Form · QC-GEN-FRM-007
Work Completion Certificate
28 checkpoints across 6 sections. Issued upon completion of a defined work scope — could be per activity (foundation completion), per phase (structural completion), or full project. Required before client handover and retention/final payment release.
28 Checkpoints
6 Sections
As needed — multiple certs may be issued per project at key milestones (foundation, structure, MEP rough-in, finishes, etc.)
QC In-charge, Consultant Project Manager

Checklist Preview

S.No.CheckpointIS RequirementStatus
WORKDETAILS. Work Details & Scope
WD_01Description of Work Completed
Acceptance: e.g., 'Foundation slab casting (500 m³ concrete, M30 grade, 300mm thickness)', 'Steel erection — 45 columns, 25 beams, all connections bolted', 'Plumbing rough-in installation — 2 km of pipes, 150+ fixtures', 'External walls — 5000 m² brick masonry, 230mm single leaf'
Clear description of the scope of work
WD_02Location / Building / Block / Floor
Acceptance: e.g., 'Block A, Basement to 3rd Floor', 'North Wing, Grid Lines 3-8 (A-D)', 'Tower 1, Foundation to Plinth', 'Entire project — All buildings'
Specific location identification
WD_03Drawing / Reference Numbers
Acceptance: List drawing numbers (e.g., 'AR-01, AR-02, AR-03' for architecture; 'ST-01, ST-02' for structural; 'MEP-01, MEP-02' for services). Latest revision stamped/signed.
Link to approved design drawings
WD_04Applicable IS Codes & Standards
Acceptance: e.g., 'IS 456:2000 (Concrete design), IS 875:1987 Parts 1-5 (Loading), IS 1200 (Methods of measurement), IS 3786:1983 (Safety), IS 1893:2002 (Seismic design)' — as applicable to work type
List all relevant IS codes governing this work
WD_05Specification Document Reference
Acceptance: e.g., 'Tender Specification v2.1', 'Project Specification document QP-SPEC-001', 'Approved Method Statement MS-001 Rev B', 'Approved BOQ and technical schedules'
Link to project specifications
INSPSUMMARY. Inspection Summary — All Verification Completed
INS_01All Planned Inspections Completed? (Y/N)
Acceptance: Yes: All inspections per ITP completed. No: List missing inspections and reasons. If No, work cannot be certified complete — reschedule inspections.
Verify all ITP inspections have been performed
INS_02All Inspections Passed Acceptance Criteria? (Y/N)
Acceptance: Yes: All inspections OK or conditional approvals granted. No: List failed inspections — work not complete until corrected and re-inspected.
Confirm zero non-conformances remain
INS_03All Required Tests Performed & Passed? (Y/N)
Acceptance: Yes: Compression tests, slump tests, NDT, pressure tests (as applicable) completed, all results within acceptance criteria. No: List pending tests — work not complete until tested.
Confirm all destructive and non-destructive tests done
INS_04All Hold Points Released / Approved? (Y/N)
Acceptance: Yes: All hold points released by authorized parties, documented. No: List pending hold points and approval status — work blocked until released.
Confirm no outstanding hold points
INS_05Total Number of NCRs Raised & Status
Acceptance: e.g., 'Total NCRs: 5. Closed: 4, Pending: 1 (NCR-003 corrective action in progress, target close 2026-04-15)'. Work completion conditional on closure of all NCRs.
Track non-conformances and resolutions
ASBUILT. As-Built Documentation
AB_01As-Built Drawings Prepared & Submitted? (Y/N)
Acceptance: Yes: As-built drawings prepared, marked with site changes/deviations, signed by site engineer and consultant, final version submitted. No: Schedule for preparation and target submission date.
Drawings reflecting actual construction executed
AB_02Test Reports Compiled & Organized? (Y/N)
Acceptance: Yes: All test reports (concrete compression, slump, NDT, pressure tests, etc.) compiled, indexed by date/activity, originals with consultant, copies with contractor. No: Specify missing reports.
All test data documented and traceable
AB_03Material Records Complete (MTC, Certificates)? (Y/N)
Acceptance: Yes: Material Test Certificates for cement, steel, bricks, paint, etc. collected, organized by material type and batch, originals with consultant. No: List missing material records.
Traceability of all materials used
AB_04Daily Inspection Logs Submitted? (Y/N)
Acceptance: Yes: All daily inspection logs for work period compiled and submitted. No: Schedule submission deadline.
Daily QC inspection records
AB_05Photographs / Video Documentation? (Y/N)
Acceptance: Yes: Progress photos at key stages, completion photos from multiple angles, video documentation (if required), all labeled with date/location. No: Schedule photo session.
Visual record of completed work
AB_06Operation & Maintenance Manuals (for equipment/services)? (Y/N)
Acceptance: Yes (if applicable): Manuals for HVAC, electrical systems, plumbing fixtures, elevators, etc. provided in local language with spare parts list. No or Not Applicable: Specify.
