QA/QC  › Scaffolding & Safety  › Safety Works ITP
Plan · QC-SCF-PLN-001
Safety Works ITP
17 checkpoints across 4 sections. Before scaffold works commence; communicated to all stakeholders
17 Checkpoints
4 Sections
Once per project; updated if scope changes
Contractor, Safety Officer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. HOLD POINTS (Work Stop - Approval Required)
A1HP-1: Design Approval - Scaffold design approved by structural engineer before erection
Acceptance: Design drawing signed; Load capacity noted; Engineer stamp & date present
Clause 1.1 — Design verification
OK
NC
NA
HOLD
A2HP-2: Safety Plan Approved - Site safety management plan & method statement approved
Acceptance: Plan document signed; Training plan included; Emergency procedures defined
Clause 1.2 — Safety documentation
OK
NC
NA
HOLD
A3HP-3: Material Certification - All scaffold materials (tubes, couplers, boards) inspected & certified
Acceptance: Inspection certs present; No defects observed; Color-coded per code
Clause 1.3 — Material quality
OK
NC
NA
HOLD
A4HP-4: Worker Induction Complete - All personnel receive safety induction; records signed
Acceptance: Induction training conducted; Attendance list signed; Competency confirmed
Clause 1.4 — Personnel readiness
OK
NC
NA
HOLD
A5HP-5: Scaffold Load Test Passed - Load test conducted per QC-SCF-TST-001; pass verdict obtained
Acceptance: Test report completed; Load capacity verified; No permanent deformation
Clause 1.5 — Capacity verification
OK
NC
NA
HOLD
B. INSPECTION POINTS (QC Inspections - Must Pass)
B1IP-1: Scaffold Erection Inspection - Per QC-SCF-CHK-001 after erection complete
Acceptance: Checklist completed; All items OK; Erection certificate issued
Clause 2.1 — Structural inspection
OK
NC
NA
HOLD
B2IP-2: Daily Scaffold Inspection - Per QC-SCF-CHK-002 every morning before work
Acceptance: Daily checklist completed; Inspector signed; Safe verdict recorded
Clause 2.2 — Ongoing verification
OK
NC
NA
HOLD
B3IP-3: PPE Inspection - Per QC-SCF-CHK-003 weekly; helmets, harnesses, safety nets checked
Acceptance: Weekly inspection completed; All PPE compliant; Defective items removed
Clause 2.3 — Safety equipment
OK
NC
NA
HOLD
C. WITNESS POINTS (Contractor Notify QC; QC Must Be Present)
C1WP-1: Ground Preparation - Base plates, foundation level verified before first vertical installed
Acceptance: Level check done; Bearing capacity confirmed; Base plates in place
Clause 3.1 — Foundation
OK
NC
NA
HOLD
C2WP-2: First Vertical Erection - First scaffolding column installed; alignment verified
Acceptance: Plumb checked; Connections tight; Base secured; Photo documentation
Clause 3.2 — Initial setting
OK
NC
NA
HOLD
C3WP-3: Ledger Installation - Building anchorages installed; load test conducted
Acceptance: Anchorages per design; Load test ≥design load; Bolts torqued
Clause 3.3 — Tie-in to structure
OK
NC
NA
HOLD
C4WP-4: Platform Installation - First platform installed; boards level & secured
Acceptance: Boards level; Gap <50mm; Guard rails installed; Access provided
Clause 3.4 — Working platform
OK
NC
NA
HOLD
C5WP-5: Safety System Installation - Catch nets, safety barriers, handrails installed
Acceptance: Systems per design; Installed correctly; Tested for function
Clause 3.5 — Protective systems
OK
NC
NA
HOLD
Showing 13 of 17 checkpoints ·
A. HOLD POINTS (Work Stop - Approval Required)
A1HP-1: Design Approval - Scaffold design approved by structural engineer before erection
Clause 1.1 — Design verification (IS 3696)
Design drawing signed; Load capacity noted; Engineer stamp & date present
OKNCNAHOLD
A2HP-2: Safety Plan Approved - Site safety management plan & method statement approved
Clause 1.2 — Safety documentation (IS 3696)
Plan document signed; Training plan included; Emergency procedures defined
OKNCNAHOLD
A3HP-3: Material Certification - All scaffold materials (tubes, couplers, boards) inspected & certified
Clause 1.3 — Material quality (IS 3696)
Inspection certs present; No defects observed; Color-coded per code
OKNCNAHOLD
A4HP-4: Worker Induction Complete - All personnel receive safety induction; records signed
Clause 1.4 — Personnel readiness (IS 3696)
Induction training conducted; Attendance list signed; Competency confirmed
OKNCNAHOLD
A5HP-5: Scaffold Load Test Passed - Load test conducted per QC-SCF-TST-001; pass verdict obtained
Clause 1.5 — Capacity verification (IS 3696)
Test report completed; Load capacity verified; No permanent deformation
OKNCNAHOLD
B. INSPECTION POINTS (QC Inspections - Must Pass)
B1IP-1: Scaffold Erection Inspection - Per QC-SCF-CHK-001 after erection complete
Clause 2.1 — Structural inspection (IS 3696)
Checklist completed; All items OK; Erection certificate issued
OKNCNAHOLD
B2IP-2: Daily Scaffold Inspection - Per QC-SCF-CHK-002 every morning before work
Clause 2.2 — Ongoing verification (IS 3696)
Daily checklist completed; Inspector signed; Safe verdict recorded
OKNCNAHOLD
B3IP-3: PPE Inspection - Per QC-SCF-CHK-003 weekly; helmets, harnesses, safety nets checked
Clause 2.3 — Safety equipment (IS 3696)
Weekly inspection completed; All PPE compliant; Defective items removed
OKNCNAHOLD
C. WITNESS POINTS (Contractor Notify QC; QC Must Be Present)
C1WP-1: Ground Preparation - Base plates, foundation level verified before first vertical installed
Clause 3.1 — Foundation (IS 3696)
Level check done; Bearing capacity confirmed; Base plates in place
OKNCNAHOLD
C2WP-2: First Vertical Erection - First scaffolding column installed; alignment verified
Clause 3.2 — Initial setting (IS 3696)
Plumb checked; Connections tight; Base secured; Photo documentation
OKNCNAHOLD
C3WP-3: Ledger Installation - Building anchorages installed; load test conducted
Clause 3.3 — Tie-in to structure (IS 3696)
Anchorages per design; Load test ≥design load; Bolts torqued
OKNCNAHOLD
C4WP-4: Platform Installation - First platform installed; boards level & secured
Clause 3.4 — Working platform (IS 3696)
Boards level; Gap <50mm; Guard rails installed; Access provided
OKNCNAHOLD
C5WP-5: Safety System Installation - Catch nets, safety barriers, handrails installed
Clause 3.5 — Protective systems (IS 3696)
Systems per design; Installed correctly; Tested for function
OKNCNAHOLD
Showing 13 of 17 ·
Inspection Sign-Off
ITP APPROVED & READY
ITP APPROVED WITH MODIFICATIONS
ITP REJECTED — RESUBMIT
Remarks / Conditions
Name / Sign / Date
Prepared By (Contractor)
Name / Sign / Date
Reviewed By (Safety Officer)
Name / Sign / Date
Approved By (Client)
Name / Sign / Date