S.No.CheckpointIS RequirementStatus
A. Investigation Summary
A1All boreholes logged per IS 1892 — stratum identified, samples collected, depth confirmed
Acceptance: Bore logs complete with stratum description, colour, consistency, SPT N-values, water table depth
IS 1892 Clause 5 (Field Investigation)
OK
NC
NA
HOLD
A2Sampling strategy — disturbed and undisturbed samples collected per design
Acceptance: Minimum 1 undisturbed sample per 2m depth or as per site design; samples sealed, labelled, transported to lab
IS 1892 Clause 6 (Sampling)
OK
NC
NA
HOLD
A3In-situ test results recorded — SPT, CPT, or vane shear as applicable
Acceptance: SPT hammering procedure per IS 2131 Table 1 (15 blows per 300mm, N-values recorded); CPT tip resistance and sleeve friction; vane shear torque
IS 2131 Clause 4 (Field Tests)
OK
NC
NA
HOLD
A4Laboratory test programme — classification, consolidation, strength tests completed
Acceptance: All samples tested per IS 2720 Part 2 (grain size), Part 5 (liquid/plastic limit), Part 10 (shear strength); results within acceptable range for founding layer
IS 1892 Clause 6 (Laboratory Analysis)
OK
NC
NA
HOLD
A5Geotechnical report issued — bearing capacity, settlement analysis, founding recommendations
Acceptance: Report includes stratum profile, soil parameters (c, φ, γ, E), bearing capacity per IS 2131, settlement analysis, foundation depth recommendation, water table conclusions
IS 1892 Clause 7 (Report)
OK
NC
NA
HOLD
A. Investigation Summary
A1All boreholes logged per IS 1892 — stratum identified, samples collected, depth confirmed
IS 1892 Clause 5 (Field Investigation) (IS 1892:2014)
Bore logs complete with stratum description, colour, consistency, SPT N-values, water table depth
OKNCNAHOLD
A2Sampling strategy — disturbed and undisturbed samples collected per design
IS 1892 Clause 6 (Sampling) (IS 1892:2014)
Minimum 1 undisturbed sample per 2m depth or as per site design; samples sealed, labelled, transported to lab
OKNCNAHOLD
A3In-situ test results recorded — SPT, CPT, or vane shear as applicable
IS 2131 Clause 4 (Field Tests) (IS 2131:1981)
SPT hammering procedure per IS 2131 Table 1 (15 blows per 300mm, N-values recorded); CPT tip resistance and sleeve friction; vane shear torque
OKNCNAHOLD
A4Laboratory test programme — classification, consolidation, strength tests completed
IS 1892 Clause 6 (Laboratory Analysis) (IS 1892:2014)
All samples tested per IS 2720 Part 2 (grain size), Part 5 (liquid/plastic limit), Part 10 (shear strength); results within acceptable range for founding layer
OKNCNAHOLD
A5Geotechnical report issued — bearing capacity, settlement analysis, founding recommendations
IS 1892 Clause 7 (Report) (IS 1892:2014)
Report includes stratum profile, soil parameters (c, φ, γ, E), bearing capacity per IS 2131, settlement analysis, foundation depth recommendation, water table conclusions
OKNCNAHOLD
Inspection Sign-Off
All investigations complete and approved
Reinvestigation required in areas
Pending laboratory results
Conditional approval with recommendations
Geotechnical Engineer Name
Name / Sign / Date
Geotechnical Engineer Signature
Name / Sign / Date
QC Engineer Name
Name / Sign / Date
QC Engineer Signature
Name / Sign / Date