Schedule of Rates · Chhattisgarh

Chhattisgarh Schedule of Rates

Authority:CG PWD · WRD · CSPDCLRegion:ChhattisgarhDocuments:4
4 documents available — direct from official sources, free
Chhattisgarh WRD SOR 2025
Effective 1-May-2025
water supplyVerified↓ Download
Chhattisgarh SOR Reporting Portal (live)
compositeVerified↓ Download
CSPDCL Civil Wing Rates 2024-25
electricalVerified↓ Download
CG PWD NH Zone — Roads & Bridges SoR 2022
roads bridgesVerified↓ Download
Official portal: https://res.cg.gov.in/SOR_New.aspx
Chhattisgarh maintains a multi-department SOR ecosystem with the WRD 2025 SOR (effective 1-May-2025), PWD-NH (National Highways) Roads & Bridges SoR 2022, and CSPDCL Civil Wing Rates 2024-25 for power-distribution civil works. The state also operates a unified live SOR portal at res.cg.gov.in.

About CG PWD / WRD / CSPDCL

Chhattisgarh's coal- and mineral-rich terrain — Bilaspur and Korba's thermal-power belt, Raipur's emerging IT/services hub, Jagdalpur's iron-ore zone, and Bastar's tribal-region projects — drives specific rate frameworks for industrial, mining-area, and remote-region civil works. The state operates an integrated rate-publishing model: a unified live SOR portal at res.cg.gov.in aggregates rates across CG PWD, WRD, and CSPDCL allowing engineers to query by department + discipline + year without downloading individual PDFs. The WRD (Water Resources Department) SOR 2025 (effective 1-May-2025) is the most recently reissued document and covers irrigation, water-resources civil works, dams, barrages and minor irrigation. PWD-NH (National Highways Zone) handles state-share NH works under MoRTH oversight using its own 2022 Roads & Bridges SoR specific to NH works; non-NH state highway and district-road works use the regular CG PWD SOR served via the unified portal. CSPDCL (Chhattisgarh State Power Distribution Co) publishes its Civil Wing Rates 2024-25 covering substation civil works, transmission tower foundations, and distribution-line civil supports — these are the rates used for power-infrastructure tendering inside CG. Naya Raipur Atal Nagar Vikas Pradhikaran (NRDA, the city's planning authority) uses CG PWD SOR as the base rate document with NRDA-specific overheads for the planned city's higher-spec infrastructure including BRT lanes, urban forestry, and IT-park civil works. Major mining-area township works at Korba, Bhilai (under SAIL), and Jagdalpur use a combination of CG PWD SOR for non-restricted areas plus authority/PSU-specific rates for mining-bordered work.

Frequently Asked Questions

What is Chhattisgarh's WRD SOR 2025?

Water Resources Department's 2025 Schedule of Rates, effective 1-May-2025. Covers irrigation, water-resources civil works, dams and barrages. This is the most recent CG SOR reissue.

What is the SOR Reporting Portal?

res.cg.gov.in/SOR_New.aspx — a unified live portal aggregating SORs across CG PWD, WRD, CSPDCL and other departments. Engineers query by department + discipline rather than downloading PDFs.

Why does CG have a separate PWD-NH SOR?

PWD-NH (National Highways Zone) handles state-share NH works in Chhattisgarh under MoRTH oversight. Its 2022 Roads & Bridges SoR is specific to NH works; non-NH state highway works use the regular CG PWD SOR.

What is CSPDCL Civil Wing Rates?

Chhattisgarh State Power Distribution Co's civil works rates — substations, transmission tower foundations, distribution-line civil supports. Used for power-infrastructure tendering inside CG.

Does Naya Raipur Smart City use these SORs?

Naya Raipur Atal Nagar Vikas Pradhikaran (NRDA, the city's planning authority) uses CG PWD SOR as the base rate document with NRDA-specific overheads for the planned city's higher-spec infrastructure.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.
Page last reviewed: 28 April 2026.