S.No.CheckpointIS RequirementStatus
A. ELASTOMER BEARING PHYSICAL TESTS
A1Elastomer hardness measurement
Acceptance: Durometer hardness 50–70 Shore A; measured at multiple points on bearing
Cl. 8.4 — Elastomer properties verified
OK
NC
NA
HOLD
A2Visual inspection for defects
Acceptance: No cracks, tears, or delamination; surface clean; no staining or contamination
Cl. 8.4 — No cracks or damage
OK
NC
NA
HOLD
A3Elastomer thickness and dimensions
Acceptance: Thickness measured at 4 corners; within ±5 mm of design; uniform distribution
Cl. 8.4 — Dimensions per design
OK
NC
NA
HOLD
A4Steel plate bonding quality
Acceptance: Steel plates bonded to elastomer; no separation or bubbles; edges sealed
Cl. 8.4 — Plates well bonded
OK
NC
NA
HOLD
B. BEARING COMPRESSION AND SHEAR TEST
B1Vertical load application and compression
Acceptance: Applied load = design load; compression measured; compression modulus within ±10% of design
Cl. 8.4 — Bearing compression behavior
OK
NC
NA
HOLD
B2Lateral (shear) displacement test
Acceptance: Lateral displacement ≤ 10% under design shear; recovery immediate; no creep
Cl. 8.4 — Shear stiffness verified
OK
NC
NA
HOLD
B3Rotation capability test
Acceptance: Rotation ≤ design rotation angle; no cracking; elastic recovery complete
Cl. 8.4 — Bearing accommodates rotation
OK
NC
NA
HOLD
C. POT BEARING SPECIFIC TESTS
C1Piston seal and sliding surface condition
Acceptance: Seal undamaged; surface smooth and free of corrosion; no leakage
Cl. 8.4 — Seal intact and sliding surface clean
OK
NC
NA
HOLD
C2Pot bearing load transmission
Acceptance: Vertical load ≤ design capacity; no permanent deformation; piston moves freely
Cl. 8.4 — Load transferred smoothly
OK
NC
NA
HOLD
C3Lateral movement and friction
Acceptance: Lateral movement smooth; friction force within design; no sticking or jerking
Cl. 8.4 — Lateral movement controlled
OK
NC
NA
HOLD
Showing 10 of 18 checkpoints ·
A. ELASTOMER BEARING PHYSICAL TESTS
A1Elastomer hardness measurement
Cl. 8.4 — Elastomer properties verified (IRC 6)
Durometer hardness 50–70 Shore A; measured at multiple points on bearing
OKNCNAHOLD
A2Visual inspection for defects
Cl. 8.4 — No cracks or damage (IRC 6)
No cracks, tears, or delamination; surface clean; no staining or contamination
OKNCNAHOLD
A3Elastomer thickness and dimensions
Cl. 8.4 — Dimensions per design (IRC 6)
Thickness measured at 4 corners; within ±5 mm of design; uniform distribution
OKNCNAHOLD
A4Steel plate bonding quality
Cl. 8.4 — Plates well bonded (IRC 6)
Steel plates bonded to elastomer; no separation or bubbles; edges sealed
OKNCNAHOLD
B. BEARING COMPRESSION AND SHEAR TEST
B1Vertical load application and compression
Cl. 8.4 — Bearing compression behavior (IRC 6)
Applied load = design load; compression measured; compression modulus within ±10% of design
OKNCNAHOLD
B2Lateral (shear) displacement test
Cl. 8.4 — Shear stiffness verified (IRC 6)
Lateral displacement ≤ 10% under design shear; recovery immediate; no creep
OKNCNAHOLD
B3Rotation capability test
Cl. 8.4 — Bearing accommodates rotation (IRC 6)
Rotation ≤ design rotation angle; no cracking; elastic recovery complete
OKNCNAHOLD
C. POT BEARING SPECIFIC TESTS
C1Piston seal and sliding surface condition
Cl. 8.4 — Seal intact and sliding surface clean (IRC 6)
Seal undamaged; surface smooth and free of corrosion; no leakage
OKNCNAHOLD
C2Pot bearing load transmission
Cl. 8.4 — Load transferred smoothly (IRC 6)
Vertical load ≤ design capacity; no permanent deformation; piston moves freely
OKNCNAHOLD
C3Lateral movement and friction
Cl. 8.4 — Lateral movement controlled (IRC 6)
Lateral movement smooth; friction force within design; no sticking or jerking
OKNCNAHOLD
Showing 10 of 18 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED
Bearing Test Summary
Name / Sign / Date
Key Measurements and Results
Name / Sign / Date
Issues or Observations
Name / Sign / Date
Conclusion
Name / Sign / Date
Tested By
Name / Sign / Date
Reviewed By
Name / Sign / Date