QA/QC  › Aggregates & Sand  › Aggregate Quality Inspection
Plan · QC-AGG-PLN-001
Aggregate Quality Inspection & Test Plan (ITP)
26 checkpoints across 10 sections. At project inception; before aggregate procurement; reviewed with all stakeholders
26 Checkpoints
10 Sections
Once per project; updated if procedures change
QC Manager, Site Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. ACTIVITY 1: AGGREGATE SOURCE QUALIFICATION
A1Identify and pre-qualify aggregate sources; obtain preliminary samples for testing
Acceptance: Sources verified for capacity; samples tested; results documented; quality acceptable
Cl. 3 — Quality standards
OK
NC
NA
HOLD
A2HOLD POINT: Source approval sign-off by QC Manager; confirm suitability for project
Acceptance: QC Manager written approval; sources meet specifications; supply chain confirmed
Cl. 3 — Quality assurance
OK
NC
NA
HOLD
B. ACTIVITY 2: AGGREGATE RECEIVING & INSPECTION
B1Schedule aggregate deliveries; prepare QC team and receiving infrastructure
Acceptance: Deliveries coordinated; QC checklist ready; receiving area prepared; team scheduled
Cl. 9 — Planning
OK
NC
NA
HOLD
B2Complete QC-AGG-CHK-001 receiving inspection: documentation, physical condition, quantity verification
Acceptance: Checklist fully completed; all items checked; no NC items preventing receipt
Cl. 9 — Inspection
OK
NC
NA
HOLD
B3HOLD POINT: Receiving inspection approval by QC engineer before unloading/temporary storage
Acceptance: QC engineer approval issued; preliminary acceptance documented; conditions noted if any
Cl. 9 — Inspection approval
OK
NC
NA
HOLD
C. ACTIVITY 3: SAMPLE COLLECTION & LAB SUBMISSION
C1Collect representative samples per IS 2386: minimum 100kg composite from multiple locations
Acceptance: 3-5 samples from different heap locations; sealed containers; labeled completely
Cl. 9.1 — Sampling method
OK
NC
NA
HOLD
C2Submit samples to approved testing lab within 48 hours with documentation
Acceptance: Lab receipt confirmed; submission documented; reference number obtained
Cl. 9.1 — Lab submission
OK
NC
NA
HOLD
Showing 7 of 26 checkpoints ·
A. ACTIVITY 1: AGGREGATE SOURCE QUALIFICATION
A1Identify and pre-qualify aggregate sources; obtain preliminary samples for testing
Cl. 3 — Quality standards (IS 383)
Sources verified for capacity; samples tested; results documented; quality acceptable
OKNCNAHOLD
A2HOLD POINT: Source approval sign-off by QC Manager; confirm suitability for project
Cl. 3 — Quality assurance (IS 383)
QC Manager written approval; sources meet specifications; supply chain confirmed
OKNCNAHOLD
B. ACTIVITY 2: AGGREGATE RECEIVING & INSPECTION
B1Schedule aggregate deliveries; prepare QC team and receiving infrastructure
Cl. 9 — Planning (IS 383)
Deliveries coordinated; QC checklist ready; receiving area prepared; team scheduled
OKNCNAHOLD
B2Complete QC-AGG-CHK-001 receiving inspection: documentation, physical condition, quantity verification
Cl. 9 — Inspection (IS 383)
Checklist fully completed; all items checked; no NC items preventing receipt
OKNCNAHOLD
B3HOLD POINT: Receiving inspection approval by QC engineer before unloading/temporary storage
Cl. 9 — Inspection approval (IS 383)
QC engineer approval issued; preliminary acceptance documented; conditions noted if any
OKNCNAHOLD
C. ACTIVITY 3: SAMPLE COLLECTION & LAB SUBMISSION
C1Collect representative samples per IS 2386: minimum 100kg composite from multiple locations
Cl. 9.1 — Sampling method (IS 383)
3-5 samples from different heap locations; sealed containers; labeled completely
OKNCNAHOLD
C2Submit samples to approved testing lab within 48 hours with documentation
Cl. 9.1 — Lab submission (IS 383)
Lab receipt confirmed; submission documented; reference number obtained
OKNCNAHOLD
Showing 7 of 26 ·
Inspection Sign-Off
ITP APPROVED
ITP APPROVED WITH CONDITIONS
ITP REQUIRES REVISION
ITP Prepared By
Name / Sign / Date
Approved By (QC Manager)
Name / Sign / Date
Reviewed By (Site Engineer)
Name / Sign / Date