BOQ Builder·Auto-BOQ from dimensions, DSR ratesNEWBidEasy·Government tenders, searchableLIVE
Schedule of Rates · MJP — Maharashtra Jeevan Pradhikaran

MJP — Maharashtra Jeevan Pradhikaran Schedule of Rates

Authority:Maharashtra Jeevan Pradhikaran, Water Supply & Sanitation Dept, Govt. of MaharashtraRegion:MaharashtraDocuments:6
2 latest editions · 4 earlier editions archived below — direct from official sources, free
MJP Mechanical & Electronic CSR 2023-24
electrical3.0 MBVerified↓ Download
MJP State Schedule of Rates 2023-24
De-facto SOR for JJM-Maharashtra
water supply8.4 MBVerified↓ Download
📦 Earlier editions (4) — historical reference, not current rates
Official portal: https://mjp.maharashtra.gov.in/
Maharashtra Jeevan Pradhikaran (MJP) issues its own State Schedule of Rates (SSR) for water-supply and sanitation works across Maharashtra — distinct from the Maharashtra PWD DSR. The MJP SSR governs rate analysis for water-treatment plants, pumping stations, rising/distribution mains, ESRs/GSRs and sewerage, and is the reference for MJP and ULB water-supply tenders.

About Maharashtra Jeevan Pradhikaran (MJP) — State Schedule of Rates

Maharashtra Jeevan Pradhikaran (MJP) — the state's water-supply and sanitation authority — publishes a dedicated State Schedule of Rates (SSR) each year, separate from the Maharashtra PWD/CSR. It is split into a Civil SSR (pipelines, treatment units, structures) and a Mechanical & Electrical SSR (pumps, motors, electrical works for water systems). Engineers preparing or scrutinising MJP / Maharashtra ULB water-supply BoQs work from this SSR; the latest civil edition is the 2023-24 SSR. Older editions are retained below for ongoing/legacy contracts whose rates were locked at award.

Frequently Asked Questions

What is the MJP SSR?

The Maharashtra Jeevan Pradhikaran State Schedule of Rates — the official rate schedule for water-supply and sanitation works under MJP, separate from the Maharashtra PWD/CSR. It is issued in Civil and Mechanical & Electrical parts.

What is the latest MJP SSR edition?

The MJP State Schedule of Rates 2023-24 (Civil) with the matching Mechanical & Electronic CSR 2023-24 is the current edition shown below. Earlier 2022-23 and 2021-22 editions are retained for legacy/ongoing contracts.

How is MJP SSR different from Maharashtra PWD DSR/CSR?

MJP SSR is specific to water-supply and sanitation works (treatment plants, pumping, mains, sewerage) under Maharashtra Jeevan Pradhikaran. The Maharashtra PWD DSR/CSR covers general civil/building/road works. Use the MJP SSR for water-supply tenders under MJP and ULBs.

Is the MJP SSR free to download here?

Yes — the editions below are direct PDF downloads mirrored for reliability. For the authoritative copy and any mid-year corrigenda, also check the official MJP portal.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.
Page last reviewed: 17 May 2026.