Road Paving Progress Register
33 checkpoints across 3 sections. Daily paving operations; continuous register throughout project duration
33 Checkpoints
3 Sections
Daily entries; weekly & monthly summaries
QC Engineer, Site Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. DAILY PAVING RECORD COLUMNS
C1Date
Acceptance: DD/MM/YYYY format; daily entry
Basic record identification
C2Chainage From (km/m)
Acceptance: Start location of paving work on that day
Location tracking
C3Chainage To (km/m)
Acceptance: End location of paving work on that day
Location tracking
C4Length Paved (m)
Acceptance: Calculated as To - From; in meters
Quantity tracking
C5Width (m)
Acceptance: Paved width; typically road width
Area calculation
C6Area Paved (m²)
Acceptance: Length × Width; cumulative total in register
Area tracking
C7Layer Type (DBM/BC)
Acceptance: Dense Bituminous Macadam (DBM) or Bituminous Concrete (BC)
Material identification
C8Nominal Size (32mm/19mm)
Acceptance: Aggregate nominal size of mix used
Mix specification
C9Design Thickness (mm)
Acceptance: Layer thickness per pavement design
Quality specification
C10Bitumen Grade / Source
Acceptance: 60/70, 80/100, etc. and supplier batch number
Material tracking
C11Mix Plant Temperature (°C)
Acceptance: Discharge temperature from plant; recorded per truck or hourly
Temperature control
C12Discharge Temperature (°C)
Acceptance: Temperature when material arrives at paver; should be 155-165°C
Temperature at site
C13Bitumen Quantity (kg)
Acceptance: Total bitumen used for paved area; calculated from rate
Material consumption
C14Mix Quantity (tonnes)
Acceptance: Total mix weighed from plant; from batch tickets
Material consumption
C15No. of Trucks/Batches
Acceptance: Number of loads delivered and paved on that day
Material tracking
C16Rolling Pressure / Equipment
Acceptance: Type of roller (static/vibratory), weight, no. of passes
Compaction tracking
C17Ambient Temperature (°C)
Acceptance: Air temperature at time of paving; morning, afternoon, evening
Environmental record
C18Weather Condition
Acceptance: Clear, Cloudy, Drizzle, Rain; any weather interruptions noted
Environmental record
C19Test Conducted (Y/N)
Acceptance: Y if Marshall/core tests done that day; N if not
QA activity
C20Test Result / Status
Acceptance: PASS, FAIL, or Pending; notes on any defects or concerns
QA status
C21Density Achieved (%)
Acceptance: Field density as % of Marshall density; target ≥98%
Quality metric
C22Remarks / Issues
Acceptance: Any defects, delays, material issues, contractor actions, NCRs
Documentation
C23QC Engineer Sign & Date
Acceptance: Daily sign-off by QC engineer responsible for that day
Authorization
B. CUMULATIVE SUMMARY ROWS
S1Total Length Paved (m) — Weekly and Monthly summaries
Acceptance: Cumulative sum of daily lengths; compared to schedule
Progress tracking
S2Total Area Paved (m²) — Weekly and Monthly summaries
Acceptance: Cumulative sum of daily areas; against planned schedule
Progress tracking
S3Total Bitumen Used (tonnes) — Weekly and Monthly summaries
Acceptance: Cumulative bitumen; verified against consumption rate
Material consumption tracking
S4Total Mix Used (tonnes) — Weekly and Monthly summaries
Acceptance: Cumulative mix from plant; cross-checked with delivery notes
Material consumption tracking
S5Average Density Achieved (%) — Period summary
Acceptance: Average of all density test results for the period
Quality summary
S6Tests Conducted / Passed — Period summary
Acceptance: Total tests in period vs. tests passed; pass % calculated
QA summary
C. NOTES & INSTRUCTIONS
N1Update register daily; entries signed by QC engineer
Acceptance: Same-day or next-day entry; no retroactive undated entries
Data integrity
N2Cross-reference to test reports and NCRs issued during period
Acceptance: NCR numbers and test report dates linked to register entries
Traceability
N3Monthly review and approval by project engineer
Acceptance: Monthly summaries approved and signed; register stamped and filed
Authorization
N4Register retained for contract duration; part of permanent project records
