S.No.CheckpointIS RequirementStatus
A. JOINT & FITTING PREPARATION
A1Fitting type and material verification (Tee, Elbow, Reducer, etc)
Acceptance: Fitting type matches design drawing; material same as pipe (UPVC/HDPE/PPR)
Verify fitting appropriateness
OK
NC
NA
HOLD
A2Pressure class compatibility (Fitting class ≥ Pipe class)
Acceptance: Fitting class A if pipe is A; no lower class fittings in system
Ensure system pressure rating integrity
OK
NC
NA
HOLD
A3Pipe end preparation (cut square, no burrs, chamfered if required)
Acceptance: Cut 90° to pipe axis; no burrs >1 mm; chamfer 1-2 mm on both surfaces
Ready pipes for joining
OK
NC
NA
HOLD
A4Cleaning of pipe/fitting ends (remove dust, moisture, debris)
Acceptance: Dry, clean surfaces; no dirt, moisture, or PVC dust before cementing
Ensure clean joint interface
OK
NC
NA
HOLD
B. SOLVENT CEMENTING JOINTS (UPVC/PVC)
B1Cement type and quality (Approved solvent cement per IS 4985)
Acceptance: ISI marked cement; correct formulation for pipe class/size; expiry date valid
Use specified adhesive
OK
NC
NA
HOLD
B2Cement application technique (Primer if required, even coat on both surfaces)
Acceptance: Primer applied if recommended; cement applied uniformly to pipe OD and fitting ID
Proper joint preparation
OK
NC
NA
HOLD
B3Assembly procedure (Push socket fully into fitting within time limit)
Acceptance: Socket pushed fully onto spigot within pot life; held for 30 secs; marks level
Ensure full depth seating
OK
NC
NA
HOLD
B4Joint curing time observed (minimum 24 hrs before pressure test)
Acceptance: No flow/water through joint for 24 hrs minimum; temperature >15°C during curing
Allow adhesive to set
OK
NC
NA
HOLD
C. MECHANICAL/COMPRESSION JOINTS (UPVC/HDPE)
C1Compression fitting assembly (O-ring, ferrule, nut properly seated)
Acceptance: O-ring present and lubricated; ferrule seating correct; nut hand-tight plus 3/4 turn
Correct mechanical assembly
OK
NC
NA
HOLD
C2Tightening torque verification (if applicable, wrench tightness recorded)
Acceptance: Torque per fitting spec (typically 20-30 N·m); no leakage when tested
Adequate sealing without over-tightening
OK
NC
NA
HOLD
C3Visual leakage check at connection
Acceptance: No visible leakage from joint; dry connection at rest
Verify joint integrity
OK
NC
NA
HOLD
Showing 11 of 22 checkpoints ·
A. JOINT & FITTING PREPARATION
A1Fitting type and material verification (Tee, Elbow, Reducer, etc)
Verify fitting appropriateness (IS 4985)
Fitting type matches design drawing; material same as pipe (UPVC/HDPE/PPR)
OKNCNAHOLD
A2Pressure class compatibility (Fitting class ≥ Pipe class)
Ensure system pressure rating integrity (IS 4985)
Fitting class A if pipe is A; no lower class fittings in system
OKNCNAHOLD
A3Pipe end preparation (cut square, no burrs, chamfered if required)
Ready pipes for joining (IS 4985)
Cut 90° to pipe axis; no burrs >1 mm; chamfer 1-2 mm on both surfaces
OKNCNAHOLD
A4Cleaning of pipe/fitting ends (remove dust, moisture, debris)
Ensure clean joint interface (IS 4985)
Dry, clean surfaces; no dirt, moisture, or PVC dust before cementing
OKNCNAHOLD
B. SOLVENT CEMENTING JOINTS (UPVC/PVC)
B1Cement type and quality (Approved solvent cement per IS 4985)
Use specified adhesive (IS 4985)
ISI marked cement; correct formulation for pipe class/size; expiry date valid
OKNCNAHOLD
B2Cement application technique (Primer if required, even coat on both surfaces)
Proper joint preparation (IS 4985)
Primer applied if recommended; cement applied uniformly to pipe OD and fitting ID
OKNCNAHOLD
B3Assembly procedure (Push socket fully into fitting within time limit)
Ensure full depth seating (IS 4985)
Socket pushed fully onto spigot within pot life; held for 30 secs; marks level
OKNCNAHOLD
B4Joint curing time observed (minimum 24 hrs before pressure test)
Allow adhesive to set (IS 4985)
No flow/water through joint for 24 hrs minimum; temperature >15°C during curing
OKNCNAHOLD
C. MECHANICAL/COMPRESSION JOINTS (UPVC/HDPE)
C1Compression fitting assembly (O-ring, ferrule, nut properly seated)
Correct mechanical assembly (IS 4985)
O-ring present and lubricated; ferrule seating correct; nut hand-tight plus 3/4 turn
OKNCNAHOLD
C2Tightening torque verification (if applicable, wrench tightness recorded)
Adequate sealing without over-tightening (IS 4985)
Torque per fitting spec (typically 20-30 N·m); no leakage when tested
OKNCNAHOLD
C3Visual leakage check at connection
Verify joint integrity (IS 4985)
No visible leakage from joint; dry connection at rest
OKNCNAHOLD
Showing 11 of 22 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED
Inspection Summary
Name / Sign / Date
Joints Accepted
Name / Sign / Date
Joints Rejected
Name / Sign / Date
Defects Found
Name / Sign / Date
Corrective Actions Required
Name / Sign / Date
Overall Verdict
Name / Sign / Date
Inspected By
Name / Sign / Date
Reviewed By
Name / Sign / Date