Handed over to client for system operation
Showing 16 of 28 checkpoints ·
WORKDETAILS. Work Details & Scope
WD_01Description of Work Completed
Clear description of the scope of work (Scope Definition Standard)
e.g., 'Foundation slab casting (500 m³ concrete, M30 grade, 300mm thickness)', 'Steel erection — 45 columns, 25 beams, all connections bolted', 'Plumbing rough-in installation — 2 km of pipes, 150+ fixtures', 'External walls — 5000 m² brick masonry, 230mm single leaf'
WD_02Location / Building / Block / Floor
Specific location identification (Location Reference Standard)
e.g., 'Block A, Basement to 3rd Floor', 'North Wing, Grid Lines 3-8 (A-D)', 'Tower 1, Foundation to Plinth', 'Entire project — All buildings'
WD_03Drawing / Reference Numbers
Link to approved design drawings (Design Reference Standard)
List drawing numbers (e.g., 'AR-01, AR-02, AR-03' for architecture; 'ST-01, ST-02' for structural; 'MEP-01, MEP-02' for services). Latest revision stamped/signed.
WD_04Applicable IS Codes & Standards
List all relevant IS codes governing this work (Regulatory Reference Standard)
e.g., 'IS 456:2000 (Concrete design), IS 875:1987 Parts 1-5 (Loading), IS 1200 (Methods of measurement), IS 3786:1983 (Safety), IS 1893:2002 (Seismic design)' — as applicable to work type
WD_05Specification Document Reference
Link to project specifications (Specification Reference Standard)
e.g., 'Tender Specification v2.1', 'Project Specification document QP-SPEC-001', 'Approved Method Statement MS-001 Rev B', 'Approved BOQ and technical schedules'
INSPSUMMARY. Inspection Summary — All Verification Completed
INS_01All Planned Inspections Completed? (Y/N)
Verify all ITP inspections have been performed (Inspection Completion Standard)
Yes: All inspections per ITP completed. No: List missing inspections and reasons. If No, work cannot be certified complete — reschedule inspections.
INS_02All Inspections Passed Acceptance Criteria? (Y/N)
Confirm zero non-conformances remain (Quality Acceptance Standard)
Yes: All inspections OK or conditional approvals granted. No: List failed inspections — work not complete until corrected and re-inspected.
INS_03All Required Tests Performed & Passed? (Y/N)
Confirm all destructive and non-destructive tests done (Testing Compliance Standard)
Yes: Compression tests, slump tests, NDT, pressure tests (as applicable) completed, all results within acceptance criteria. No: List pending tests — work not complete until tested.
INS_04All Hold Points Released / Approved? (Y/N)
Confirm no outstanding hold points (Hold Point Release Standard)
Yes: All hold points released by authorized parties, documented. No: List pending hold points and approval status — work blocked until released.
INS_05Total Number of NCRs Raised & Status
Track non-conformances and resolutions (NCR Management Standard)
e.g., 'Total NCRs: 5. Closed: 4, Pending: 1 (NCR-003 corrective action in progress, target close 2026-04-15)'. Work completion conditional on closure of all NCRs.
ASBUILT. As-Built Documentation
AB_01As-Built Drawings Prepared & Submitted? (Y/N)
Drawings reflecting actual construction executed (As-Built Standard)
Yes: As-built drawings prepared, marked with site changes/deviations, signed by site engineer and consultant, final version submitted. No: Schedule for preparation and target submission date.
AB_02Test Reports Compiled & Organized? (Y/N)
All test data documented and traceable (Test Documentation Standard)
Yes: All test reports (concrete compression, slump, NDT, pressure tests, etc.) compiled, indexed by date/activity, originals with consultant, copies with contractor. No: Specify missing reports.
AB_03Material Records Complete (MTC, Certificates)? (Y/N)
Traceability of all materials used (Material Traceability Standard)
Yes: Material Test Certificates for cement, steel, bricks, paint, etc. collected, organized by material type and batch, originals with consultant. No: List missing material records.
AB_04Daily Inspection Logs Submitted? (Y/N)
Daily QC inspection records (Record Keeping Standard)
Yes: All daily inspection logs for work period compiled and submitted. No: Schedule submission deadline.
AB_05Photographs / Video Documentation? (Y/N)
Visual record of completed work (Documentation Standard)
Yes: Progress photos at key stages, completion photos from multiple angles, video documentation (if required), all labeled with date/location. No: Schedule photo session.
AB_06Operation & Maintenance Manuals (for equipment/services)? (Y/N)
Handed over to client for system operation (Handover Standard)
Yes (if applicable): Manuals for HVAC, electrical systems, plumbing fixtures, elevators, etc. provided in local language with spare parts list. No or Not Applicable: Specify.
Showing 16 of 28 ·
Inspection Sign-Off
COMPLETED — NO SNAGS: Work fully completed and verified, ready for handover
COMPLETED — WITH MINOR SNAGGING: Work substantially complete, minor defects identified, remediation scheduled
NOT COMPLETE — REWORK REQUIRED: Major deficiencies identified, rework needed before certification
Final Completion Status
Name / Sign / Date
Certificate Issued By (QC Manager / Consultant Name)
Name / Sign / Date
Signature
Name / Sign / Date
Seal / Stamp
Name / Sign / Date
Distribution To (List recipients)
Name / Sign / Date
Remarks / Special Conditions
Name / Sign / Date
Next Phase / Handover Instructions
Name / Sign / Date