S.No.CheckpointIS RequirementStatus
A. MATERIAL VERIFICATION
A1Cement quality verified: approved batch used; certification present; not expired
Acceptance: Cement ≤3 months old; test report available; grade confirmed (OPC/PPC)
Cl. 3 — Cement selection
OK
NC
NA
HOLD
A2Sand quality conforming to IS 383: proper grading; no deleterious materials
Acceptance: Sand tested; Zone II or Zone III; sieve analysis pass; cleanliness verified
Cl. 4 — Fine aggregate
OK
NC
NA
HOLD
A3Lime (if used) confirmed: hydrated lime, pure and free from impurities
Acceptance: Hydrated lime used; storage proper; no lumping or degradation; fresh material
Cl. 5 — Lime selection
OK
NC
NA
HOLD
A4Water source: potable water used; no contamination with oils, acids, or salts
Acceptance: Clean potable water; pH 6-8; no visible contamination; sourced from approved supply
Cl. 6 — Water quality
OK
NC
NA
HOLD
B. MIX PROPORTIONS AND MEASUREMENT
B1Mortar mix proportions verified: cement:sand:lime ratio per design or IS standard
Acceptance: Proportions per specification (1:3 CS or 1:1:6 CLS typical); measured accurately; documented
Cl. 7 — Mix design
OK
NC
NA
HOLD
B2Materials measured volumetrically (buckets) or by weight; accuracy ≥±2%
Acceptance: Same-sized containers used; level measurement; documented quantities; consistency maintained
Cl. 7.1 — Measurement method
OK
NC
NA
HOLD
C. MIXING PROCEDURE
C1Materials mixed mechanically or manually until uniform color and consistency achieved
Acceptance: Dry mix 1-2 minutes; water added gradually; wet mix 3-5 minutes minimum
Cl. 8 — Mixing method
OK
NC
NA
HOLD
C2No segregation or color variation in mixed mortar; uniform appearance throughout
Acceptance: Consistent color; no unmixed pockets; components homogeneously distributed
Cl. 8.1 — Mix uniformity
OK
NC
NA
HOLD
C3Mixing duration adequate to ensure complete hydration of lime (if used)
Acceptance: Mixing time sufficient; lime fully incorporated; no lumps visible
Cl. 8.2 — Hydration
OK
NC
NA
HOLD
Showing 9 of 18 checkpoints ·
A. MATERIAL VERIFICATION
A1Cement quality verified: approved batch used; certification present; not expired
Cl. 3 — Cement selection (IS 2250)
Cement ≤3 months old; test report available; grade confirmed (OPC/PPC)
OKNCNAHOLD
A2Sand quality conforming to IS 383: proper grading; no deleterious materials
Cl. 4 — Fine aggregate (IS 2250)
Sand tested; Zone II or Zone III; sieve analysis pass; cleanliness verified
OKNCNAHOLD
A3Lime (if used) confirmed: hydrated lime, pure and free from impurities
Cl. 5 — Lime selection (IS 2250)
Hydrated lime used; storage proper; no lumping or degradation; fresh material
OKNCNAHOLD
A4Water source: potable water used; no contamination with oils, acids, or salts
Cl. 6 — Water quality (IS 2250)
Clean potable water; pH 6-8; no visible contamination; sourced from approved supply
OKNCNAHOLD
B. MIX PROPORTIONS AND MEASUREMENT
B1Mortar mix proportions verified: cement:sand:lime ratio per design or IS standard
Cl. 7 — Mix design (IS 2250)
Proportions per specification (1:3 CS or 1:1:6 CLS typical); measured accurately; documented
OKNCNAHOLD
B2Materials measured volumetrically (buckets) or by weight; accuracy ≥±2%
Cl. 7.1 — Measurement method (IS 2250)
Same-sized containers used; level measurement; documented quantities; consistency maintained
OKNCNAHOLD
C. MIXING PROCEDURE
C1Materials mixed mechanically or manually until uniform color and consistency achieved
Cl. 8 — Mixing method (IS 2250)
Dry mix 1-2 minutes; water added gradually; wet mix 3-5 minutes minimum
OKNCNAHOLD
C2No segregation or color variation in mixed mortar; uniform appearance throughout
Cl. 8.1 — Mix uniformity (IS 2250)
Consistent color; no unmixed pockets; components homogeneously distributed
OKNCNAHOLD
C3Mixing duration adequate to ensure complete hydration of lime (if used)
Cl. 8.2 — Hydration (IS 2250)
Mixing time sufficient; lime fully incorporated; no lumps visible
OKNCNAHOLD
Showing 9 of 18 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — REMIX REQUIRED
Remarks
Name / Sign / Date
Inspected By
Name / Sign / Date
Approved By