Form · FMT-STR-001
GRN (Goods Received Note)
13 fields across 4 sections. Filled on every material receipt — basis for supplier bill processing + stock entry.
13 Fields
4 Sections
Per delivery
Storekeeper, QC Engineer

Format Preview

S.No.Field / CheckpointReferenceStatus
A. RECEIPT DETAILS
A1GRN no. (sequential) + date + time of receipt
Acceptance: Pre-numbered book
Unique number, daily series
OK
NC
NA
A2PO / Indent reference + supplier name
Acceptance: PO no. cross-referenced
Linked to purchase order
OK
NC
NA
A3Invoice / delivery challan no. + date
Acceptance: Attached to GRN
Original challan with material
OK
NC
NA
A4Vehicle no. + driver name
Acceptance: Logged
For RMC / bulk materials
OK
NC
NA
B. MATERIAL DETAILS
B1Item description (per PO) + brand / make + grade
Acceptance: Brand-MAKE match
Match PO specification
OK
NC
NA
B2Quantity received (units) + unit
Acceptance: Counted / weighed / volumetric
Physical verification
OK
NC
NA
B3Quantity in PO + balance to deliver
Acceptance: PO progress
Cumulative tracking
OK
NC
NA
C. QUALITY CHECK
C1Visual inspection — damage / discrepancy / shortages
Acceptance: Photo of issue if any
ISO 9001 receiving inspection
OK
NC
NA
C2MTC / test certificate received (cement, steel, etc.)
Acceptance: Filed with GRN
Per spec
OK
NC
NA
C3Sample taken for lab test (if required)
Acceptance: Sample ID linked
Per QC plan
OK
NC
NA
C4Accept / Reject / Conditional acceptance
Acceptance: Signed by QC
QC decision
OK
NC
NA
Showing 11 of 13 fields ·
A. RECEIPT DETAILS
A1GRN no. (sequential) + date + time of receipt
Unique number, daily series
Pre-numbered book
OKNCNA
A2PO / Indent reference + supplier name
Linked to purchase order
PO no. cross-referenced
OKNCNA
A3Invoice / delivery challan no. + date
Original challan with material
Attached to GRN
OKNCNA
A4Vehicle no. + driver name
For RMC / bulk materials
Logged
OKNCNA
B. MATERIAL DETAILS
B1Item description (per PO) + brand / make + grade
Match PO specification
Brand-MAKE match
OKNCNA
B2Quantity received (units) + unit
Physical verification
Counted / weighed / volumetric
OKNCNA
B3Quantity in PO + balance to deliver
Cumulative tracking
PO progress
OKNCNA
C. QUALITY CHECK
C1Visual inspection — damage / discrepancy / shortages
ISO 9001 receiving inspection
Photo of issue if any
OKNCNA
C2MTC / test certificate received (cement, steel, etc.)
Per spec
Filed with GRN
OKNCNA
C3Sample taken for lab test (if required)
Per QC plan
Sample ID linked
OKNCNA
C4Accept / Reject / Conditional acceptance
QC decision
Signed by QC
OKNCNA
Showing 11 of 13 ·
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date