S.No.CheckpointIS RequirementStatus
A. APPARATUS AND CALIBRATION
A1Sand pouring cylinder or core cutter apparatus per IS 2720 Part 28/29
Acceptance: SR: 165 mm dia cylinder + calibrating tray; CC: 100 mm dia × 127 mm long cutter, dolly, rammer
Cl. 3 — Apparatus
OK
NC
NA
HOLD
A2Sand replacement method — bulk density of sand determined prior to test
Acceptance: Calibrated standard sand (passing 1 mm, retained 600 µ); density check every 3 months
Cl. 4 — Sand calibration
OK
NC
NA
HOLD
A3Mass of sand to fill cone (below valve) determined — used in deduction
Acceptance: Cone mass of sand (W2) recorded from calibration tray
Cl. 4 — Cone correction
OK
NC
NA
HOLD
A4Balance used for mass measurements — accuracy ±1 g; verified current day
Acceptance: Balance certificate on file; daily zero check done and recorded
Cl. 3 — Balance
OK
NC
NA
HOLD
B. TEST PROCEDURE — SITE EXCAVATION AND SAMPLING
B1Test location prepared: surface levelled and cleaned; tray seated firmly
Acceptance: Surface plane; no loose material; tray centred at test point
Cl. 5 — Prep
OK
NC
NA
HOLD
B2Hole excavated through tray opening (SR method) or core cutter driven into soil (CC method)
Acceptance: SR: hole 100 mm deep min; CC: driven by rammer with dolly; full cutter in soil
Cl. 5 — Excavation
OK
NC
NA
HOLD
B3All excavated soil collected, weighed (W) — no loss of material
Acceptance: Excavated mass recorded to ±1 g; no spillage; moisture sample immediately sealed
Cl. 5 — Soil mass
OK
NC
NA
HOLD
C. VOLUME DETERMINATION
C1SR: hole filled with calibrated sand from cylinder; mass of sand in hole (W3) measured
Acceptance: Sand flows freely into hole; cylinder valve closed after fill; W3 = total – cone mass
Cl. 5 — Volume (SR)
OK
NC
NA
HOLD
C2SR: volume of hole V = W3 / bulk density of sand
Acceptance: Volume computed; consistent with approximate depth and area
Cl. 6 — Calculation
OK
NC
NA
HOLD
C3CC: volume is the internal volume of cutter (typically ~1000 cm³) — verified annually
Acceptance: Internal volume from cutter calibration record; trimmed flush with both ends
Cl. 5 — Volume (CC)
OK
NC
NA
HOLD
Showing 10 of 19 checkpoints ·
A. APPARATUS AND CALIBRATION
A1Sand pouring cylinder or core cutter apparatus per IS 2720 Part 28/29
Cl. 3 — Apparatus (IS 2720)
SR: 165 mm dia cylinder + calibrating tray; CC: 100 mm dia × 127 mm long cutter, dolly, rammer
OKNCNAHOLD
A2Sand replacement method — bulk density of sand determined prior to test
Cl. 4 — Sand calibration (IS 2720)
Calibrated standard sand (passing 1 mm, retained 600 µ); density check every 3 months
OKNCNAHOLD
A3Mass of sand to fill cone (below valve) determined — used in deduction
Cl. 4 — Cone correction (IS 2720)
Cone mass of sand (W2) recorded from calibration tray
OKNCNAHOLD
A4Balance used for mass measurements — accuracy ±1 g; verified current day
Cl. 3 — Balance (IS 2720)
Balance certificate on file; daily zero check done and recorded
OKNCNAHOLD
B. TEST PROCEDURE — SITE EXCAVATION AND SAMPLING
B1Test location prepared: surface levelled and cleaned; tray seated firmly
Cl. 5 — Prep (IS 2720)
Surface plane; no loose material; tray centred at test point
OKNCNAHOLD
B2Hole excavated through tray opening (SR method) or core cutter driven into soil (CC method)
Cl. 5 — Excavation (IS 2720)
SR: hole 100 mm deep min; CC: driven by rammer with dolly; full cutter in soil
OKNCNAHOLD
B3All excavated soil collected, weighed (W) — no loss of material
Cl. 5 — Soil mass (IS 2720)
Excavated mass recorded to ±1 g; no spillage; moisture sample immediately sealed
OKNCNAHOLD
C. VOLUME DETERMINATION
C1SR: hole filled with calibrated sand from cylinder; mass of sand in hole (W3) measured
Cl. 5 — Volume (SR) (IS 2720)
Sand flows freely into hole; cylinder valve closed after fill; W3 = total – cone mass
OKNCNAHOLD
C2SR: volume of hole V = W3 / bulk density of sand
Cl. 6 — Calculation (IS 2720)
Volume computed; consistent with approximate depth and area
OKNCNAHOLD
C3CC: volume is the internal volume of cutter (typically ~1000 cm³) — verified annually
Cl. 5 — Volume (CC) (IS 2720)
Internal volume from cutter calibration record; trimmed flush with both ends
OKNCNAHOLD
Showing 10 of 19 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — NCR RAISED
Remarks
Name / Sign / Date
Tested By
Name / Sign / Date
Reviewed / Approved By
Name / Sign / Date