Schedule of Rates · Tripura PWD

Tripura PWD Schedule of Rates

Authority:PWD Tripura (R&B + Buildings + Water Resources)Region:TripuraDocuments:4
4 latest editions — direct from official sources, free
Tripura PWD SOR 2023 (R&B + Buildings)
Index page with PDF download links
compositeVerified↓ Download
Tripura PWD-PMGSY SOR 2023
rural roadsVerified↓ Download
Tripura PWD-WR Analysis of Rates 2023
Companion AOR volume
water supplyVerified↓ Download
Tripura PWD-WR SoR 2023
Water Resources wing — separate from R&B+Buildings
water supplyVerified↓ Download
Official portal: https://pwd.tripura.gov.in/index.php/business/schedule-of-rates
Tripura PWD publishes Schedule of Rates 2023 covering R&B (Roads & Bridges) and Buildings as a unified document. The Water Resources wing publishes a separate SoR 2023 for irrigation, embankment and river-training works, with its own Analysis of Rates companion volume. Both are current as of 2026.

About Public Works Department, Government of Tripura

Tripura's hilly NE geography (Khasi-Jaintia ranges in the south, Lushai hills in the east) and 2,500-3,000mm annual rainfall drive specific rate considerations. The PWD SOR 2023 covers Agartala, Udaipur, Dharmanagar, Kailashahar projects with hilly-terrain factors built in. The Water Resources Dept publishes a parallel SoR for irrigation (embankments along the Gomti, Howrah, Khowai rivers) and for the state's flood-management programme. PMGSY rural-roads works in Tripura have a separate dedicated PDF on the PWD portal.

Frequently Asked Questions

Are PWD R&B and PWD Buildings the same SOR?

Yes — Tripura's PWD SOR 2023 covers both as a unified document. R&B (Roads & Bridges) and Buildings divisions reference the same rate schedule; only the work category and chapter sub-section differ.

What is PWD-WR?

Tripura's Water Resources wing within PWD. Handles irrigation, embankments, flood protection, river training. Publishes a separate SoR 2023 plus Analysis of Rates volume — both available on pwdwr.tripura.gov.in.

Does PMGSY-Tripura have its own SOR?

PMGSY-Tripura uses PWD SOR 2023 with PMGSY adoption circular methodology. There's a separately published PMGSY-Tripura PDF (SOR_2023_PWDPMGSY.pdf) that essentially extracts rural-roads-relevant items with adoption notes.

Are NE state factors built in?

Yes. Tripura PWD SOR 2023 has hilly-terrain factors for southern (Sipahijala, Gomati, South Tripura) and eastern (Dhalai, North Tripura, Unakoti) districts. Northern plain districts (Khowai, West Tripura) use plain-area rates.

How often is Tripura SOR revised?

Approximately every 3-4 years. SOR 2023 is current; previous edition was 2019. Mid-cycle gazette amendments adjust market-driven items as needed.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.
Page last reviewed: 29 April 2026.