QA/QC  › Method Statements  › Painting Method Statement
Form · QC-MST-FRM-009

Painting Method Statement

26 checkpoints across 8 sections. Before starting the activity — submit to consultant for approval
26 Checkpoints
8 Sections
Per activity, per project
Contractor PM, QA/QC Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. SCOPE & REFERENCES
A1Scope: internal emulsion, external textured / weather-shield, enamel on metal/wood, primer systems
Acceptance: All paint systems and surfaces listed; quantities and shades per finishes schedule
Cl. 1 — Scope
OK
NC
NA
HOLD
A2Approved system data sheet, mock-up panel, shade approval, and warranty terms documented
Acceptance: TDS / shade card / 1×1 m mock-up panel approved by client and consultant
Cl. 3 — System approval
OK
NC
NA
HOLD
A3References: IS 2395 (concrete/masonry), IS 2932 (enamel), IS 5411 (emulsion), TDS, drawings
Acceptance: Codes and TDS at workface; finishes drawings approved
Cl. 2 — References
OK
NC
NA
HOLD
B. MATERIALS & EQUIPMENT
B1Paint supplied in original sealed containers; batch numbers; within shelf life
Acceptance: Sealed containers; mfr label; shelf life valid; batch traceability maintained
Cl. 5 — Materials
OK
NC
NA
HOLD
B2Compatible primer / undercoat per system — alkali-resistant for masonry, redoxide for steel, wood primer
Acceptance: Same brand / system; primer per substrate; not mixed across brands
Cl. 6 — Primer
OK
NC
NA
HOLD
B3Tools — brushes, rollers, sprayers, sandpaper, putty, masking tape, drop sheets
Acceptance: Tools clean; rollers per system (smooth/textured); spray gun pressure per TDS
Cl. 6 — Tools
OK
NC
NA
HOLD
C. SITE PREPARATION / PRE-REQUISITES
C1Plaster cured 28 d; moisture <8%; pH ≤9 (alkali-cured) checked by moisture and pH meter
Acceptance: Plaster age ≥28 d; moisture <8%; pH ≤9; readings recorded
Cl. 4 — Substrate
OK
NC
NA
HOLD
C2Surface defects rectified — cracks filled, holes patched, undulations skim-coated, glands smoothened
Acceptance: All defects rectified; surface plane within 3 mm/2 m; no residual cracks >0.2 mm
Cl. 4 — Surface
OK
NC
NA
HOLD
C3Masking of adjacent surfaces — frames, glass, floors, MEP fittings — protected with tape / sheet
Acceptance: All adjacent surfaces masked; floor drop-sheets in place; door / window protection
Cl. 6 — Protection
OK
NC
NA
HOLD
Showing 9 of 26 checkpoints ·
A. SCOPE & REFERENCES
A1Scope: internal emulsion, external textured / weather-shield, enamel on metal/wood, primer systems
Cl. 1 — Scope (IS 2395)
All paint systems and surfaces listed; quantities and shades per finishes schedule
OKNCNAHOLD
A2Approved system data sheet, mock-up panel, shade approval, and warranty terms documented
Cl. 3 — System approval (IS 2395)
TDS / shade card / 1×1 m mock-up panel approved by client and consultant
OKNCNAHOLD
A3References: IS 2395 (concrete/masonry), IS 2932 (enamel), IS 5411 (emulsion), TDS, drawings
Cl. 2 — References (IS 2395)
Codes and TDS at workface; finishes drawings approved
OKNCNAHOLD
B. MATERIALS & EQUIPMENT
B1Paint supplied in original sealed containers; batch numbers; within shelf life
Cl. 5 — Materials (IS 2395)
Sealed containers; mfr label; shelf life valid; batch traceability maintained
OKNCNAHOLD
B2Compatible primer / undercoat per system — alkali-resistant for masonry, redoxide for steel, wood primer
Cl. 6 — Primer (IS 2395)
Same brand / system; primer per substrate; not mixed across brands
OKNCNAHOLD
B3Tools — brushes, rollers, sprayers, sandpaper, putty, masking tape, drop sheets
Cl. 6 — Tools (IS 2395)
Tools clean; rollers per system (smooth/textured); spray gun pressure per TDS
OKNCNAHOLD
C. SITE PREPARATION / PRE-REQUISITES
C1Plaster cured 28 d; moisture <8%; pH ≤9 (alkali-cured) checked by moisture and pH meter
Cl. 4 — Substrate (IS 2395)
Plaster age ≥28 d; moisture <8%; pH ≤9; readings recorded
OKNCNAHOLD
C2Surface defects rectified — cracks filled, holes patched, undulations skim-coated, glands smoothened
Cl. 4 — Surface (IS 2395)
All defects rectified; surface plane within 3 mm/2 m; no residual cracks >0.2 mm
OKNCNAHOLD
C3Masking of adjacent surfaces — frames, glass, floors, MEP fittings — protected with tape / sheet
Cl. 6 — Protection (IS 2395)
All adjacent surfaces masked; floor drop-sheets in place; door / window protection
OKNCNAHOLD
Showing 9 of 26 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — NCR RAISED
Remarks
Name / Sign / Date
Prepared By
Name / Sign / Date
Approved By
Name / Sign / Date