📍 When to use this template
- Whenever any material is identified as scrap or waste during construction activities.
- Updated daily or weekly by the Stores In-charge or a designated supervisor.
- It is a running document maintained throughout the project lifecycle, from the first scrap generation to final site clearance.
Sections & fields
Preview of the template structure. Download Excel to fill on site.
1Header & Project Information6 fields
Project Name
_____________
Contract Package No.
_____________
Register No.
_____________
Location / Yard Name
_____________
Prepared By (Stores In-charge)
_____________
2Scrap Generation Details5 fields
Date of Generation
_____________
Source of Scrap (e.g., Rebar Yard, Shuttering Area, Batching Plant)
_____________
Material Description (e.g., MS Rebar Cut Pieces, Damaged Plywood, Empty Cement Bags)
_____________
Original Material Reference (GRN No. / Invoice No.)
_____________
3Quantity & Measurement5 fields
Unit of Measurement (UoM - Kg, Tonne, Nos., Lot)
_____________
Estimated Quantity
_____________
Method of Measurement (e.g., Weighbridge, Counting, Volumetric)
_____________
Verified By (Site Engineer/PMC)
_____________
4Storage & Handling4 fields
Storage Location (Scrap Yard Bay No.)
_____________
Date Moved to Storage
_____________
Condition (e.g., Segregated, Mixed, Hazardous)
_____________
Handling Method (e.g., Manual, Using Hydra/Crane)
_____________
5Disposal / Sale Details8 fields
Disposal Method (e.g., Sale, Auction, Handed over to Client, Landfill)
_____________
Disposal Date
_____________
Gate Pass / Challan No.
_____________
Weighbridge Slip No. (Outgoing)
_____________
Quantity Disposed
_____________
Sold To / Agency Name
_____________
Sale Value (₹)
_____________
6Reconciliation & Closing Balance6 fields
Cumulative Quantity Generated
_____________
Cumulative Quantity Disposed
_____________
Closing Balance in Stock
_____________
Remarks (e.g., Awaiting disposal, To be reused)
_____________
Entry Closed By
_____________
Date of Closing
_____________
💡 Sample filled excerpt
S.No: 21 | Date: 15-May-2024 | Source: Rebar Yard | Material: TMT Rebar Cut Pieces (<1m) | UoM: Kg | Est. Qty: 450 | Disposal Method: Sale | Gate Pass: GP-OUT-512 | Sale Value (₹): 13,500
⚖ Compliance notes
- Essential for preparing Material Reconciliation Statements to account for wastage against theoretical consumption.
- Provides documentation for environmental audits and compliance with Construction and Demolition Waste Management Rules, 2016.
- Supports financial accounting by tracking revenue from scrap sales and justifying material wastage percentages.
- Can be used as evidence for contract claims related to material wastage if limits are exceeded due to client-induced changes (relevant to FIDIC Sub-clause 4.12).