Formats  › Tendering & Contracts  › BOQ Format (CPWD-style)
Schedule · FMT-TND-005
BOQ Format (CPWD-style)
14 fields across 4 sections. Standard CPWD / PWD BOQ for tendering — the primary commercial document of every government work.
14 Fields
4 Sections
Per tender / per RA bill
Estimator, Tender Manager

Format Preview

S.No.Field / CheckpointReferenceStatus
A. TENDER + PROJECT HEADER
A1NIT + name of work + estimated cost + EMD + completion period
Acceptance: Block at top of BOQ matches NIT
As per NIT
OK
NC
NA
A2Page numbering + total pages
Acceptance: No missing page
Sequential — auditors verify
OK
NC
NA
B. BOQ COLUMNS
B1Item no. (e.g., 1.1, 1.2, 2.1)
Acceptance: Sequential, no gaps
Hierarchical numbering
OK
NC
NA
B2Description of item — full BOQ text per CPWD DSR or NIT
Acceptance: No abbreviated descriptions
Exact wording from DSR or NIT specification
OK
NC
NA
B3Unit (m, m², m³, kg, no., set, lumpsum, day, month)
Acceptance: Unit matches DSR
Standard unit per DSR
OK
NC
NA
B4Quantity — from BOQ
Acceptance: Locked field — bidder cannot edit
Estimated qty by EE / designer
OK
NC
NA
B5Rate (₹ per unit) — bidder fills
Acceptance: All items quoted, none blank
Item rate or % over estimated
OK
NC
NA
B6Amount (₹) = qty × rate
Acceptance: Excel formula or manual calculation tallied
Auto-computed
OK
NC
NA
C. BOQ STRUCTURE
C1Sub-head 1: Site Preparation / Earthwork
Acceptance: Sub-head total at end
Per DSR or NIT chapter sequence
OK
NC
NA
C2Sub-head 2: PCC / RCC / Masonry
Acceptance: All items under correct sub-head
Logical work-package grouping
OK
NC
NA
C3Sub-head 3-N: Finishes, MEP, External works
Acceptance: Complete coverage
Per project scope
OK
NC
NA
C4Sub-head totals + Grand total + Provisional sums
Acceptance: Provisional sums separately listed
All subtotals shown
OK
NC
NA
Showing 12 of 14 fields ·
A. TENDER + PROJECT HEADER
A1NIT + name of work + estimated cost + EMD + completion period
As per NIT
Block at top of BOQ matches NIT
OKNCNA
A2Page numbering + total pages
Sequential — auditors verify
No missing page
OKNCNA
B. BOQ COLUMNS
B1Item no. (e.g., 1.1, 1.2, 2.1)
Hierarchical numbering
Sequential, no gaps
OKNCNA
B2Description of item — full BOQ text per CPWD DSR or NIT
Exact wording from DSR or NIT specification
No abbreviated descriptions
OKNCNA
B3Unit (m, m², m³, kg, no., set, lumpsum, day, month)
Standard unit per DSR
Unit matches DSR
OKNCNA
B4Quantity — from BOQ
Estimated qty by EE / designer
Locked field — bidder cannot edit
OKNCNA
B5Rate (₹ per unit) — bidder fills
Item rate or % over estimated
All items quoted, none blank
OKNCNA
B6Amount (₹) = qty × rate
Auto-computed
Excel formula or manual calculation tallied
OKNCNA
C. BOQ STRUCTURE
C1Sub-head 1: Site Preparation / Earthwork
Per DSR or NIT chapter sequence
Sub-head total at end
OKNCNA
C2Sub-head 2: PCC / RCC / Masonry
Logical work-package grouping
All items under correct sub-head
OKNCNA
C3Sub-head 3-N: Finishes, MEP, External works
Per project scope
Complete coverage
OKNCNA
C4Sub-head totals + Grand total + Provisional sums
All subtotals shown
Provisional sums separately listed
OKNCNA
Showing 12 of 14 ·
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date