S.No.CheckpointIS RequirementStatus
A. STORAGE FACILITY CONDITION
A1Storage building/warehouse structure intact with no leaks, cracks, or water seepage
Acceptance: Roof, walls, and floor free from leaks; no water stains or dampness; foundation sound
Cl. 8.2 — Storage conditions
OK
NC
NA
HOLD
A2Storage area adequately ventilated with cross-ventilation or mechanical ventilation
Acceptance: Vents/openings clear and unobstructed; air circulation adequate; no stagnant air pockets
Cl. 8.2 — Ventilation requirement
OK
NC
NA
HOLD
A3Storage floor level and properly drained; no water pooling or moisture accumulation
Acceptance: Floor well-maintained; slope for drainage; no puddles or wet areas; sump/drainage functional
Cl. 8.2 — Drainage and moisture control
OK
NC
NA
HOLD
A4Temperature control: ambient temperature maintained between 10-35°C (recorded)
Acceptance: Temperature monitoring device in place; readings within acceptable range; extreme heat/cold avoided
Cl. 8.2 — Storage temperature
OK
NC
NA
HOLD
A5Humidity control: relative humidity maintained below 80%
Acceptance: Hygrometer installed and functioning; RH reading <80%; dehumidification if needed
Cl. 8.2 — Humidity control
OK
NC
NA
HOLD
A6Storage facility free from chemical odors, pests, and vermin
Acceptance: No rodent droppings, insect activity, or nests; no chemical/industrial odors; pest control measures active
Cl. 8.2 — Contamination prevention
OK
NC
NA
HOLD
B. BAG STORAGE AND ORGANIZATION
B1Cement bags stacked properly with height not exceeding 8 bags (approximately 4 metres)
Acceptance: Maximum 8 bags high; proper support; no overloading; bags secured if stacked horizontally
Cl. 8.2 — Safe stacking height
OK
NC
NA
HOLD
B2Stacks arranged with adequate spacing for air circulation and inspection access
Acceptance: Minimum 1-metre spacing between stack rows; aisles clear and accessible; ventilation not blocked
Cl. 8.2 — Ventilation and access
OK
NC
NA
HOLD
B3Bags placed on wooden pallets or raised platforms (minimum 30 cm above floor)
Acceptance: Bags elevated on pallets; not in direct contact with floor; pallets in good condition
Cl. 8.2 — Moisture protection
OK
NC
NA
HOLD
B4Stacks supported on rigid framework; no leaning or unstable arrangements
Acceptance: All stacks vertical and plumb; no tilting; framework secure; no collapsing risk
Cl. 8.2 — Stack stability
OK
NC
NA
HOLD
B5Clear identification labels on cement stacks showing grade, batch number, and manufacturing date
Acceptance: Labels visible and legible; batch/lot segregation clear; FIFO (First-In-First-Out) system visible
Cl. 8.2 — Identification and traceability
OK
NC
NA
HOLD
B6Different cement grades segregated and stored in separate zones/areas
Acceptance: OPC, PPC, PSC stored separately; physical barriers or clear demarcation; no mixing risk
Cl. 8.2 — Grade segregation
OK
NC
NA
HOLD
C. BAG INTEGRITY AND DAMAGE ASSESSMENT
C1Random inspection of bags for tears, holes, or damage (minimum 2% of visible bags)
Acceptance: Damaged bags ≤1% of total stock; isolated damage acceptable if contents unaffected
Cl. 9 — Inspection for quality assurance
OK
NC
NA
HOLD
C2No cement leakage or loss from bags; powder not scattered on storage floor
Acceptance: Bags intact; no visible leakage trails; floor clean under stacks; spillage <0.5% of stock
Cl. 8.2 — Containment and prevention of loss
OK
NC
NA
HOLD
C3Cement color and appearance consistent and uniform across all stored batches
Acceptance: Light grey (OPC) or darker grey (PPC); no discoloration, dark spots, or pale patches indicating degradation
Cl. 5 — Physical appearance
OK
NC
NA
HOLD
C4No visible caking, lumping, or moisture damage to exposed bag surfaces
Acceptance: Powder remains free-flowing; no moisture-hardened surface; no swelling of bags
Cl. 5.1 — Fineness and consistency
OK
NC
NA
HOLD
Showing 16 of 29 checkpoints ·
A. STORAGE FACILITY CONDITION
