Formats  › RERA & Real Estate  › Quarterly Progress Report
Register · FMT-RER-001
Quarterly Progress Report (QPR) — RERA
14 fields across 4 sections. Mandatory quarterly filing on state RERA portal — every promoter, every project.
14 Fields
4 Sections
Quarterly (Mar/Jun/Sep/Dec)
Promoter, Project Manager

Format Preview

S.No.Field / CheckpointReferenceStatus
A. PROJECT BASICS
A1RERA registration no. + project name + promoter
Acceptance: Per certificate
Per RERA registration
OK
NC
NA
A2Quarter ending (Mar / Jun / Sep / Dec)
Acceptance: Standard quarter
Per RERA Sec 11(1)(d)
OK
NC
NA
A3Total area + total no. of units + units sold + booked / unsold
Acceptance: Logged
Per project data
OK
NC
NA
B. PHYSICAL PROGRESS
B1% physical progress per tower / phase
Acceptance: Per ME / Engineer
Photographic + measurement
OK
NC
NA
B2Activities completed this quarter (excavation / structure / finishes / MEP)
Acceptance: Quantified
Per WBS
OK
NC
NA
B3Photos — site + 4 cardinal directions + close-ups
Acceptance: Uploaded
Per RERA portal format
OK
NC
NA
B4Cumulative % vs original timeline
Acceptance: Computed
Variance analysis
OK
NC
NA
C. FINANCIAL PROGRESS
C1Amount received from allottees (cumulative)
Acceptance: Bank-reconciled
Per ledger
OK
NC
NA
C2Amount deposited to escrow (70% mandatory per Sec 4(2)(l)(D))
Acceptance: Bank statement
Mandatory
OK
NC
NA
C3Amount withdrawn from escrow (proportional to construction)
Acceptance: CA-certified
Per Sec 4(2)(l)(D)
OK
NC
NA
C4Construction cost incurred (cumulative)
Acceptance: Audit-trail
Per books
OK
NC
NA
Showing 11 of 14 fields ·
A. PROJECT BASICS
A1RERA registration no. + project name + promoter
Per RERA registration
Per certificate
OKNCNA
A2Quarter ending (Mar / Jun / Sep / Dec)
Per RERA Sec 11(1)(d)
Standard quarter
OKNCNA
A3Total area + total no. of units + units sold + booked / unsold
Per project data
Logged
OKNCNA
B. PHYSICAL PROGRESS
B1% physical progress per tower / phase
Photographic + measurement
Per ME / Engineer
OKNCNA
B2Activities completed this quarter (excavation / structure / finishes / MEP)
Per WBS
Quantified
OKNCNA
B3Photos — site + 4 cardinal directions + close-ups
Per RERA portal format
Uploaded
OKNCNA
B4Cumulative % vs original timeline
Variance analysis
Computed
OKNCNA
C. FINANCIAL PROGRESS
C1Amount received from allottees (cumulative)
Per ledger
Bank-reconciled
OKNCNA
C2Amount deposited to escrow (70% mandatory per Sec 4(2)(l)(D))
Mandatory
Bank statement
OKNCNA
C3Amount withdrawn from escrow (proportional to construction)
Per Sec 4(2)(l)(D)
CA-certified
OKNCNA
C4Construction cost incurred (cumulative)
Per books
Audit-trail
OKNCNA
Showing 11 of 14 ·
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date