Schedule of Rates · CMRL

CMRL Schedule of Rates

Authority:CMRL (50:50 GoI-Tamil Nadu JV)Region:Tamil NaduDocuments:1
1 latest edition — direct from official sources, free
CMRL Civil Tender NITs (Phase 2)
No standalone SOR — per-tender BoQs from TN PWD + CPWD baselines
railway civilVerified↓ Download
Official portal: https://chennaimetrorail.org/nit-project/civil/
Chennai Metro Rail Limited (CMRL) builds and operates the Chennai Metro. It does not publish a standalone consolidated Schedule of Rates — civil-works rates derive from TN PWD + CPWD baselines applied within project-specific BoQs published per tender NIT. Phase-2 active NITs cover viaducts, underground stations, and depot civil.

About Chennai Metro Rail Limited

CMRL is the implementing agency for Chennai Metro Phase 1 (commissioned 2015-19) and the ongoing Phase 2 (118 km, 128 stations, target completion 2027-28). Phase 2 represents one of India's largest metro construction programmes with civil works across underground tunnels (TBM), elevated viaducts, station structures, depot civil and allied works. CMRL doesn't publish a standalone SOR — each tender package publishes its own BoQ derived from TN PWD/Highways SOR + CPWD DSR (current edition) + project-specific items unique to metro construction (TBM mucking civil, station box construction, elevated track-bed). The /nit-project/civil/ page on chennaimetrorail.org indexes active and recent NITs with full BoQ details. Reference DMRC's published Outline Construction Specification for the technical envelope.

Frequently Asked Questions

Does CMRL publish a Schedule of Rates?

No standalone SOR. Civil-works rates derive from TN PWD/Highways and CPWD DSR baselines plus project-specific items unique to metro construction. Each tender NIT publishes its own complete BoQ.

What technical specifications does CMRL use?

CMRL adopts DMRC's Outline Construction Specification (Phase IV revisions) as the technical envelope, with Chennai-specific modifications for soil conditions, seismic zone (II), and coastal proximity considerations.

Where do I find current CMRL tender BoQs?

chennaimetrorail.org/nit-project/civil/ indexes active NITs. Each NIT carries the full project BoQ during the bid window. Recent Phase 2 packages: TDR-65 (depot civil), TDR-50 (Corridor 3 viaduct), and underground station packages.

How do CMRL rates compare to DMRC rates?

Generally similar magnitude. Chennai's coastal seismic conditions and ground-water table push some structural items higher; lower mason wages keep some labour items below Delhi. Net difference: ~5-10% across packages.

Are TN PWD rates the fallback?

Yes — for general civil items not specifically defined in CMRL's project BoQ, TN PWD/Highways SOR + CPWD DSR are the fallback rate references.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.
Page last reviewed: 29 April 2026.