AHU (Air Handling Unit) Commissioning Checklist
13 fields across 4 sections. AHU commissioning — done before takeover from MEP contractor.
13 Fields
4 Sections
Per AHU
MEP Commissioning Engineer, HVAC Specialist

Format Preview

S.No.Field / CheckpointReferenceStatus
A. PRE-COMMISSIONING
A1AHU manufacturer + model + capacity + serial no.
Acceptance: Match purchase order
Per OEM spec
OK
NC
NA
A2Installation complete — coil, fan, filters, dampers, drains
Acceptance: Visual check
Per drawing
OK
NC
NA
A3Electrical connections + safety interlocks tested
Acceptance: IR ≥ 1 MΩ
Megger test
OK
NC
NA
A4Refrigerant charge (if DX) + chilled water flow (if CHW)
Acceptance: Verified
Per OEM
OK
NC
NA
B. FAN + AIRFLOW
B1Fan rotation direction check
Acceptance: Correct rotation
Per OEM arrow
OK
NC
NA
B2Belt tension + alignment
Acceptance: Properly set
Per OEM
OK
NC
NA
B3Airflow measurement (anemometer / pitot tube) at supply diffusers
Acceptance: Per design
Within ± 10% of design CFM
OK
NC
NA
B4Static pressure at supply + return
Acceptance: Within tolerance
Per duct design
OK
NC
NA
C. COIL + COIL PERFORMANCE
C1Cooling capacity test — DB/WB entering vs leaving air
Acceptance: Computed
Within ± 10% of design TR
OK
NC
NA
C2Heating capacity (if hot water / electric)
Acceptance: Verified
Per design
OK
NC
NA
C3Condensate drain — flow + slope + trap
Acceptance: Drains correctly
1:100 minimum slope
OK
NC
NA
Showing 11 of 13 fields ·
A. PRE-COMMISSIONING
A1AHU manufacturer + model + capacity + serial no.
Per OEM spec
Match purchase order
OKNCNA
A2Installation complete — coil, fan, filters, dampers, drains
Per drawing
Visual check
OKNCNA
A3Electrical connections + safety interlocks tested
Megger test
IR ≥ 1 MΩ
OKNCNA
A4Refrigerant charge (if DX) + chilled water flow (if CHW)
Per OEM
Verified
OKNCNA
B. FAN + AIRFLOW
B1Fan rotation direction check
Per OEM arrow
Correct rotation
OKNCNA
B2Belt tension + alignment
Per OEM
Properly set
OKNCNA
B3Airflow measurement (anemometer / pitot tube) at supply diffusers
Within ± 10% of design CFM
Per design
OKNCNA
B4Static pressure at supply + return
Per duct design
Within tolerance
OKNCNA
C. COIL + COIL PERFORMANCE
C1Cooling capacity test — DB/WB entering vs leaving air
Within ± 10% of design TR
Computed
OKNCNA
C2Heating capacity (if hot water / electric)
Per design
Verified
OKNCNA
C3Condensate drain — flow + slope + trap
1:100 minimum slope
Drains correctly
OKNCNA
Showing 11 of 13 ·
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date