLD
B2Roof slope/pitch matches design (minimum 1:12 for water drainage)
Acceptance: Slope 1:12 minimum measured; variation ±5mm per 1m
Cl. 7.2 — Slope requirement
OK
NC
NA
HOLD
B3Underlayment/breathable membrane installed before sheet laying
Acceptance: Membrane continuous, overlapped 150mm, no tears, stapled/fixed at 300mm c/c
Cl. 7.3 — Moisture protection
OK
NC
NA
HOLD
C. SHEET LAYING & FIXING
C1Sheets laid in correct direction (corrugations perpendicular to slope; ridge toward up-slope)
Acceptance: Corrugations perpendicular; no reversed sheets; consistent across roof
Cl. 8.1 — Installation orientation
OK
NC
NA
HOLD
C2Sheets overlapped 150-200mm along slope direction (1.5-2 corrugations)
Acceptance: Overlap measured 150-200mm; consistent across sheets; no undulating joints
Cl. 8.2 — Overlap requirement
OK
NC
NA
HOLD
C3End-to-end lap joints are minimum 100mm with sealant application
Acceptance: Lap ≥100mm; sealant applied full width; no gaps or skips
Cl. 8.3 — End lap sealing
OK
NC
NA
HOLD
C4Fastening: one fastener per corrugation valley in each purlin intersection
Acceptance: Fasteners at every valley at purlin; spacing ≤300mm; no skipped bays
Cl. 8.4 — Fastening specification
OK
NC
NA
HOLD
C5Fasteners are stainless steel or hot-dip galvanized (matching sheet material)
Acceptance: Fasteners stainless or galvanized; washers used; no rust/oxidation at heads
Cl. 8.5 — Fastener material compatibility
OK
NC
NA
HOLD
C6Fastener holes are sealed with neoprene washers; no water pooling under heads
Acceptance: Neoprene washers intact; no water entry visible; washers 20-25mm diameter
Cl. 8.6 — Leak prevention
OK
NC
NA
HOLD
Showing 12 of 18 checkpoints ·
A. MATERIAL INSPECTION
A1Sheets are of correct type, grade and gauge per order specifications
Cl. 4.2 — Conformance to specification (IS 13592)
Gauge matches approved drawing; Galvanizing per IS 277 Table 1
OKNCNAHOLD
A2Sheets are visually inspected for defects (dents, deformation, corrosion, coating damage)
Cl. 5.1 — Surface condition requirements (IS 13592)
No visible damage, dents <2mm, galvanizing uniform without flaking
OKNCNAHOLD
A3Sheets stored on level, raised platforms with protection from moisture
Cl. 6 — Storage and handling (IS 13592)
Storage 1m above ground; ventilation gaps maintained; no pooling water
OKNCNAHOLD
B. ROOF STRUCTURE & SUBSTRATE
B1Roof structure (purlins/trusses) inspected and confirmed free from defects
Clause 7.1 — Structural readiness (IS 13592)
All purlins level (±5mm/m); fasteners tight; no buckling or cracks
OKNCNAHOLD
B2Roof slope/pitch matches design (minimum 1:12 for water drainage)
Cl. 7.2 — Slope requirement (IS 13592)
Slope 1:12 minimum measured; variation ±5mm per 1m
OKNCNAHOLD
B3Underlayment/breathable membrane installed before sheet laying
Cl. 7.3 — Moisture protection (IS 13592)
Membrane continuous, overlapped 150mm, no tears, stapled/fixed at 300mm c/c
OKNCNAHOLD
C. SHEET LAYING & FIXING
C1Sheets laid in correct direction (corrugations perpendicular to slope; ridge toward up-slope)
Cl. 8.1 — Installation orientation (IS 13592)
Corrugations perpendicular; no reversed sheets; consistent across roof
OKNCNAHOLD
C2Sheets overlapped 150-200mm along slope direction (1.5-2 corrugations)
Cl. 8.2 — Overlap requirement (IS 13592)
Overlap measured 150-200mm; consistent across sheets; no undulating joints
OKNCNAHOLD
C3End-to-end lap joints are minimum 100mm with sealant application
Cl. 8.3 — End lap sealing (IS 13592)
Lap ≥100mm; sealant applied full width; no gaps or skips
OKNCNAHOLD
C4Fastening: one fastener per corrugation valley in each purlin intersection
Cl. 8.4 — Fastening specification (IS 13592)
Fasteners at every valley at purlin; spacing ≤300mm; no skipped bays
OKNCNAHOLD
C5Fasteners are stainless steel or hot-dip galvanized (matching sheet material)
Cl. 8.5 — Fastener material compatibility (IS 277)
Fasteners stainless or galvanized; washers used; no rust/oxidation at heads
OKNCNAHOLD
C6Fastener holes are sealed with neoprene washers; no water pooling under heads
Cl. 8.6 — Leak prevention (IS 13592)
Neoprene washers intact; no water entry visible; washers 20-25mm diameter
OKNCNAHOLD
Showing 12 of 18 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — NCR RAISED
Remarks
Name / Sign / Date
Inspected By
Name / Sign / Date
Reviewed By
Name / Sign / Date