Authority:JBVNL (Jharkhand state distribution discom)Region:JharkhandDocuments:1
1 latest edition — direct from official sources, free
JBVNL Cost Data Book 2022-23
Distribution civil + electrical SOR — prepared by FEEDBACK INFRA
electricalVerified↓ Download
Official portal: https://jbvnl.co.in/
Jharkhand Bijli Vitran Nigam Limited (JBVNL) is the state's distribution discom — successor to JSEB after the 2014 unbundling. JBVNL publishes a Cost Data Book / Schedule of Rates for distribution civil and electrical works. The 2022-23 edition (prepared by FEEDBACK INFRA) is the current publicly-hosted reference.

About Jharkhand Bijli Vitran Nigam Limited

JBVNL serves the entire state of Jharkhand for power distribution — covering Ranchi, Jamshedpur, Dhanbad, Bokaro, Hazaribagh, Deoghar, plus rural areas across all 24 districts. The Cost Data Book covers distribution-side civil and electrical items: line poles (PSC, RCC, steel), conductors (ACSR, AAAC), distribution transformers (16/25/63/100/200 kVA), substation civil for 33/11kV stations, control rooms, MV/LV switchgear civil supports, cable trenching, and household-connection materials. Distinct from JUSNL transmission (separate publisher). Engineers preparing JBVNL distribution-line tenders, RDSS / IPDS reform programme civil works, and rural electrification (Saubhagya etc.) reference this Cost Data Book. The 2022-23 edition was prepared by FEEDBACK INFRA as a consulting deliverable; mid-cycle adjustments via departmental memoranda.

Frequently Asked Questions

What's the difference between JBVNL and JUSNL?

JBVNL is distribution (consumer-side LT/HT). JUSNL is transmission (high-voltage backbone). Both are Jharkhand state PSUs; both have own civil-rates references but distinct scope and rate structures.

Who prepared the JBVNL Cost Data Book?

FEEDBACK INFRA (a consulting firm) was engaged to prepare the 2022-23 edition. This is unusual — most state DISCOMs prepare in-house. The consulting-prepared edition reflects FEEDBACK INFRA's industry benchmark methodology.

Does JBVNL Cost Data Book include civil works?

Yes — includes substation civil (control rooms, foundations, switchyard pavement), line-pole foundations, cable trenching, household-connection civil. Plus electrical items (poles, conductors, transformers, switchgear).

What about Saubhagya / RDSS / IPDS programmes?

These centrally-sponsored electrification schemes use JBVNL Cost Data Book for the Jharkhand share. JBVNL is the implementing agency for state-side distribution upgrades funded by these programmes.

Where can I find current JBVNL tenders?

jbvnl.co.in publishes active tenders + e-procurement integration. Major recent activity around RDSS programme civil + electrical packages.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.
Page last reviewed: 29 April 2026.