A1Storage building/warehouse structure intact with no leaks, cracks, or water seepage
Cl. 8.2 — Storage conditions (IS 269)
Roof, walls, and floor free from leaks; no water stains or dampness; foundation sound
OKNCNAHOLD
A2Storage area adequately ventilated with cross-ventilation or mechanical ventilation
Cl. 8.2 — Ventilation requirement (IS 269)
Vents/openings clear and unobstructed; air circulation adequate; no stagnant air pockets
OKNCNAHOLD
A3Storage floor level and properly drained; no water pooling or moisture accumulation
Cl. 8.2 — Drainage and moisture control (IS 269)
Floor well-maintained; slope for drainage; no puddles or wet areas; sump/drainage functional
OKNCNAHOLD
A4Temperature control: ambient temperature maintained between 10-35°C (recorded)
Cl. 8.2 — Storage temperature (IS 269)
Temperature monitoring device in place; readings within acceptable range; extreme heat/cold avoided
OKNCNAHOLD
A5Humidity control: relative humidity maintained below 80%
Cl. 8.2 — Humidity control (IS 269)
Hygrometer installed and functioning; RH reading <80%; dehumidification if needed
OKNCNAHOLD
A6Storage facility free from chemical odors, pests, and vermin
Cl. 8.2 — Contamination prevention (IS 269)
No rodent droppings, insect activity, or nests; no chemical/industrial odors; pest control measures active
OKNCNAHOLD
B. BAG STORAGE AND ORGANIZATION
B1Cement bags stacked properly with height not exceeding 8 bags (approximately 4 metres)
Cl. 8.2 — Safe stacking height (IS 269)
Maximum 8 bags high; proper support; no overloading; bags secured if stacked horizontally
OKNCNAHOLD
B2Stacks arranged with adequate spacing for air circulation and inspection access
Cl. 8.2 — Ventilation and access (IS 269)
Minimum 1-metre spacing between stack rows; aisles clear and accessible; ventilation not blocked
OKNCNAHOLD
B3Bags placed on wooden pallets or raised platforms (minimum 30 cm above floor)
Cl. 8.2 — Moisture protection (IS 269)
Bags elevated on pallets; not in direct contact with floor; pallets in good condition
OKNCNAHOLD
B4Stacks supported on rigid framework; no leaning or unstable arrangements
Cl. 8.2 — Stack stability (IS 269)
All stacks vertical and plumb; no tilting; framework secure; no collapsing risk
OKNCNAHOLD
B5Clear identification labels on cement stacks showing grade, batch number, and manufacturing date
Cl. 8.2 — Identification and traceability (IS 269)
Labels visible and legible; batch/lot segregation clear; FIFO (First-In-First-Out) system visible
OKNCNAHOLD
B6Different cement grades segregated and stored in separate zones/areas
Cl. 8.2 — Grade segregation (IS 269)
OPC, PPC, PSC stored separately; physical barriers or clear demarcation; no mixing risk
OKNCNAHOLD
C. BAG INTEGRITY AND DAMAGE ASSESSMENT
C1Random inspection of bags for tears, holes, or damage (minimum 2% of visible bags)
Cl. 9 — Inspection for quality assurance (IS 269)
Damaged bags ≤1% of total stock; isolated damage acceptable if contents unaffected
OKNCNAHOLD
C2No cement leakage or loss from bags; powder not scattered on storage floor
Cl. 8.2 — Containment and prevention of loss (IS 269)
Bags intact; no visible leakage trails; floor clean under stacks; spillage <0.5% of stock
OKNCNAHOLD
C3Cement color and appearance consistent and uniform across all stored batches
Cl. 5 — Physical appearance (IS 269)
Light grey (OPC) or darker grey (PPC); no discoloration, dark spots, or pale patches indicating degradation
OKNCNAHOLD
C4No visible caking, lumping, or moisture damage to exposed bag surfaces
Cl. 5.1 — Fineness and consistency (IS 269)
Powder remains free-flowing; no moisture-hardened surface; no swelling of bags
OKNCNAHOLD
Showing 16 of 29 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED — CORRECTIVE ACTION REQUIRED
Remarks on Storage Condition
Name / Sign / Date
Corrective Actions Required (if any)
Name / Sign / Date
Inspected By
Name / Sign / Date
Reviewed By
Name / Sign / Date