๐ When to use this template
- Before starting any new or high-risk activity for the day.
- Daily at the beginning of each shift, or as required for a specific task.
- Filled by the Site Engineer, Safety Officer, or Supervisor conducting the talk.
Sections & fields
Preview of the template structure. Download Excel to fill on site.
1Header Information6 fields
Project Name
_____________
Contract / Package No.
_____________
TBT Record No.
_____________
Location of Work / Grid Line
_____________
Shift (Day/Night)
_____________
2TBT Details7 fields
Specific Activity to be Performed
_____________
Conducted By (Name & Designation)
_____________
Language(s) Used
_____________
Total Duration (Minutes)
_____________
3Hazards & Controls Discussed5 fields
Relevant SWMS / HIRA Ref. No.
_____________
Hazards Identified (e.g., Fall from height, Electrical shock, Trench collapse, Material handling)
_____________
Control Measures Discussed (e.g., Use of full-body harness, LOTO procedure, Proper shoring, Safe lifting techniques)
_____________
Mandatory PPE for the Task
_____________
Emergency Procedures Reviewed (e.g., Assembly point, First aid location, Emergency contact no.)
_____________
4Attendee List6 fields
Workman Name
_____________
Trade (e.g., Mason, Carpenter, Rigger, Helper)
_____________
Contractor / Sub-contractor Name
_____________
Signature / Thumb Impression
_____________
5Feedback & Observations4 fields
Questions Raised by Workmen
_____________
Clarifications Provided by Supervisor
_____________
Unsafe Conditions Reported by Workmen (if any)
_____________
Action Taken on Reported Conditions
_____________
6Verification & Closure5 fields
Photographs of TBT (Yes/No)
_____________
Remarks / Further Actions
_____________
Prepared By (Supervisor/Engineer Signature)
_____________
Reviewed By (Safety Officer Signature)
_____________
Client / PMC Representative (if present)
_____________
๐ก Sample filled excerpt
TBT Topic: Manual Excavation for Foundation F-12
Hazards Discussed: Trench collapse, hitting underground utilities, snake bites.
Controls: Sloping/benching of sides (1:1), use of spade/pickaxe only (no JCB), clearing surrounding bushes, availability of first aid kit with anti-venom.
โ Compliance notes
- Fulfills requirements under the BOCW Act, 1996 (Section 40) and BOCW Central Rules, 1998 (Rule 40) regarding providing information to building workers about safety.
- Serves as crucial evidence of safety communication during statutory audits by Labour Department or internal/client safety audits.
- A primary document to demonstrate 'duty of care' by the employer in case of an accident or incident investigation.
- Mandatory requirement for most ISO 45001 (OH&S Management Systems) certified projects.