QA/QC  › Waterproofing  › Waterproofing Application Checklist
Checklist · QC-WPF-CHK-002
Waterproofing Application Checklist
20 checkpoints across 6 sections. During waterproofing application; continuous monitoring through cure period
20 Checkpoints
6 Sections
Daily during application; monitored throughout curing period
QC Engineer, Waterproofing Contractor

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. MATERIAL VERIFICATION
A1Waterproofing material brand, grade, batch verified against approved specification
Acceptance: Purchase order matches spec; product certificate available; batch within usable shelf-life
Cl. 401 — Material approval
A2Material test certificate available; viscosity, solid content, adhesion per IS standard
Acceptance: Lab test report <6 months old; all parameters within spec; approval from QC
Cl. 401 — Quality verification
A3Material stored correctly; temperature 5-40°C; containers sealed; no degradation observed
Acceptance: Storage records available; containers intact; expiry date not exceeded; mixed materials <24 hrs old
Cl. 401 — Storage control
B. APPLICATION PREPARATION
B1Weather conditions confirmed suitable: No rain forecast; ambient 5-40°C; humidity <90%
Acceptance: Weather forecast checked; temp & humidity logged; rain protection measures in place
Cl. 401 — Environmental conditions
B2Primer applied if required by product spec; curing time observed before main coat
Acceptance: Primer coverage ≥0.5 kg/m² (typical); curing 24-48 hrs per product; adhesion test passed
Cl. 401 — Primer application
B3Application equipment checked: Spray gun, roller, brush condition; nozzles clean; pressure verified
Acceptance: Spray gun: pressure 2-3 bar, fan width 0.3-0.5m; roller: 10mm nap; brush: synthetic, lint-free
Cl. 401 — Equipment readiness
B4Material mixed per specification; mixing ratio verified; mixing time 5-10 minutes
Acceptance: Two-part systems mixed per ratio; no lumps; uniform color; usable life <8 hrs after mixing
Cl. 401 — Material preparation
C. APPLICATION PROCEDURE
C1Application rate: Liquid 1-3 kg/m² per coat; sheet membrane laid with 150mm overlap minimum
Acceptance: Liquid coats: 1-1.5 kg/m² first, 0.5-1.5 kg/m² second; sheet: 150mm lap, 100mm on walls
Cl. 401 — Application thickness
C2First coat applied uniformly; coverage 100%; no thin spots or bare areas; application documented
Acceptance: Visual inspection shows continuous coat; weight recorded; photo documentation; 24-48 hr cure
Cl. 401 — Coverage verification
C3Second coat applied after first coat cure; cross-wise to first coat for better coverage
Acceptance: Cross-application reduces missed areas; total thickness ≥2.5mm; weight verified
Cl. 401 — Multi-coat application
C4Junctions reinforced: Edges, corners, penetrations treated with extra coat or reinforcing mesh
Acceptance: Cove/chamfer areas: 2-3 coats; reinforcing mesh embedded in first coat; full tape coverage
Cl. 401 — Detail treatment
C5Sheet membrane application: Laid with tension; all edges sealed; bubbles/wrinkles removed
Acceptance: Membrane stretched 2-3% tension; seams heat-welded or adhesive-sealed; no air pockets >10mm²
Cl. 401 — Sheet laying
Showing 12 of 20 checkpoints ·
A. MATERIAL VERIFICATION
A1Waterproofing material brand, grade, batch verified against approved specification
Cl. 401 — Material approval (IS 2645)
Purchase order matches spec; product certificate available; batch within usable shelf-life
A2Material test certificate available; viscosity, solid content, adhesion per IS standard
Cl. 401 — Quality verification (IS 2645)
Lab test report <6 months old; all parameters within spec; approval from QC
A3Material stored correctly; temperature 5-40°C; containers sealed; no degradation observed
Cl. 401 — Storage control (IS 2645)
Storage records available; containers intact; expiry date not exceeded; mixed materials <24 hrs old
B. APPLICATION PREPARATION
B1Weather conditions confirmed suitable: No rain forecast; ambient 5-40°C; humidity <90%
Cl. 401 — Environmental conditions (IS 2645)
Weather forecast checked; temp & humidity logged; rain protection measures in place
B2Primer applied if required by product spec; curing time observed before main coat
Cl. 401 — Primer application (IS 2645)
Primer coverage ≥0.5 kg/m² (typical); curing 24-48 hrs per product; adhesion test passed
B3Application equipment checked: Spray gun, roller, brush condition; nozzles clean; pressure verified
Cl. 401 — Equipment readiness (IS 2645)
Spray gun: pressure 2-3 bar, fan width 0.3-0.5m; roller: 10mm nap; brush: synthetic, lint-free
B4Material mixed per specification; mixing ratio verified; mixing time 5-10 minutes
Cl. 401 — Material preparation (IS 2645)
Two-part systems mixed per ratio; no lumps; uniform color; usable life <8 hrs after mixing
C. APPLICATION PROCEDURE
C1Application rate: Liquid 1-3 kg/m² per coat; sheet membrane laid with 150mm overlap minimum
Cl. 401 — Application thickness (IS 2645)
Liquid coats: 1-1.5 kg/m² first, 0.5-1.5 kg/m² second; sheet: 150mm lap, 100mm on walls
C2First coat applied uniformly; coverage 100%; no thin spots or bare areas; application documented
Cl. 401 — Coverage verification (IS 2645)
Visual inspection shows continuous coat; weight recorded; photo documentation; 24-48 hr cure
C3Second coat applied after first coat cure; cross-wise to first coat for better coverage
Cl. 401 — Multi-coat application (IS 2645)
Cross-application reduces missed areas; total thickness ≥2.5mm; weight verified
C4Junctions reinforced: Edges, corners, penetrations treated with extra coat or reinforcing mesh
Cl. 401 — Detail treatment (IS 2645)
Cove/chamfer areas: 2-3 coats; reinforcing mesh embedded in first coat; full tape coverage
C5Sheet membrane application: Laid with tension; all edges sealed; bubbles/wrinkles removed
Cl. 401 — Sheet laying (IS 2645)
Membrane stretched 2-3% tension; seams heat-welded or adhesive-sealed; no air pockets >10mm²
Showing 12 of 20 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — RE-APPLY
Remarks
Name / Sign / Date
Inspected By
Name / Sign / Date
Reviewed By
Name / Sign / Date