QA/QC  › Painting & Coatings  › Painting Works Register
Register · QC-PNT-REG-001
Painting Works Register
19 checkpoints across 2 sections. Daily painting operations; continuous register throughout project
19 Checkpoints
2 Sections
Daily entries; weekly & monthly summaries
QC Engineer, Painting Contractor

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. DAILY PAINTING RECORD COLUMNS
C1Date
Acceptance: DD/MM/YYYY format; daily entry mandatory
Basic identification
C2Building / Floor / Room / Area
Acceptance: Clear identification of painting location
Location tracking
C3Area Painted (m²)
Acceptance: Area calculated; cumulative total in register
Quantity tracking
C4Paint Type / Color
Acceptance: Product name, batch number, color code
Material identification
C5Layer (Primer/Undercoat/Finish)
Acceptance: Primer, undercoat, or finish coat clearly identified
Application stage
C6Material Quantity Used (liters)
Acceptance: Quantity measured; consumption rate verified
Consumption tracking
C7Consumption Rate (m²/liter)
Acceptance: Typical 8-15 m²/liter; within spec ±10%
Application control
C8Temperature (Air/Substrate)
Acceptance: Ambient 10-35°C; substrate >10°C; recorded
Environmental record
C9Humidity (%)
Acceptance: <80% relative humidity; hygrometer reading
Environmental record
C10Weather Condition
Acceptance: Clear, Cloudy, Drizzle, Rain; work interruptions noted
Environmental record
C11DFT Test Result (microns)
Acceptance: DFT measured; result logged; within spec OK; outside spec noted
Quality check
C12Adhesion Test Result
Acceptance: PASS/FAIL; rating if tested; defects noted
Quality check
C13Visual Quality Assessment
Acceptance: OK/Defects Noted; defect %age; touch-up required if >5%
Quality check
C14Defects / Issues Noted
Acceptance: Drips, bare spots, color variation; NCR if major
Documentation
C15Remarks / QC Notes
Acceptance: Weather impacts; contractor performance; schedule notes
General notes
C16QC Engineer Sign & Date
Acceptance: Daily sign-off; dated; contractor countersigned
Authorization
B. CUMULATIVE SUMMARY ROWS
S1Total Area Painted (m²) — Weekly and Monthly
Acceptance: Cumulative sum; compared against schedule
Progress tracking
S2Total Material Used (liters) — Weekly and Monthly
Acceptance: Cumulative usage; verified against area × rate
Material consumption
S3Tests Conducted / Passed — Period summary
Acceptance: DFT tests, adhesion tests, visual inspections; pass rate calculated
QA tracking
A. DAILY PAINTING RECORD COLUMNS
C1Date
Basic identification (IS 2395)
DD/MM/YYYY format; daily entry mandatory
C2Building / Floor / Room / Area
Location tracking (IS 2395)
Clear identification of painting location
C3Area Painted (m²)
Quantity tracking (IS 2395)
Area calculated; cumulative total in register
C4Paint Type / Color
Material identification (IS 2395)
Product name, batch number, color code
C5Layer (Primer/Undercoat/Finish)
Application stage (IS 2395)
Primer, undercoat, or finish coat clearly identified
C6Material Quantity Used (liters)
Consumption tracking (IS 2395)
Quantity measured; consumption rate verified
C7Consumption Rate (m²/liter)
Application control (IS 2395)
Typical 8-15 m²/liter; within spec ±10%
C8Temperature (Air/Substrate)
Environmental record (IS 2395)
Ambient 10-35°C; substrate >10°C; recorded
C9Humidity (%)
Environmental record (IS 2395)
<80% relative humidity; hygrometer reading
C10Weather Condition
Environmental record (IS 2395)
Clear, Cloudy, Drizzle, Rain; work interruptions noted
C11DFT Test Result (microns)
Quality check (IS 2395)
DFT measured; result logged; within spec OK; outside spec noted
C12Adhesion Test Result
Quality check (IS 2395)
PASS/FAIL; rating if tested; defects noted
C13Visual Quality Assessment
Quality check (IS 2395)
OK/Defects Noted; defect %age; touch-up required if >5%
C14Defects / Issues Noted
Documentation (IS 2395)
Drips, bare spots, color variation; NCR if major
C15Remarks / QC Notes
General notes (IS 2395)
Weather impacts; contractor performance; schedule notes
C16QC Engineer Sign & Date
Authorization (IS 2395)
Daily sign-off; dated; contractor countersigned
B. CUMULATIVE SUMMARY ROWS
S1Total Area Painted (m²) — Weekly and Monthly
Progress tracking (IS 2395)
Cumulative sum; compared against schedule
S2Total Material Used (liters) — Weekly and Monthly
Material consumption (IS 2395)
Cumulative usage; verified against area × rate
S3Tests Conducted / Passed — Period summary
QA tracking (IS 2395)
DFT tests, adhesion tests, visual inspections; pass rate calculated
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
HOLD FOR REVIEW
Weekly Review By
Name / Sign / Date
Monthly Approval By
Name / Sign / Date