SSR — State Schedule of Rates (PWD)
State Schedule of Rates (PWD)
Also calledssrssr full formwhat is ssrssr meaningstate schedule of rates (pwd)
Definition
Each State PWD publishes its own SSR — Maharashtra SSR, Karnataka SSR, Gujarat SSR, etc. Used for state-funded construction work. Distinct from DSR (Central PWD) and BSR (Basic / pre-tax pre-overheads).
Frequently asked
What is the full form of SSR?
SSR = State Schedule of Rates (PWD). Each State PWD publishes its own SSR — Maharashtra SSR, Karnataka SSR, Gujarat SSR, etc.
Related estimation terms
Construction Cost Estimation
Per sqft cost ₹1500-3500 in India
Quantity Estimation
Estimate cement, steel, sand, aggregate for given area
Material Wastage Factors
Cement 2-3%, steel 3-5%, tiles 5-10% typical
Bill of Quantities (BOQ)
Itemised list of work activities with quantities and unit rates — forms the priced contract document.
Rate Analysis
Computation of unit rate from material + labour + plant + overhead + profit. Reference: DSR, state SOR, in-house DB.
Abstract Estimate
Cost estimate at concept stage based on plinth area or per-bed/per-room rates. ±20% accuracy.
Detailed Estimate
Quantity-based estimate from drawings. Each work item × unit rate × quantity = cost. ±5% accuracy.
Contingency
Provision for unforeseen costs. CPWD: 3%. Private: 5-10%. Higher for renovation than new build.