InfraLensInfraLens
IS CodesIRCToolsSORHandbookQA/QCPMCFormatsCPHEEOMapsProjectsDCRRulesAbout Join Channel
Join
IS CodesIRCToolsSORHandbookQA/QCPMCFormatsCPHEEOMapsProjectsDCRDesign RulesBIMAbout Join WhatsApp Channel
InfraLensInfraLens
IS CodesIRCToolsSORHandbookQA/QCPMCFormatsCPHEEOMapsProjectsDCRRulesAbout Join Channel
Join
IS CodesIRCToolsSORHandbookQA/QCPMCFormatsCPHEEOMapsProjectsDCRDesign RulesBIMAbout Join WhatsApp Channel

IS 2770 Part 2 : 1993Safety code for tunnelling work: Part 2 Working in soft ground

PDFGoogleCompareBIS Portal
Link points to Internet Archive / others. Not hosted by InfraLens. Details
International Comparison — Coming Soon
CurrentSpecializedSafety CodeGeotechnical · Construction Safety and Practices
PDFGoogleCompareBIS Portal
Link points to Internet Archive / others. Not hosted by InfraLens. Details
OverviewValues4InternationalTablesFAQ3Related

IS 2770:1993 Part 2 is the Indian Standard (BIS) for safety code for tunnelling work: part 2 working in soft ground. This standard prescribes safety measures for tunnelling operations in soft ground conditions. It covers essential precautions for excavation, temporary supports (shoring/timbering), ventilation, gas monitoring, and dewatering to prevent cave-ins and ensure worker safety.

Lays down safety requirements for tunnelling operations specifically in soft ground, covering methods, ground stabilization, and support.

Overview

Status
Current
Usage level
Specialized
Domain
Geotechnical — Construction Safety and Practices
Type
Safety Code
Typically used with
IS 3764IS 4138IS 4756IS 5878
Also on InfraLens for IS 2770
4Key values3FAQs
Practical Notes
! Ensure immediate installation of temporary supports (timbering or steel ribs) right after excavation to prevent sudden face collapse.
! Continuous monitoring for ground settlement and toxic/explosive gases is mandatory in soft soil strata.
! Dewatering must be carefully managed to avoid excessive surface subsidence or instability of adjacent structures.
Frequently referenced clauses
Cl. 4Precautions during Excavation in Soft GroundCl. 5Timbering, Shoring and Temporary SupportsCl. 6Ventilation and Gas MonitoringCl. 7Dewatering and Groundwater ControlCl. 8Emergency Exits and Rescue Procedures
Pulled from IS 2770:1993. Browse the full clause & table index below in Tables & Referenced Sections.
soft groundsoiltimbershotcretesteel

International Equivalents

🌐
International Comparison — Coming Soon
We're adding equivalent international standards for this code.

Key Values4

Quick Reference Values
minimum ventilation rate6 m³/min per person
max permissible methane concentration1.25%
max voltage for portable lighting24 V
minimum illumination at working face50 Lux

Tables & Referenced Sections

Key Tables
No tables data
Key Clauses
Clause 4 - Precautions during Excavation in Soft Ground
Clause 5 - Timbering, Shoring and Temporary Supports
Clause 6 - Ventilation and Gas Monitoring
Clause 7 - Dewatering and Groundwater Control
Clause 8 - Emergency Exits and Rescue Procedures

Related Resources on InfraLens

Cross-Referenced Codes
IS 3764:1992Safety code for excavation work
→
IS 4138:1977Safety code for working in compressed air
→
IS 4756:1978Safety code for tunnelling work
→
IS 5878:1970Glossary of terms relating to tunneling
→

Frequently Asked Questions3

What is the minimum fresh air supply required in the tunnel?+
A minimum of 6 cubic meters per minute per worker must be supplied to ensure a safe breathing atmosphere.
What is the maximum allowed methane concentration?+
All work must be halted and personnel evacuated if the methane concentration in the tunnel exceeds 1.25%.
What is the safe operating voltage for portable lighting in underground wet conditions?+
Portable hand lamps must operate at a maximum of 24 Volts to prevent electrocution in highly conductive environments.

QA/QC Inspection Templates

📋
QA/QC templates coming soon for this code.
Browse all 300 templates →