QA/QC  › Soil & Foundation  › Atterberg Limits Test
Test-report · QC-SOL-TST-004
Atterberg Limits Test Report
23 checkpoints across 6 sections. Required for all fine-grained soil samples to determine plasticity, classify soil per IS 1498, assess expansion potential, & evaluate suitability for foundations & embankments
23 Checkpoints
6 Sections
Once per borrow pit/soil source; additional tests if source changes or variability observed; repeat if initial test rejected
Geotechnical Engineer, Lab Technician

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. SAMPLE DETAILS & PREPARATION
A1Sample identification
Acceptance: Identification legible; depth ≥0.5 m below surface or as specified
Sample ID, location, depth clearly documented
OK
NC
NA
HOLD
A2Sample preparation — passing 425 μm sieve
Acceptance: Material homogeneous; all particles pass 425 μm sieve; no crushing of clay aggregates; preparation documented
Soil passed through 425 μm (No. 40) IS sieve per IS 2720 Part 5 Clause 4.1; air-dried at room temperature; lumps gently broken; no grinding to prevent crushing of clay particles
OK
NC
NA
HOLD
A3Specific gravity determination (reference)
Acceptance: Gs value documented; used for Activity & liquidity index calculations if required
Specific gravity (Gs) measured per IS 2720 Part 3; typical range 2.60–2.75 for soil minerals
OK
NC
NA
HOLD
B. LIQUID LIMIT (LL) DETERMINATION
B1Equipment — Casagrande Apparatus
Acceptance: Apparatus calibrated; groove depth 2 mm at center; impact mechanism lifts cup 10 mm at 2 drops/sec; cup smooth & undamaged
Casagrande apparatus per IS 2720 Part 5 Clause 5.1: cup height = 10 mm, groove cut per standard pattern, groove closed at end, cup angle 30° to horizontal. OR cone penetrometer method (alternative)
OK
NC
NA
HOLD
B2Casagrande Method — Trial procedure
Acceptance: Each trial: blow count 10–50 range preferred; moisture range spans LL; groove closure observed at correct section
4–5 trials at different moisture contents: soil placed in cup, groove drawn through center with grooving tool (perpendicular to motion direction), cup dropped repeatedly, count blows until soil joins at bottom of groove
OK
NC
NA
HOLD
B3Casagrande — Blow count & moisture recording
Acceptance: Blow count accurate ±1; moisture content within ±0.5%; data tabulated: N vs w (%)
For each trial: (a) Number of blows (N) when soil groove closes; (b) Moisture content measured immediately from soil cup (oven-dry method per IS 2720 Part 2: 105°C, 24 hrs)
OK
NC
NA
HOLD
B4Casagrande — Flow curve & LL determination
Acceptance: Flow curve linear; R² >0.95; LL determined to nearest 0.5%; LL typically 20–60% for soils
Plot semi-log graph: X = log(N), Y = moisture content (%); line fitted through 4–5 points; LL = moisture content at N = 25 blows (extrapolated/interpolated from flow curve)
OK
NC
NA
HOLD
B5Cone Penetrometer Method (alternative)
Acceptance: Penetration depth recorded to ±0.5 mm; moisture at 20 mm penetration identified; method noted in report
If using cone penetrometer (IS 2720 Part 5 Clause 6.2): cone 30° angle, mass 80 g, penetration measured after 5 sec rest; LL = moisture content at 20 mm penetration; min 3 trials at different moisture contents
OK
NC
NA
HOLD
C. PLASTIC LIMIT (PL) DETERMINATION
C1Plastic Limit thread rolling method
Acceptance: Thread diameter 3.0 mm ±0.5 mm at rolling end; crumbling point clearly identified; procedure repeated min 3 times
Per IS 2720 Part 5 Clause 6.3: soil rolled on non-porous surface (glass plate) into thread of 3.0 mm diameter; at crumbling point (thread cannot be rolled further without breaking), moisture content determined = Plastic Limit
OK
NC
NA
HOLD
C2Minimum 3 determinations for PL
Acceptance: Three values recorded; range <2% (if >2%, repeat trials); consistency verified
Minimum 3 trials of plastic limit thread rolling; moisture content measured for each (oven-dry at 105°C, 24 hrs per IS 2720 Part 2)
OK
NC
NA
HOLD
C3Average PL calculation
Acceptance: Average calculated correctly; standard deviation <2%; outliers reviewed & justified
PL = average of 3 (or more) acceptable PL values; rounded to nearest 0.5%
OK
NC
NA
HOLD
Showing 11 of 23 checkpoints ·
A. SAMPLE DETAILS & PREPARATION
