Schedule of Rates · OHPC

OHPC Schedule of Rates

Authority:OHPCRegion:OdishaDocuments:1
1 latest edition — direct from official sources, free
OHPC Tender Portal
Hydropower civil — Works SOR + DoWR mechanical + project-specific
compositeVerified↓ Download
Official portal: https://www.ohpcltd.com/
Odisha Hydro Power Corporation (OHPC) operates the state's hydropower assets — Hirakud, Balimela, Upper Indravati, Rengali, Upper Kolab. No standalone civil SOR — dam and powerhouse civil tendered with per-project BoQs derived from Works Dept SOR + DoWR mechanical schedules + project-specific specifications.

About Odisha Hydro Power Corporation Ltd

OHPC operates Odisha's substantial hydropower portfolio — Hirakud (270 MW + 24 MW + 32 MW units, the oldest), Balimela (510 MW), Upper Indravati (600 MW), Rengali (250 MW), Upper Kolab (320 MW). Civil scope: dam rehabilitation civil, powerhouse civil + mechanical (turbine pits, generator floor, valve houses), penstock civil supports, switchyard civil, plus plant-area civic infrastructure. Major recent capital activity around plant-life-extension, electromechanical equipment replacement, and dam-safety-monitoring system upgrades. OHPC tenders use Works Dept SOR + DoWR mechanical schedules + project-specific specifications. No consolidated OHPC civil SOR is publicly hosted.

Frequently Asked Questions

What's OHPC's installed capacity?

Approximately 2,000 MW total across 5 major hydropower stations. Hirakud is the oldest; Upper Indravati is the largest single station at 600 MW.

Does OHPC publish its own civil SOR?

No standalone SOR. Dam + powerhouse civil tendered per-project. Rates from Works Dept SOR + DoWR mechanical + project-specific specifications.

What's the Hirakud system?

Hirakud Dam (commissioned 1957) on the Mahanadi — one of India's earliest major dams. The reservoir feeds the 270 MW main powerhouse + smaller stations. Periodic rehabilitation works (gate replacement, dam-safety upgrades) tendered through OHPC.

Are OHPC powerhouse civil rates comparable to NHPC?

NHPC (central PSU) sets industry hydropower civil benchmarks. State-PSU rates operate within similar range with state-specific labour and lead variations.

Where do I find OHPC tenders?

ohpcltd.com publishes active tenders. Both ohpcltd.com and ohpc.co.in are official portals; documents may be on either.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.