Material Inspection Report (MIR)

form
PMC-PRC-FRM-006·v1.0-beta·⚠ Beta — review before use

This form is used to officially record the inspection of materials when they arrive at the site. It ensures that the delivered material matches the Purchase Order, approved make, and technical specifications before it is accepted from the supplier.

ReferencesIS 1786 (TMT Steel)IS 456 (Plain and Reinforced Concrete)CPWD Specifications (Vol I & II)FIDIC Conditions of Contract, Sub-clause 7.3 (Inspection)FIDIC Conditions of Contract, Sub-clause 7.5 (Rejection)
Download
📍 When to use this template
  • Whenever any construction material is delivered to the site stores by a supplier or vendor.
  • Before the material is formally accepted and recorded in the Goods Receipt Note (GRN) and Stores Ledger.
  • Filled by the Site Engineer/Stores In-charge, and jointly signed by the Contractor's QC Engineer and the PMC/Client's representative.
Sections & fields
Preview of the template structure. Download Excel to fill on site.
1Header / Project Information7 fields
Project Name
_____________
Contract / Package No.
_____________
MIR No.
_____________
Date of Inspection
_____________
Location of Inspection (e.g., Site Stores, Laydown Area)
_____________
Prepared By (Contractor's QC)
_____________
Reviewed By (PMC/Client Engineer)
_____________
2Material & Supplier Details7 fields
Material Description (e.g., TMT Steel Fe500D)
_____________
Supplier / Vendor Name
_____________
Purchase Order (PO) No. & Date
_____________
Challan / Invoice No. & Date
_____________
GRN No. (if applicable)
_____________
Approved Make / Brand (as per contract)
_____________
Material Approval Request (MAR) Ref. No.
_____________
3Quantity Details7 fields
Unit of Measurement (UOM)
_____________
Quantity as per Challan / Invoice
_____________
Quantity Received at Site
_____________
Quantity Inspected
_____________
Quantity Accepted
_____________
Quantity Rejected
_____________
Reason for Rejection (if any)
_____________
4Inspection Checklist (Visual & Documentary)8 fields
Visual Condition (Damage, Rust, Warpage, etc.)
_____________
Packing & Marking Verification
_____________
Dimensions / Size Verification (as per spec)
_____________
Batch No. / Heat No. / Lot No. Verification
_____________
Manufacturing Date / Expiry Date Check
_____________
Compliance with Approved Sample
_____________
Manufacturer's Test Certificate (MTC) Verified
_____________
Third-Party Test Report Ref. (if required)
_____________
5Inspection Outcome & Sign-off6 fields
Inspection Status (Accepted / Rejected / Accepted with Remarks / Hold for further testing)
_____________
Remarks / Observations
_____________
Action for Rejected Material (e.g., Return to supplier, Segregate)
_____________
Contractor QC Engineer (Name & Signature)
_____________
PMC / Client Engineer (Name & Signature)
_____________
Stores In-charge (Name & Signature)
_____________
💡 Sample filled excerpt
Material: TMT Steel, 12mm Dia, Fe500D. Supplier: Jindal Steel. PO No: PO/SITE/23-24/112. Challan Qty: 25.4 MT. Inspected Qty: 25.4 MT. Accepted Qty: 25.2 MT. Rejected Qty: 0.2 MT. Reason for Rejection: Excessive rust and bending on 4 bundles. Status: Accepted with Remarks.
⚖ Compliance notes
  • Fulfills quality control requirements as per the project's Quality Assurance Plan (QAP) and contract specifications.
  • Essential document for audit trail, linking Purchase Order to material consumption and RA Bills.
  • Supports compliance with FIDIC Sub-clause 7.3 (Inspection) and 7.5 (Rejection) regarding material quality.
  • Mandatory for ISO 9001 quality management systems to ensure traceability of incoming materials.