Acceptance: Stored in project file; protected from damage; submitted with final report
Documentation retention
A. DAILY PAVING RECORD COLUMNS
C1Date
Basic record identification (SP 20)
DD/MM/YYYY format; daily entry
C2Chainage From (km/m)
Location tracking (SP 20)
Start location of paving work on that day
C3Chainage To (km/m)
Location tracking (SP 20)
End location of paving work on that day
C4Length Paved (m)
Quantity tracking (SP 20)
Calculated as To - From; in meters
C5Width (m)
Area calculation (SP 20)
Paved width; typically road width
C6Area Paved (m²)
Area tracking (SP 20)
Length × Width; cumulative total in register
C7Layer Type (DBM/BC)
Material identification (SP 20)
Dense Bituminous Macadam (DBM) or Bituminous Concrete (BC)
C8Nominal Size (32mm/19mm)
Mix specification (SP 20)
Aggregate nominal size of mix used
C9Design Thickness (mm)
Quality specification (SP 20)
Layer thickness per pavement design
C10Bitumen Grade / Source
Material tracking (IS 73)
60/70, 80/100, etc. and supplier batch number
C11Mix Plant Temperature (°C)
Temperature control (SP 20)
Discharge temperature from plant; recorded per truck or hourly
C12Discharge Temperature (°C)
Temperature at site (SP 20)
Temperature when material arrives at paver; should be 155-165°C
C13Bitumen Quantity (kg)
Material consumption (SP 20)
Total bitumen used for paved area; calculated from rate
C14Mix Quantity (tonnes)
Material consumption (SP 20)
Total mix weighed from plant; from batch tickets
C15No. of Trucks/Batches
Material tracking (SP 20)
Number of loads delivered and paved on that day
C16Rolling Pressure / Equipment
Compaction tracking (SP 20)
Type of roller (static/vibratory), weight, no. of passes
C17Ambient Temperature (°C)
Environmental record (SP 20)
Air temperature at time of paving; morning, afternoon, evening
C18Weather Condition
Environmental record (SP 20)
Clear, Cloudy, Drizzle, Rain; any weather interruptions noted
C19Test Conducted (Y/N)
QA activity (SP 20)
Y if Marshall/core tests done that day; N if not
C20Test Result / Status
QA status (SP 20)
PASS, FAIL, or Pending; notes on any defects or concerns
C21Density Achieved (%)
Quality metric (SP 20)
Field density as % of Marshall density; target ≥98%
C22Remarks / Issues
Documentation (SP 20)
Any defects, delays, material issues, contractor actions, NCRs
C23QC Engineer Sign & Date
Authorization (SP 20)
Daily sign-off by QC engineer responsible for that day
B. CUMULATIVE SUMMARY ROWS
S1Total Length Paved (m) — Weekly and Monthly summaries
Progress tracking (SP 20)
Cumulative sum of daily lengths; compared to schedule
S2Total Area Paved (m²) — Weekly and Monthly summaries
Progress tracking (SP 20)
Cumulative sum of daily areas; against planned schedule
S3Total Bitumen Used (tonnes) — Weekly and Monthly summaries
Material consumption tracking (SP 20)
Cumulative bitumen; verified against consumption rate
S4Total Mix Used (tonnes) — Weekly and Monthly summaries
Material consumption tracking (SP 20)
Cumulative mix from plant; cross-checked with delivery notes
S5Average Density Achieved (%) — Period summary
Quality summary (SP 20)
Average of all density test results for the period
S6Tests Conducted / Passed — Period summary
QA summary (SP 20)
Total tests in period vs. tests passed; pass % calculated
C. NOTES & INSTRUCTIONS
N1Update register daily; entries signed by QC engineer
Data integrity (SP 20)
Same-day or next-day entry; no retroactive undated entries
N2Cross-reference to test reports and NCRs issued during period
Traceability (SP 20)
NCR numbers and test report dates linked to register entries
N3Monthly review and approval by project engineer
Authorization (SP 20)
Monthly summaries approved and signed; register stamped and filed
N4Register retained for contract duration; part of permanent project records
Documentation retention (SP 20)
Stored in project file; protected from damage; submitted with final report
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED
Weekly Review By
Name / Sign / Date
Monthly Approval By
Name / Sign / Date