QA/QC  › Bridges  › Bridge Construction Register
Register · QC-BRG-REG-001
Bridge Construction Register
23 checkpoints across 1 sections. Ongoing project record; updated monthly or per milestone
23 Checkpoints
1 Sections
Monthly updates; final consolidation at project completion
Project Manager, QC Coordinator

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. BRIDGE REGISTER MATRIX
A1S.No. / Bridge ID
Acceptance: Sequential numbering; alphanumeric bridge ID; unique per structure
Unique identification
OK
NC
NA
HOLD
A2Bridge Type (RCC / Composite / Steel / Arch)
Acceptance: Type clearly identified; construction method documented
Structural classification
OK
NC
NA
HOLD
A3Location / Chainage
Acceptance: GPS coordinates or chainage noted; location verified on drawings
Geographic identification
OK
NC
NA
HOLD
A4Span Configuration (L1 × L2 × ...)
Acceptance: Span lengths in meters; number of spans documented
Structural geometry
OK
NC
NA
HOLD
A5Total Deck Length (m)
Acceptance: Total length calculated; matches design
Length verification
OK
NC
NA
HOLD
A6Deck Width (m)
Acceptance: Width documented; includes traffic lanes, shoulders, footpath
Width specification
OK
NC
NA
HOLD
A7Design Load Class (IRC Class)
Acceptance: Load class per IRC standards; design vehicle specified
Load classification
OK
NC
NA
HOLD
A8Foundation Type (Pile / Caisson / Footing)
Acceptance: Type identified; number of piles/caissons documented
Foundation classification
OK
NC
NA
HOLD
A9Design Consultant / Authority
Acceptance: Consultant name and stamp; approval authority documented
Design responsibility
OK
NC
NA
HOLD
A10Construction Start Date
Acceptance: Date recorded; mobilization documented
Schedule tracking
OK
NC
NA
HOLD
A11Foundation Completion Date
Acceptance: Foundation work complete; tested and approved
Milestone
OK
NC
NA
HOLD
A12Superstructure Completion Date
Acceptance: Deck concreting complete; cured and tested
Milestone
OK
NC
NA
HOLD
A13Final Testing and Commissioning Date
Acceptance: All tests completed; bridge approved for traffic
Acceptance date
OK
NC
NA
HOLD
A14Foundation QC Checklist (QC-BRG-CHK-001)
Acceptance: Report number; status approved; signed
Foundation approval
OK
NC
NA
HOLD
A15Substructure QC Checklist (QC-BRG-CHK-002)
Acceptance: Report number; status approved; signed
Substructure approval
OK
NC
NA
HOLD
A16Superstructure QC Checklist (QC-BRG-CHK-003)
Acceptance: Report number; status approved; signed
Superstructure approval
OK
NC
NA
HOLD
A17Bearing & Joint Checklist (QC-BRG-CHK-004)
Acceptance: Report number; status approved; signed
Bearing approval
OK
NC
NA
HOLD
A18Proof Load Test Report (QC-BRG-TST-001)
Acceptance: Report number; test passed/conditional; signed
Load test approval
OK
NC
NA
HOLD
A19Deflection Test Report (QC-BRG-TST-002)
Acceptance: Report number; deflection within limits; signed
Deflection approval
OK
NC
NA
HOLD
A20Bearing Test Report (QC-BRG-TST-003)
Acceptance: Report number; bearing functional; signed
Bearing test approval
OK
NC
NA
HOLD
A21Overall Construction Status
Acceptance: Status: Design / Tendering / Procurement / Foundation / Superstructure / Testing / Handover / Complete
Current phase
OK
NC
NA
HOLD
A22Outstanding Defects / Snagging
Acceptance: Blank if none; list items if any; remediation plan attached
Issue tracking
OK
NC
NA
HOLD
A23Handover Status and Date
Acceptance: Handed over to client; signed receipt; operations commenced
Final acceptance
OK
NC
NA
HOLD
A. BRIDGE REGISTER MATRIX
A1S.No. / Bridge ID
Unique identification (IRC 6)
Sequential numbering; alphanumeric bridge ID; unique per structure
OKNCNAHOLD
A2Bridge Type (RCC / Composite / Steel / Arch)
Structural classification (IRC 6)
Type clearly identified; construction method documented
OKNCNAHOLD
A3Location / Chainage
Geographic identification (IRC 6)
GPS coordinates or chainage noted; location verified on drawings
OKNCNAHOLD
A4Span Configuration (L1 × L2 × ...)
Structural geometry (IRC 6)
Span lengths in meters; number of spans documented
OKNCNAHOLD
A5Total Deck Length (m)
Length verification (IRC 6)
Total length calculated; matches design
OKNCNAHOLD
A6Deck Width (m)
Width specification (IRC 6)
Width documented; includes traffic lanes, shoulders, footpath
OKNCNAHOLD
A7Design Load Class (IRC Class)
Load classification (IRC 6)
Load class per IRC standards; design vehicle specified
OKNCNAHOLD
A8Foundation Type (Pile / Caisson / Footing)
Foundation classification (IRC 6)
Type identified; number of piles/caissons documented
OKNCNAHOLD
A9Design Consultant / Authority
Design responsibility (IRC 6)
Consultant name and stamp; approval authority documented
OKNCNAHOLD
A10Construction Start Date
Schedule tracking (IRC 6)
Date recorded; mobilization documented
OKNCNAHOLD
A11Foundation Completion Date
Milestone (IRC 6)
Foundation work complete; tested and approved
OKNCNAHOLD
A12Superstructure Completion Date
Milestone (IRC 6)
Deck concreting complete; cured and tested
OKNCNAHOLD
A13Final Testing and Commissioning Date
Acceptance date (IRC 6)
All tests completed; bridge approved for traffic
OKNCNAHOLD
A14Foundation QC Checklist (QC-BRG-CHK-001)
Foundation approval (IRC 6)
Report number; status approved; signed
OKNCNAHOLD
A15Substructure QC Checklist (QC-BRG-CHK-002)
Substructure approval (IRC 6)
Report number; status approved; signed
OKNCNAHOLD
A16Superstructure QC Checklist (QC-BRG-CHK-003)
Superstructure approval (IRC 6)
Report number; status approved; signed
OKNCNAHOLD
A17Bearing & Joint Checklist (QC-BRG-CHK-004)
Bearing approval (IRC 6)
Report number; status approved; signed
OKNCNAHOLD
A18Proof Load Test Report (QC-BRG-TST-001)
Load test approval (IRC 6)
Report number; test passed/conditional; signed
OKNCNAHOLD
A19Deflection Test Report (QC-BRG-TST-002)
Deflection approval (IRC 6)
Report number; deflection within limits; signed
OKNCNAHOLD
A20Bearing Test Report (QC-BRG-TST-003)
Bearing test approval (IRC 6)
Report number; bearing functional; signed
OKNCNAHOLD
A21Overall Construction Status
Current phase (IRC 6)
Status: Design / Tendering / Procurement / Foundation / Superstructure / Testing / Handover / Complete
OKNCNAHOLD
A22Outstanding Defects / Snagging
Issue tracking (IRC 6)
Blank if none; list items if any; remediation plan attached
OKNCNAHOLD
A23Handover Status and Date
Final acceptance (IRC 6)
Handed over to client; signed receipt; operations commenced
OKNCNAHOLD
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED
Register Summary
Name / Sign / Date
Overall Project Status
Name / Sign / Date
Outstanding Actions
Name / Sign / Date
Completion Percentage (%)
Name / Sign / Date
Prepared By
Name / Sign / Date
Reviewed By
Name / Sign / Date