Checklist · QC-MAS-CHK-002
Masonry Construction Checklist
18 checkpoints across 8 sections. Daily during masonry construction work
18 Checkpoints
8 Sections
Daily; per wall section or lift
QC Engineer, Site Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. SUBSTRATE AND BASE PREPARATION
A1Base surface level, clean, and moistened but not waterlogged before laying
Acceptance: Surface firm and level; debris removed; pre-wet for good bond; not soggy
Cl. 6.1 — Base preparation
OK
NC
NA
HOLD
A2No soft material, dust, or weak concrete on base surface
Acceptance: Base solid and clean; dust brushed off; ready for mortar bond
Cl. 6.1 — Surface cleanliness
OK
NC
NA
HOLD
B. BRICK/BLOCK WETTING AND MOISTURE
B1Bricks pre-wetted 30 minutes before laying; surface damp but no free water
Acceptance: Bricks properly wetted; not dry (high suction); not waterlogged (no water drainage)
Cl. 6.2 — Moisture condition
OK
NC
NA
HOLD
B2High suction bricks identified and properly wetted to prevent excess suction
Acceptance: Water absorption test done if suspected high suction; 30-min soak applied as needed
Cl. 6.2 — Suction control
OK
NC
NA
HOLD
C. MORTAR QUALITY AND CONSISTENCY
C1Fresh mortar used (not older than 4-5 hours); no slaked lime residue visible
Acceptance: Mortar workable and plastic; no stiffening from air exposure; fully mixed consistency
Cl. 6.3 — Mortar freshness
OK
NC
NA
HOLD
C2Mortar consistency uniform and plastic; adequate for uniform bedding
Acceptance: Mortar spreads easily; no segregation; proper flow and workability; retempered as needed
Cl. 6.3 — Consistency
OK
NC
NA
HOLD
Showing 6 of 18 checkpoints ·
A. SUBSTRATE AND BASE PREPARATION
A1Base surface level, clean, and moistened but not waterlogged before laying
Cl. 6.1 — Base preparation (IS 1905)
Surface firm and level; debris removed; pre-wet for good bond; not soggy
OKNCNAHOLD
A2No soft material, dust, or weak concrete on base surface
Cl. 6.1 — Surface cleanliness (IS 1905)
Base solid and clean; dust brushed off; ready for mortar bond
OKNCNAHOLD
B. BRICK/BLOCK WETTING AND MOISTURE
B1Bricks pre-wetted 30 minutes before laying; surface damp but no free water
Cl. 6.2 — Moisture condition (IS 1905)
Bricks properly wetted; not dry (high suction); not waterlogged (no water drainage)
OKNCNAHOLD
B2High suction bricks identified and properly wetted to prevent excess suction
Cl. 6.2 — Suction control (IS 1905)
Water absorption test done if suspected high suction; 30-min soak applied as needed
OKNCNAHOLD
C. MORTAR QUALITY AND CONSISTENCY
C1Fresh mortar used (not older than 4-5 hours); no slaked lime residue visible
Cl. 6.3 — Mortar freshness (IS 3590)
Mortar workable and plastic; no stiffening from air exposure; fully mixed consistency
OKNCNAHOLD
C2Mortar consistency uniform and plastic; adequate for uniform bedding
Cl. 6.3 — Consistency (IS 3590)
Mortar spreads easily; no segregation; proper flow and workability; retempered as needed
OKNCNAHOLD
Showing 6 of 18 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — RECTIFICATION REQUIRED
Remarks
Name / Sign / Date
Inspected By
Name / Sign / Date
Approved By
Name / Sign / Date