| A. HOLD POINTS (Work Cannot Proceed Without QC Approval) |
| A1 | PRE-INSTALLATION SITE INSPECTION | | |
| A2 | MATERIAL AND EQUIPMENT VERIFICATION | | |
| A3 | PIPE INSTALLATION COMPLETION AND VISUAL INSPECTION | | |
| A4 | SYSTEM FLUSHING COMPLETION (Hydrant/Sprinkler) | | |
| A5 | FIRE DOOR AND FRAME INSTALLATION INSPECTION | | |
| A6 | SPRINKLER HEAD INSTALLATION VERIFICATION | | |
| A7 | FIRE ALARM DETECTOR INSTALLATION AND ADDRESSING (Addressable Systems) | | |
| A8 | PENETRATION SEALING AND FIRE STOPS INSTALLATION | | |
| B. WITNESS POINTS (QC to Observe and Document) |
| B1 | HYDROSTATIC PRESSURE TEST | | |
| B2 | SYSTEM FLOW TEST AND PRESSURE MEASUREMENT AT REMOTE OUTLETS | | |
| B3 | SMOKE DETECTOR RESPONSE TEST (Sample Detectors) | | |
| B4 | ALARM DEVICE FUNCTIONALITY TEST | | |
| B5 | FIRE DOOR OPERATION AND CLOSING TEST | | |
| C. INSPECTION SCHEDULE AND PHASE-WISE ACTIVITIES |
| C1 | | | |
| C2 | | | |
| C3 | | | |
| C4 | | | |