Schedule of Rates · Patna Metro

Patna Metro Schedule of Rates

Authority:Government of Bihar / MoHUARegion:BiharDocuments:1
1 latest edition — direct from official sources, free
Patna Metro Rail Official Portal
Adopts DMRC SOR framework + CPWD DSR + Bihar RCD SOR (road restoration). DMRC is General Consultant.
metroVerified↓ Download
Official portal: https://pmrconline.in/
Patna Metro is being built with Delhi Metro Rail Corporation as General Consultant. PMRCL does not publish its own SOR — civil/structural rates follow DMRC's SOR framework + CPWD DSR, with Bihar RCD SOR cascading for road-restoration works around station boxes.

About Patna Metro Rail Corporation Limited (PMRCL)

Patna Metro Rail Corporation Ltd, set up by the Government of Bihar with DMRC as General Consultant, is delivering Patna's Phase-1 metro corridors. The cost basis follows DMRC's standard practice: DMRC adopted SOR + DSR (CPWD) for civil/E&M, with Bihar RCD SOR taking over for surface road reinstatement and approach civil works. Specialised metro items (rolling stock, signalling, telecom, PSDs) are tendered as global packages with rate analysis built into the bid.

Frequently Asked Questions

Does PMRCL publish its own SOR?

No. Civil and E&M follow DMRC's adopted SOR + CPWD DSR; surface restoration uses Bihar RCD SOR.

Who is the General Consultant?

Delhi Metro Rail Corporation (DMRC) — which seconds engineering, contracts and SOR practice from its experience on Delhi and other metros.

Where to find Patna Metro tenders?

pmrconline.in notifications and tenders sections.

How are signalling and telecom packages priced?

Global tenders with vendor-built rate analysis — not on a published SOR.

Is the DMRC SOR public?

DMRC's General Conditions of Contract and standard rate frameworks are public for reference but the actual SOR is contract-specific and published inside tender packets.

Other SOR publishers

Schedule of Rates (SOR) documents are public-domain government publications issued by central, state PWD/R&B/WRD and authority departments. InfraLens links directly to the issuing authority where verified — we do not host PDFs and we do not paywall public documents. Confirm rates with the issuing authority before use in tenders or contracts.
Page last reviewed: 29 April 2026.