QA/QC  › Plumbing & Water Supply  › Plumbing Installation Register
Register · QC-PLB-REG-001
Plumbing Installation Register
21 checkpoints across 5 sections. From commissioning onwards; lifetime maintenance record
21 Checkpoints
5 Sections
Continuous
Building Manager, Maintenance Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
LINES. WATER SUPPLY LINES INVENTORY
Col_1Line ID (e.g., CW-1, HW-1, RO-1)
Acceptance: Alphanumeric ID, distinct naming for cold/hot/RO supplies
Unique line identifier
Col_2Pipe Material Type
Acceptance: GI, UPVC, PVC, PE, Copper documented
Material specification
Col_3Pipe Diameter (mm)
Acceptance: 25mm, 32mm, 50mm, etc.
Size specification
Col_4Design Pressure (bar)
Acceptance: Typical 10 bar for building supply
Pressure rating
Col_5Total Line Length (m)
Acceptance: Measured length from source to furthest outlet
Length documentation
Col_6Number of Joints
Acceptance: Total joints in line for testing tracking
Joint count
Col_7Installation Date
Acceptance: Line installation completion date
Completion date
FIXTURES. FIXTURE INSTALLATION RECORDS
F_1Fixture Type (WC/Washbasin/Bathtub/Sink)
Acceptance: Type identified: WC, WB, Bath, Sink, etc.
Fixture category
F_2Location (Unit/Floor/Room)
Acceptance: Building address/unit/room number
Fixture location
F_3Installation Date
Acceptance: Date fixture installed
Completion date
F_4QC Approval Date
Acceptance: QC inspector name and approval date
QC sign-off
TESTS. TESTING RECORDS
T_1Hydrostatic Pressure Test - Date, Result (PASS/FAIL)
Acceptance: Test date, pressure held, leakage result
Pressure test completion
T_2Joint Leakage Inspection - Date, Number Passed/Failed
Acceptance: Date, count of joints inspected, pass/fail count
Visual leakage check
T_3Water Quality Test - Date, Result (PASS/FAIL)
Acceptance: Test date, physical/chemical/microbiological results
Quality verification
T_4Flow & Pressure Test - Date, Pressure at Furthest Outlet (bar)
Acceptance: Minimum 0.5 bar at furthest outlet at design flow
System performance
Showing 15 of 21 checkpoints ·
LINES. WATER SUPPLY LINES INVENTORY
Col_1Line ID (e.g., CW-1, HW-1, RO-1)
Unique line identifier (IS 2065)
Alphanumeric ID, distinct naming for cold/hot/RO supplies
Col_2Pipe Material Type
Material specification (IS 2065)
GI, UPVC, PVC, PE, Copper documented
Col_3Pipe Diameter (mm)
Size specification (IS 2065)
25mm, 32mm, 50mm, etc.
Col_4Design Pressure (bar)
Pressure rating (IS 2065)
Typical 10 bar for building supply
Col_5Total Line Length (m)
Length documentation (IS 2065)
Measured length from source to furthest outlet
Col_6Number of Joints
Joint count (IS 2065)
Total joints in line for testing tracking
Col_7Installation Date
Completion date (IS 2065)
Line installation completion date
FIXTURES. FIXTURE INSTALLATION RECORDS
F_1Fixture Type (WC/Washbasin/Bathtub/Sink)
Fixture category (IS 2065)
Type identified: WC, WB, Bath, Sink, etc.
F_2Location (Unit/Floor/Room)
Fixture location (IS 2065)
Building address/unit/room number
F_3Installation Date
Completion date (IS 2065)
Date fixture installed
F_4QC Approval Date
QC sign-off (IS 2065)
QC inspector name and approval date
TESTS. TESTING RECORDS
T_1Hydrostatic Pressure Test - Date, Result (PASS/FAIL)
Pressure test completion (IS 2065)
Test date, pressure held, leakage result
T_2Joint Leakage Inspection - Date, Number Passed/Failed
Visual leakage check (IS 2065)
Date, count of joints inspected, pass/fail count
T_3Water Quality Test - Date, Result (PASS/FAIL)
Quality verification (IS 10500)
Test date, physical/chemical/microbiological results
T_4Flow & Pressure Test - Date, Pressure at Furthest Outlet (bar)
System performance (IS 2065)
Minimum 0.5 bar at furthest outlet at design flow
Showing 15 of 21 ·
Inspection Sign-Off
ACTIVE
UNDER MAINTENANCE
CLOSED
Register Maintained By
Name / Sign / Date
Reviewed By (Building Manager)
Name / Sign / Date