A1Sample identification
Sample ID, location, depth clearly documented (IS 2720 Part 5 — Section 4)
Identification legible; depth ≥0.5 m below surface or as specified
OKNCNAHOLD
A2Sample preparation — passing 425 μm sieve
Soil passed through 425 μm (No. 40) IS sieve per IS 2720 Part 5 Clause 4.1; air-dried at room temperature; lumps gently broken; no grinding to prevent crushing of clay particles (IS 2720 Part 5 — Clause 4.1)
Material homogeneous; all particles pass 425 μm sieve; no crushing of clay aggregates; preparation documented
OKNCNAHOLD
A3Specific gravity determination (reference)
Specific gravity (Gs) measured per IS 2720 Part 3; typical range 2.60–2.75 for soil minerals (IS 2720 Part 3 — Specific Gravity of Soil Solids)
Gs value documented; used for Activity & liquidity index calculations if required
OKNCNAHOLD
B. LIQUID LIMIT (LL) DETERMINATION
B1Equipment — Casagrande Apparatus
Casagrande apparatus per IS 2720 Part 5 Clause 5.1: cup height = 10 mm, groove cut per standard pattern, groove closed at end, cup angle 30° to horizontal. OR cone penetrometer method (alternative) (IS 2720 Part 5 — Clause 5.1 & 5.2)
Apparatus calibrated; groove depth 2 mm at center; impact mechanism lifts cup 10 mm at 2 drops/sec; cup smooth & undamaged
OKNCNAHOLD
B2Casagrande Method — Trial procedure
4–5 trials at different moisture contents: soil placed in cup, groove drawn through center with grooving tool (perpendicular to motion direction), cup dropped repeatedly, count blows until soil joins at bottom of groove (IS 2720 Part 5 — Clause 6.1 (Casagrande))
Each trial: blow count 10–50 range preferred; moisture range spans LL; groove closure observed at correct section
OKNCNAHOLD
B3Casagrande — Blow count & moisture recording
For each trial: (a) Number of blows (N) when soil groove closes; (b) Moisture content measured immediately from soil cup (oven-dry method per IS 2720 Part 2: 105°C, 24 hrs) (IS 2720 Part 5 — Clause 6.1)
Blow count accurate ±1; moisture content within ±0.5%; data tabulated: N vs w (%)
OKNCNAHOLD
B4Casagrande — Flow curve & LL determination
Plot semi-log graph: X = log(N), Y = moisture content (%); line fitted through 4–5 points; LL = moisture content at N = 25 blows (extrapolated/interpolated from flow curve) (IS 2720 Part 5 — Clause 7.1)
Flow curve linear; R² >0.95; LL determined to nearest 0.5%; LL typically 20–60% for soils
OKNCNAHOLD
B5Cone Penetrometer Method (alternative)
If using cone penetrometer (IS 2720 Part 5 Clause 6.2): cone 30° angle, mass 80 g, penetration measured after 5 sec rest; LL = moisture content at 20 mm penetration; min 3 trials at different moisture contents (IS 2720 Part 5 — Clause 6.2 (Cone Penetrometer))
Penetration depth recorded to ±0.5 mm; moisture at 20 mm penetration identified; method noted in report
OKNCNAHOLD
C. PLASTIC LIMIT (PL) DETERMINATION
C1Plastic Limit thread rolling method
Per IS 2720 Part 5 Clause 6.3: soil rolled on non-porous surface (glass plate) into thread of 3.0 mm diameter; at crumbling point (thread cannot be rolled further without breaking), moisture content determined = Plastic Limit (IS 2720 Part 5 — Clause 6.3)
Thread diameter 3.0 mm ±0.5 mm at rolling end; crumbling point clearly identified; procedure repeated min 3 times
OKNCNAHOLD
C2Minimum 3 determinations for PL
Minimum 3 trials of plastic limit thread rolling; moisture content measured for each (oven-dry at 105°C, 24 hrs per IS 2720 Part 2) (IS 2720 Part 5 — Clause 6.3 & 7.2)
Three values recorded; range <2% (if >2%, repeat trials); consistency verified
OKNCNAHOLD
C3Average PL calculation
PL = average of 3 (or more) acceptable PL values; rounded to nearest 0.5% (IS 2720 Part 5 — Clause 7.2)
Average calculated correctly; standard deviation <2%; outliers reviewed & justified
OKNCNAHOLD
Showing 11 of 23 ·
Inspection Sign-Off
PASS — LL, PL, PI determined; classification valid; results acceptable
FAIL — Procedure non-conformance; test repeat required
PASS with remarks — Results valid; see conclusions section for notes
Test Conducted by (Lab Technician)
Name / Sign / Date
Signature
Name / Sign / Date
Reviewed by (Geotechnical Engineer)
Name / Sign / Date
Signature & Seal
Name / Sign / Date
Final Verdict
Name / Sign / Date