Schedule of Rates · APTRANSCO Civil

APTRANSCO Civil Schedule of Rates

Authority:APTRANSCORegion:Andhra PradeshDocuments:1
1 latest edition — direct from official sources, free
APTRANSCO Civil Wing Portal
Civil-wing tenders + circulars for substation works
electricalVerified↓ Download
Official portal: https://www.aptransco.co.in/
APTRANSCO is the state transmission utility for Andhra Pradesh, distinct from APCPDCL/APSPDCL distribution discoms (already covered). Its Civil Wing handles substation civil works, control rooms, transmission tower foundations, and switchyard civil. The civil-wing JSP page indexes tenders and circulars.

About Transmission Corporation of Andhra Pradesh — Civil Wing

APTRANSCO operates AP's high-voltage transmission backbone (220kV, 132kV substations and lines) as the dedicated transmission utility. The Civil Wing handles all substation civil construction — control rooms, switchyard pavement, tower foundations, transformer plinths, cable trenches. Civil rates derive from AP R&B SOR (already covered) plus APTRANSCO-specific items for transmission-grade specifications: blast-resistant control room construction, EHV-clearance pavement, fire-rated cable trenches. Major capital projects (new 765kV substations, transmission corridor strengthening) are tendered with project-specific BoQs.

Frequently Asked Questions

How is APTRANSCO different from APCPDCL/APSPDCL?

APTRANSCO is transmission (high-voltage backbone). APCPDCL/APSPDCL are distribution (consumer-side LT/HT). Civil works scope differs — transmission has substations, towers, switchyards; distribution has feeder substations, distribution-line supports.

Does APTRANSCO publish its own SOR?

No standalone SOR booklet. Civil rates derive from AP R&B SOR + APTRANSCO-specific items in tender BoQs. The civil-wing portal indexes circulars and tender corrigenda.

What's a 765kV substation civil project worth?

Typically ₹150-300 crore for the civil scope alone (excluding electrical equipment). APTRANSCO has tendered multiple such packages for AP's growing transmission capacity.

Are the rates similar to PowerGrid?

Comparable in magnitude. PowerGrid is the central transmission body operating across India; APTRANSCO is AP-specific. Both use similar substation civil specifications adapted for the operator's standard.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.