📍 When to use this template
- Filled daily for each major piece of equipment deployed on site.
- Used to calculate equipment hire charges for contractor bills or internal cost allocation.
- Typically filled by the site supervisor or equipment operator and verified by the engineer.
Sections & fields
Preview of the template structure. Download Excel to fill on site.
1Header / Project Information6 fields
Project Name
_____________
Contract / Package No.
_____________
Log Sheet No.
_____________
Prepared By (Supervisor/Operator)
_____________
Verified By (Engineer)
_____________
2Equipment Identification5 fields
Equipment Type (e.g., Excavator, Dumper, Crane)
_____________
Equipment Make & Model
_____________
Equipment ID / Registration No.
_____________
Operator Name
_____________
Operator License Details
_____________
3Daily Log - Working Hours6 fields
Start Time (HH:MM)
_____________
End Time (HH:MM)
_____________
Total Working Hours
_____________
Start HMR (Hour Meter Reading)
_____________
Total HMR Hours
_____________
4Daily Log - Idle / Breakdown Hours7 fields
Idle Time From (HH:MM)
_____________
Idle Time To (HH:MM)
_____________
Reason for Idle (e.g., No Work, Operator Absent, Fuel Shortage)
_____________
Breakdown Time From (HH:MM)
_____________
Breakdown Time To (HH:MM)
_____________
Reason for Breakdown
_____________
Action Taken
_____________
5Work Details4 fields
Location of Work (Grid/Chainage)
_____________
Activity Performed (e.g., Excavation, Concreting, Lifting)
_____________
Quantity of Work Done (if applicable)
_____________
Remarks / Observations
_____________
6Fuel & Consumables4 fields
Fuel Issued (Litres)
_____________
Engine Oil / Hydraulic Oil Topped Up (Litres)
_____________
Greasing Done (Yes/No)
_____________
Any other consumables used
_____________
💡 Sample filled excerpt
Equipment: JCB 3DX, ID: MH-04-AB-1234. Start HMR: 5432.1, End HMR: 5439.6. Total Working: 7.5 hrs. Activity: Trench excavation for footing F3 at Grid A/5. Idle: 1.5 hrs (waiting for layout marking).
⚖ Compliance notes
- Supports billing verification as per contract clauses related to equipment hire charges in RA Bills.
- Acts as a supporting document for claims related to idle machinery under FIDIC Sub-Clause 2.1 (Right of Access to the Site) or similar contract provisions.
- Helps in monitoring equipment health and maintenance records, indirectly supporting compliance with BOCW Rules regarding safe machinery.
- Provides data for reconciliation of contractor's Running Account (RA) Bills and fuel consumption records.