S.No.Field / CheckpointReferenceStatus
A. INPUT QUANTITIES (per 1 m³ M25)
A1Cement (OPC 43) — 380 kg = 7.6 bags
Acceptance: Per design
Per IS 10262 mix design
OK
NC
NA
A2Sand — 0.43 m³
Acceptance: Per design
Zone II per IS 383
OK
NC
NA
A3Aggregate (20mm) — 0.83 m³
Acceptance: Per IS 383
Per design
OK
NC
NA
A4Admixture (plasticiser) — 0.6% of cement = 2.3 kg
Acceptance: Per supplier spec
Per mix design
OK
NC
NA
A5Water — 175 L (W/C 0.46)
Acceptance: Per workability
Per mix design
OK
NC
NA
A6Labour — Mason 0.20 day + Mazdoor 1.80 day
Acceptance: Productivity
Per CPWD
OK
NC
NA
A7Vibrator + mixer hire — per CPWD T&P
Acceptance: Per CPWD
Standard
OK
NC
NA
A8Sundries 2-3%
Acceptance: Per CPWD
Standard
OK
NC
NA
B. RATE COMPUTATION
B1Materials × current rate = material cost / m³
Acceptance: ≤ 30 days
Latest market
OK
NC
NA
B2Labour × rate = labour cost
Acceptance: Per SoR
Per state PWD / CPWD
OK
NC
NA
B3T&P + sundries
Acceptance: Computed
Standard
OK
NC
NA
B4Direct cost / m³
Acceptance: Computed
Sum
OK
NC
NA
C. OH + P + QUOTED RATE
C1Overheads + Profit + Quoted rate
Acceptance: BOQ rate
Per company
OK
NC
NA
A. INPUT QUANTITIES (per 1 m³ M25)
A1Cement (OPC 43) — 380 kg = 7.6 bags
Per IS 10262 mix design
Per design
OKNCNA
A2Sand — 0.43 m³
Zone II per IS 383
Per design
OKNCNA
A3Aggregate (20mm) — 0.83 m³
Per design
Per IS 383
OKNCNA
A4Admixture (plasticiser) — 0.6% of cement = 2.3 kg
Per mix design
Per supplier spec
OKNCNA
A5Water — 175 L (W/C 0.46)
Per mix design
Per workability
OKNCNA
A6Labour — Mason 0.20 day + Mazdoor 1.80 day
Per CPWD
Productivity
OKNCNA
A7Vibrator + mixer hire — per CPWD T&P
Standard
Per CPWD
OKNCNA
A8Sundries 2-3%
Standard
Per CPWD
OKNCNA
B. RATE COMPUTATION
B1Materials × current rate = material cost / m³
Latest market
≤ 30 days
OKNCNA
B2Labour × rate = labour cost
Per state PWD / CPWD
Per SoR
OKNCNA
B3T&P + sundries
Standard
Computed
OKNCNA
B4Direct cost / m³
Sum
Computed
OKNCNA
C. OH + P + QUOTED RATE
C1Overheads + Profit + Quoted rate
Per company
BOQ rate
OKNCNA
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign