Project Handover Checklist
22 checkpoints across 7 sections. Immediately before formal project handover to client; typically at substantial completion
22 Checkpoints
7 Sections
Once per project (or per sectional handover)
Project Manager, QA Manager

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. PHYSICAL COMPLETION VERIFICATION
A1All works per BOQ / scope complete; no pending items other than DLP-deferred
Acceptance: BOQ 100% measured and certified; only DLP items on defer list; no abandoned work
Cl. 8.6 — Release
OK
NC
NA
HOLD
A2Zero-snag certification issued for all areas; snag register closed
Acceptance: Snag register signed-off with zero open items; consultant/client endorsement
Cl. 10.2 — Nonconformity closed
OK
NC
NA
HOLD
A3Site housekeeping complete: all debris, temporary structures, materials removed
Acceptance: Project area swept clean; no contractor materials; temporary fencing removed
Part 4 — Site readiness
OK
NC
NA
HOLD
A4All statutory approvals obtained: Occupation Certificate, Fire NOC, lift licence, NOCs
Acceptance: OC issued by local authority; Fire NOC by CFO; lift fitness by inspector; filed
Part 4 — Statutory compliance
OK
NC
NA
HOLD
B. TESTING AND COMMISSIONING
B1All MEP systems tested, commissioned, and witnessed: HVAC, electrical, plumbing, fire, ELV
Acceptance: T&C reports signed by contractor, consultant, client; all parameters within spec
Part 4 — System commissioning
OK
NC
NA
HOLD
B2Fire & life safety systems: sprinkler flow, fire alarm, smoke detection, PA system tested
Acceptance: Sprinkler end-of-line flow test; alarm trigger verified; PA audible at 85 dB 1 m
Part 4 — Fire system validation
OK
NC
NA
HOLD
B3Integrated systems test (IST) / cause-and-effect matrix verified for fire alarm
Acceptance: C&E matrix executed; all linkages (alarm→shutdown→door release) verified
Part 4 — Integrated testing
OK
NC
NA
HOLD
B4Structural load testing (where applicable) completed and passed
Acceptance: Deflection within 1/250 of span; recovery ≥75% in 24 h; certificate filed
Cl. 17 — Load tests
OK
NC
NA
HOLD
C. DOCUMENTATION AND DELIVERABLES
C1As-built drawings delivered: architectural, structural, MEP (hardcopy + soft)
Acceptance: 2 hard copies + PDFs + CAD; revision AS-BUILT stamped; signed by consultant
Cl. 7.5.3 — Documented information
OK
NC
NA
HOLD
C2Operation & maintenance (O&M) manuals handed over with equipment data, warranties
Acceptance: One O&M set per discipline; equipment list; PM schedule; warranty cards; spare parts list
Cl. 8.5.5 — Post-delivery activities
OK
NC
NA
HOLD
C3QA/QC records handed over: test certs, MTCs, NCRs closed, inspection reports
Acceptance: All QA records indexed and filed; digital archive handed over; retention plan stated
Cl. 7.5.3 — Records transfer
OK
NC
NA
HOLD
C4Warranty and guarantee documents compiled: structural (10 yr), waterproofing (10 yr), equipment (mfg)
Acceptance: Warranty certificates in client name; start dates; contact numbers; warranty registers
Cl. 8.5.5 — Warranty provision
OK
NC
NA
HOLD
Showing 12 of 22 checkpoints ·
A. PHYSICAL COMPLETION VERIFICATION
A1All works per BOQ / scope complete; no pending items other than DLP-deferred
Cl. 8.6 — Release (ISO 9001)
BOQ 100% measured and certified; only DLP items on defer list; no abandoned work
OKNCNAHOLD
A2Zero-snag certification issued for all areas; snag register closed
Cl. 10.2 — Nonconformity closed (ISO 9001)
Snag register signed-off with zero open items; consultant/client endorsement
OKNCNAHOLD
A3Site housekeeping complete: all debris, temporary structures, materials removed
Part 4 — Site readiness (NBC 2016)
Project area swept clean; no contractor materials; temporary fencing removed
OKNCNAHOLD
A4All statutory approvals obtained: Occupation Certificate, Fire NOC, lift licence, NOCs
Part 4 — Statutory compliance (NBC 2016)
OC issued by local authority; Fire NOC by CFO; lift fitness by inspector; filed
OKNCNAHOLD
B. TESTING AND COMMISSIONING
B1All MEP systems tested, commissioned, and witnessed: HVAC, electrical, plumbing, fire, ELV
Part 4 — System commissioning (NBC 2016)
T&C reports signed by contractor, consultant, client; all parameters within spec
OKNCNAHOLD
B2Fire & life safety systems: sprinkler flow, fire alarm, smoke detection, PA system tested
Part 4 — Fire system validation (NBC 2016)
Sprinkler end-of-line flow test; alarm trigger verified; PA audible at 85 dB 1 m
OKNCNAHOLD
B3Integrated systems test (IST) / cause-and-effect matrix verified for fire alarm
Part 4 — Integrated testing (NBC 2016)
C&E matrix executed; all linkages (alarm→shutdown→door release) verified
OKNCNAHOLD
B4Structural load testing (where applicable) completed and passed
Cl. 17 — Load tests (IS 456)
Deflection within 1/250 of span; recovery ≥75% in 24 h; certificate filed
OKNCNAHOLD
C. DOCUMENTATION AND DELIVERABLES
C1As-built drawings delivered: architectural, structural, MEP (hardcopy + soft)
Cl. 7.5.3 — Documented information (ISO 9001)
2 hard copies + PDFs + CAD; revision AS-BUILT stamped; signed by consultant
OKNCNAHOLD
C2Operation & maintenance (O&M) manuals handed over with equipment data, warranties
Cl. 8.5.5 — Post-delivery activities (ISO 9001)
One O&M set per discipline; equipment list; PM schedule; warranty cards; spare parts list
OKNCNAHOLD
C3QA/QC records handed over: test certs, MTCs, NCRs closed, inspection reports
Cl. 7.5.3 — Records transfer (ISO 9001)
All QA records indexed and filed; digital archive handed over; retention plan stated
OKNCNAHOLD
C4Warranty and guarantee documents compiled: structural (10 yr), waterproofing (10 yr), equipment (mfg)
Cl. 8.5.5 — Warranty provision (ISO 9001)
Warranty certificates in client name; start dates; contact numbers; warranty registers
OKNCNAHOLD
Showing 12 of 22 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — NCR RAISED
Remarks
Name / Sign / Date
Inspected By
Name / Sign / Date
Reviewed By
Name / Sign / Date