S.No.Field / CheckpointReferenceStatus
A. PRE-COMMISSIONING
A1Chiller make + model + capacity TR + serial
Acceptance: Match
Per PO
OK
NC
NA
A2Installation — base, vibration isolators, piping (CHW + condenser water)
Acceptance: Verified
Per OEM
OK
NC
NA
A3Electrical termination — HT/LT panel, IR, cabling
Acceptance: Per code
Per IS 732
OK
NC
NA
A4Refrigerant charge confirmed
Acceptance: Pressure + temperature normal
Per OEM
OK
NC
NA
B. STARTUP
B1Pre-run checks — oil level, water flow, control voltage
Acceptance: All green
Per OEM startup sequence
OK
NC
NA
B2Manual / interlocked startup
Acceptance: Per OEM
Sequence verified
OK
NC
NA
B3Operational parameters — Evap entering/leaving temp, condenser entering/leaving temp, suction/discharge pressure
Acceptance: Logged
Within OEM ranges
OK
NC
NA
B4Capacity stepping (multi-step compressors)
Acceptance: Per OEM
Stepping smooth
OK
NC
NA
C. PERFORMANCE
C1Cooling capacity at design conditions
Acceptance: Per test
≥ 95% of rated
OK
NC
NA
C2Power consumption (kW) per TR
Acceptance: Per test
kW/TR within OEM spec
OK
NC
NA
C3COP / IPLV calculated
Acceptance: Per OEM
Per ASHRAE 90.1
OK
NC
NA
Showing 11 of 13 fields ·
A. PRE-COMMISSIONING
A1Chiller make + model + capacity TR + serial
Per PO
Match
OKNCNA
A2Installation — base, vibration isolators, piping (CHW + condenser water)
Per OEM
Verified
OKNCNA
A3Electrical termination — HT/LT panel, IR, cabling
Per IS 732
Per code
OKNCNA
A4Refrigerant charge confirmed
Per OEM
Pressure + temperature normal
OKNCNA
B. STARTUP
B1Pre-run checks — oil level, water flow, control voltage
Per OEM startup sequence
All green
OKNCNA
B2Manual / interlocked startup
Sequence verified
Per OEM
OKNCNA
B3Operational parameters — Evap entering/leaving temp, condenser entering/leaving temp, suction/discharge pressure
Within OEM ranges
Logged
OKNCNA
B4Capacity stepping (multi-step compressors)
Stepping smooth
Per OEM
OKNCNA
C. PERFORMANCE
C1Cooling capacity at design conditions
≥ 95% of rated
Per test
OKNCNA
C2Power consumption (kW) per TR
kW/TR within OEM spec
Per test
OKNCNA
C3COP / IPLV calculated
Per ASHRAE 90.1
Per OEM
OKNCNA
Showing 11 of 13 ·
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date