Waterproofing Inspection & Test Plan (ITP)
30 checkpoints across 9 sections. Planning phase before waterproofing work; defines quality gates for all phases
30 Checkpoints
9 Sections
Once per project; updated if scope/schedule changes significantly
QC Engineer, Project Manager

Checklist Preview

S.No.CheckpointIS RequirementStatus
1. SURFACE PREPARATION INSPECTION
1.1Surface prepared: Cleaned, dried (<5% moisture), cracks sealed; ready for waterproofing
Acceptance: Visual inspection; moisture meter reading; crack sealing cured; hold point until approved
Cl. 401 — Prerequisite approval
1.2Approval: Completion certificate issued; surface ready for primer/waterproofing application
Acceptance: Signed approval from QC engineer; witness point for first product application
Cl. 401 — Approval gate
2. MATERIAL & PRODUCT VERIFICATION
2.1Material received: Product test certificates verified; batch numbers recorded; storage conditions checked
Acceptance: Test certs <6 months old; all parameters within spec; hold point before use
Cl. 401 — Material approval
2.2Release for use: Material approved and released for application; first container witnessed
Acceptance: Formal release to contractor; witness point for first application batch; log maintained
Cl. 401 — Release authorization
3. PRIMER COAT APPLICATION
3.1Primer application: Coverage ≥0.5 kg/m²; uniform application; witness point at 1st 100m²
Acceptance: Weight recorded; visual inspection; witness approval to proceed with main coat
Cl. 401 — Primer control
3.2Primer cure: 24-48 hours drying confirmed; surface inspection before main coat application
Acceptance: Cure period logged; touch test confirms hardness; hold point for main coat approval
Cl. 401 — Cure verification
Showing 6 of 30 checkpoints ·
1. SURFACE PREPARATION INSPECTION
1.1Surface prepared: Cleaned, dried (<5% moisture), cracks sealed; ready for waterproofing
Cl. 401 — Prerequisite approval (IS 2645)
Visual inspection; moisture meter reading; crack sealing cured; hold point until approved
1.2Approval: Completion certificate issued; surface ready for primer/waterproofing application
Cl. 401 — Approval gate (IS 2645)
Signed approval from QC engineer; witness point for first product application
2. MATERIAL & PRODUCT VERIFICATION
2.1Material received: Product test certificates verified; batch numbers recorded; storage conditions checked
Cl. 401 — Material approval (IS 2645)
Test certs <6 months old; all parameters within spec; hold point before use
2.2Release for use: Material approved and released for application; first container witnessed
Cl. 401 — Release authorization (IS 2645)
Formal release to contractor; witness point for first application batch; log maintained
3. PRIMER COAT APPLICATION
3.1Primer application: Coverage ≥0.5 kg/m²; uniform application; witness point at 1st 100m²
Cl. 401 — Primer control (IS 2645)
Weight recorded; visual inspection; witness approval to proceed with main coat
3.2Primer cure: 24-48 hours drying confirmed; surface inspection before main coat application
Cl. 401 — Cure verification (IS 2645)
Cure period logged; touch test confirms hardness; hold point for main coat approval
Showing 6 of 30 ·