AIRPORTUnder construction

Noida International Airport (Jewar)

Greenfield international airport (under construction)
📍 Noida, Greater Noida · Uttar Pradesh
₹30.0K
crore
COST
2025
4 yrs build
EXPECTED
Noida
Uttar Pradesh
LOCATION

About

Greenfield airport at Jewar (Greater Noida), designed for 70 MPPA at full build-out — when complete, the world's 4th-largest airport by area. First commercial flight target 2025.
Also known asNIAJewar AirportDXN

Noida International Airport at Jewar (NIA, code DXN) is a greenfield international airport under construction near Greater Noida in western UP — when complete, the world's fourth-largest airport by area (5,000+ hectares) and India's largest airport by passenger capacity (designed for 70 million passengers per year at full build-out).

The airport is operated by Zurich Airport (Flughafen Zürich AG) under a 40-year concession won in 2019 — the first such concession to a foreign operator in Indian airport infrastructure history. The unusual choice of Zurich (over Indian incumbents like GMR/Adani) reflected the UP government's preference for international operational benchmarking + financial backing from Zurich's strong credit profile.

NIAL — the project SPV — was formed in 2018 by Yamuna Expressway Industrial Development Authority (YEIDA) + Government of UP. Tata Projects is the lead civil contractor with L&T sharing major packages. Phase 1 (1 runway + 1 terminal, ~12 MPPA capacity) total cost: ₹6,000 crore; full build-out (4 runways + 4 terminals, 70 MPPA) over 30 years totalling ₹30,000+ crore.

The airport sits at the heart of Yamuna Expressway industrial corridor and will be served by: dedicated Yamuna Expressway access (existing), pod-taxi system from Greater Noida (planned), and a Greater Noida-Jewar metro line (under sanction). First commercial flight target October 2025, after slippage from earlier 2024 date.

Cross-references

7

Indian Standards, IRC codes, and InfraLens knowledge articles that bear on this project's design and execution. Each link opens the relevant reference page.

Related calculators

4

InfraLens calculators most relevant for airport projects.

Notable features

  • World's 4th-largest airport by area when complete (5,000+ hectares)
  • Designed for 70 MPPA at full build-out — India's largest passenger capacity
  • First major Indian airport operated by a foreign operator (Zurich Airport)
  • ₹30,000+ crore total project investment over 30 years
  • Dedicated pod-taxi system from Greater Noida (planned)
  • Sits at heart of Yamuna Expressway industrial corridor
  • Tata Projects + L&T executing

Records

3
01
World's 4th-largest airport by area when complete
02
India's largest airport by designed passenger capacity
03
First Indian airport with foreign operator (Zurich) under long-term concession

Stakeholders

3
NI
Client / Owner
Noida International Airport Limited (NIAL) — Zurich Airport (Flughafen Zürich AG)
TP
Contractor
Tata Projects (lead)
LT
Contractor
Larsen & Toubro

Engineering

Structural type
Greenfield international airport (under construction)