Project Procedures Manual — Index

document
PMC-MOB-DOC-004·v1.0-beta·⚠ Beta — review before use

This is the master list or 'Table of Contents' for your Project Procedures Manual (PPM). The PPM is the rulebook for the entire project, defining every process from drawing approvals to billing, ensuring everyone follows the same standard procedures.

ReferencesFIDIC Conditions of Contract (Sub-Clauses 1.3, 4.1, 8.3, 13.1, 14.3, 20.1)CPWD Works Manual 2019 (Chapter on Contract Management)PMI PMBOK Guide (Integration Management, Communications Management)BOCW Act 1996
Download
📍 When to use this template
  • Prepared once at the start of the project during the mobilization phase.
  • Finalized and approved before major site activities commence. It is a living document, updated if procedures change.
  • Prepared by the Project Manager / PMC Lead, with input from all department heads (Engineering, QA/QC, Safety, Contracts).
Sections & fields
Preview of the template structure. Download Excel to fill on site.
1Header & Document Control9 fields
Project Name
_____________
Contract / Package No.
_____________
Document Title: Project Procedures Manual
_____________
Document Number
_____________
Revision No.
_____________
Date of Issue
_____________
Prepared By (PMC)
_____________
Reviewed By (Contractor)
_____________
Approved By (Client/Engineer-in-Charge)
_____________
21.0 General & Contract Management Procedures8 fields
Procedure for Project Organization Chart & RACI Matrix
_____________
Procedure for Communication & Correspondence Protocol
_____________
Procedure for Meetings & Reporting
_____________
Procedure for Contract Administration & Notices
_____________
Procedure for Change Management / Variation Order
_____________
Procedure for Extension of Time (EOT) Claims
_____________
Procedure for Dispute Resolution
_____________
Procedure for Project Close-out
_____________
32.0 Engineering & Design Management Procedures7 fields
Procedure for Document Control & Numbering System
_____________
Procedure for Drawing & Document Submission/Approval
_____________
Procedure for Request for Information (RFI)
_____________
Procedure for Method Statement & ITP Submission
_____________
Procedure for Material Submittal & Approval (MSA)
_____________
Procedure for As-Built Drawing Management
_____________
Procedure for Shop Drawing Management
_____________
43.0 Procurement & Site Execution Procedures7 fields
Procedure for Procurement & Vendor Management
_____________
Procedure for Material Receipt, Storage & Reconciliation
_____________
Procedure for Site Mobilization & Demobilization
_____________
Procedure for Work Inspection Request (WIR) / Pour Card
_____________
Procedure for Non-Conformance Report (NCR)
_____________
Procedure for Daily Progress Report (DPR)
_____________
Procedure for Plant & Machinery Management
_____________
54.0 Quality Assurance & Quality Control (QA/QC) Procedures6 fields
Project Quality Plan (PQP)
_____________
Procedure for Inspection & Test Plan (ITP) Development
_____________
Procedure for Material Testing & Laboratory Management
_____________
Procedure for Calibration of Equipment
_____________
Procedure for Quality Audits (Internal & External)
_____________
Procedure for Handling of Non-Conforming Products
_____________
65.0 Health, Safety & Environment (HSE) Procedures8 fields
Project HSE Plan
_____________
Procedure for Permit to Work (PTW) System
_____________
Procedure for Incident Reporting & Investigation
_____________
Emergency Response Plan (ERP)
_____________
Procedure for HSE Audits & Inspections
_____________
Procedure for Toolbox Talks & Trainings
_____________
Procedure for Waste Management
_____________
Procedure for Labour Camp & Welfare Management
_____________
76.0 Billing & Financial Procedures5 fields
Procedure for RA Bill Submission & Certification Cycle
_____________
Procedure for Measurement Book (MB) Maintenance
_____________
Procedure for Reconciliation of Free-Issue Materials
_____________
Procedure for Price Escalation / Adjustment Claims
_____________
Procedure for Final Bill Preparation & Settlement
_____________
💡 Sample filled excerpt
Section 4.0: Quality Assurance & Quality Control Procedures
4.1: Project Quality Plan (PQP) - Doc No. XYZ/PQP/001
4.2: Procedure for Inspection & Test Plan (ITP) - Doc No. XYZ/PRO/QAQC/001
4.3: Procedure for Material Testing - Doc No. XYZ/PRO/QAQC/002
⚖ Compliance notes
  • Defines agreed-upon procedures for fulfilling contractual obligations under FIDIC (e.g., Clause 4 [The Contractor], Clause 8 [Commencement, Delays and Suspension], Clause 13 [Variations and Adjustments], Clause 14 [Contract Price and Payment]).
  • Establishes the framework for documentation required by CPWD Works Manual, ensuring systematic record-keeping for audits.
  • Includes procedures for HSE and Labour compliance, which are essential for adherence to the BOCW Act 1996 and Contract Labour (R&A) Act 1970.