Register · QC-RPT-REG-005
Material Consumption Register
22 checkpoints across 7 sections. Continuously maintained; monthly reconciliation and audit
22 Checkpoints
7 Sections
Daily entries; monthly reconciliation
Store In-charge, Site Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. REGISTER COLUMN DEFINITIONS
A1Column 1: DATE — transaction date for receipt or issue (DD-MM-YYYY)
Acceptance: Chronological order maintained; no gaps; date format consistent
Cl. 7.5 — Records
OK
NC
NA
HOLD
A2Column 2: TRANSACTION TYPE — IN (receipt), OUT (issue), TRANSFER, RETURN
Acceptance: Transaction type clearly indicated with standard abbreviations
Cl. 8.5 — Material control
OK
NC
NA
HOLD
A3Column 3: MATERIAL CODE & DESCRIPTION — stock code, full description, unit
Acceptance: Material code consistent with BOQ / master item list; unit clearly stated
Cl. 3 — Identification
OK
NC
NA
HOLD
A4Column 4: BATCH / LOT / MTC REF — for traceable items like cement, steel, admixture
Acceptance: Batch / MTC number logged; traceable to approved supplier and test status
Cl. 8.5 — Traceability
OK
NC
NA
HOLD
A5Column 5: QUANTITY — with unit; separate IN and OUT columns
Acceptance: IN from GRN/weighbridge; OUT from issue voucher; precision appropriate to material
Cl. 8.5 — Quantity
OK
NC
NA
HOLD
A6Column 6: GRN / ISSUE VOUCHER NO. — document reference for transaction
Acceptance: Sequential voucher numbers; supporting documents filed
Cl. 7.5 — Documentation
OK
NC
NA
HOLD
A7Column 7: RECEIVED FROM / ISSUED TO — supplier name (IN) or activity/location (OUT)
Acceptance: IN: supplier name/code; OUT: activity, WBS, concrete batch for cement/agg
Cl. 8.5 — Usage
OK
NC
NA
HOLD
A8Column 8: RUNNING BALANCE — cumulative stock after each transaction
Acceptance: Balance updated after each entry; reconciles with physical stock
Cl. 7.5 — Inventory
OK
NC
NA
HOLD
A9Column 9: REMARKS — quality HOLD/APPROVED status, damage, returns, NCR
Acceptance: Quality status captured; damaged returns flagged; NCR link documented
Cl. 8.7 — Nonconforming
OK
NC
NA
HOLD
A10Column 10: VERIFIED BY — signature/initials of recorder and receiver
Acceptance: Each entry signed by storekeeper and counter-signed by receiver/issuer
Cl. 7.5 — Accountability
OK
NC
NA
HOLD
B. MATERIAL RECEIPT PROCEDURE
B1Each receipt supported by GRN linked to PO, delivery challan and MTC
Acceptance: GRN raised within 24 hr of receipt; PO, challan, MTC cross-referenced
Cl. 8.4 — Externally provided
OK
NC
NA
HOLD
B2Incoming materials inspected per receiving inspection; quality status APPROVED/HOLD marked
Acceptance: Only APPROVED material issued for work; HOLD segregated until cleared
Cl. 8.6 — Release
OK
NC
NA
HOLD
C. MATERIAL ISSUE AND CONSUMPTION
C1Each issue against signed issue voucher from authorized engineer/supervisor
Acceptance: Voucher has activity code, quantity, work location, signed by requestor
Cl. 8.5 — Control
OK
NC
NA
HOLD
C2FIFO principle applied: oldest batches issued first to prevent shelf-life issues
Acceptance: Batch-wise FIFO; expiring cement/admixture used first; shelf life respected
Cl. 3 — Storage
OK
NC
NA
HOLD
Showing 14 of 22 checkpoints ·
A. REGISTER COLUMN DEFINITIONS
A1Column 1: DATE — transaction date for receipt or issue (DD-MM-YYYY)
Cl. 7.5 — Records (ISO 9001)
Chronological order maintained; no gaps; date format consistent
OKNCNAHOLD
A2Column 2: TRANSACTION TYPE — IN (receipt), OUT (issue), TRANSFER, RETURN
Cl. 8.5 — Material control (ISO 9001)
Transaction type clearly indicated with standard abbreviations
OKNCNAHOLD
A3Column 3: MATERIAL CODE & DESCRIPTION — stock code, full description, unit
Cl. 3 — Identification (IS 4082)
Material code consistent with BOQ / master item list; unit clearly stated
OKNCNAHOLD
A4Column 4: BATCH / LOT / MTC REF — for traceable items like cement, steel, admixture
Cl. 8.5 — Traceability (ISO 9001)
Batch / MTC number logged; traceable to approved supplier and test status
OKNCNAHOLD
A5Column 5: QUANTITY — with unit; separate IN and OUT columns
Cl. 8.5 — Quantity (ISO 9001)
IN from GRN/weighbridge; OUT from issue voucher; precision appropriate to material
OKNCNAHOLD
A6Column 6: GRN / ISSUE VOUCHER NO. — document reference for transaction
Cl. 7.5 — Documentation (ISO 9001)
Sequential voucher numbers; supporting documents filed
OKNCNAHOLD
A7Column 7: RECEIVED FROM / ISSUED TO — supplier name (IN) or activity/location (OUT)
Cl. 8.5 — Usage (ISO 9001)
IN: supplier name/code; OUT: activity, WBS, concrete batch for cement/agg
OKNCNAHOLD
A8Column 8: RUNNING BALANCE — cumulative stock after each transaction
Cl. 7.5 — Inventory (ISO 9001)
Balance updated after each entry; reconciles with physical stock
OKNCNAHOLD
A9Column 9: REMARKS — quality HOLD/APPROVED status, damage, returns, NCR
Cl. 8.7 — Nonconforming (ISO 9001)
Quality status captured; damaged returns flagged; NCR link documented
OKNCNAHOLD
A10Column 10: VERIFIED BY — signature/initials of recorder and receiver
Cl. 7.5 — Accountability (ISO 9001)
Each entry signed by storekeeper and counter-signed by receiver/issuer
OKNCNAHOLD
B. MATERIAL RECEIPT PROCEDURE
B1Each receipt supported by GRN linked to PO, delivery challan and MTC
Cl. 8.4 — Externally provided (ISO 9001)
GRN raised within 24 hr of receipt; PO, challan, MTC cross-referenced
OKNCNAHOLD
B2Incoming materials inspected per receiving inspection; quality status APPROVED/HOLD marked
Cl. 8.6 — Release (ISO 9001)
Only APPROVED material issued for work; HOLD segregated until cleared
OKNCNAHOLD
C. MATERIAL ISSUE AND CONSUMPTION
C1Each issue against signed issue voucher from authorized engineer/supervisor
Cl. 8.5 — Control (ISO 9001)
Voucher has activity code, quantity, work location, signed by requestor
OKNCNAHOLD
C2FIFO principle applied: oldest batches issued first to prevent shelf-life issues
Cl. 3 — Storage (IS 4082)
Batch-wise FIFO; expiring cement/admixture used first; shelf life respected
OKNCNAHOLD
Showing 14 of 22 ·
Inspection Sign-Off
REVIEWED
ACTION REQUIRED
Remarks
Name / Sign / Date
Prepared By
Name / Sign / Date
Reviewed / Approved By
Name / Sign / Date