Dholera Special Investment Region

Greenfield industrial smart city — Delhi-Mumbai Industrial Corridor (DMIC) flagship
📍 Dholera · Gujarat
₹52.0K
crore
COST
2030
16 yrs build
EXPECTED
Dholera
Gujarat
LOCATION

About

920 sq km greenfield industrial smart city in Gujarat — flagship of the Delhi-Mumbai Industrial Corridor, designed for 2 million population at full build-out, foundation infrastructure operational since 2024.
Also known asDholera SIRDholera Smart City

Dholera Special Investment Region (Dholera SIR) is one of the world's largest greenfield smart-city developments — a 920 sq km integrated industrial city under construction in Gujarat's Bhavnagar district, ~100 km southwest of Ahmedabad. Designed as the flagship of the Delhi-Mumbai Industrial Corridor (DMIC) — a Japan-India bilateral $90 billion initiative — Dholera is targeted for 2 million population and 800,000 jobs at full build-out by 2040.

The project is executed by Dholera Industrial City Development Limited (DICDL), a 51:49 joint venture between Gujarat Industrial Development Corporation (GIDC) and the Delhi-Mumbai Industrial Corridor Development Corporation (DMICDC). Phase 1 (153 sq km) was sanctioned in 2014 at ₹52,000 crore and is being delivered in 4 sub-phases through 2030.

Foundation infrastructure operational as of 2024 includes: 70 km of arterial road network (4-6 lanes), 80 km of trunk water + sewerage + power distribution lines, two 220 kV power substations, a 2,000 cusec / day desalination plant (currently under commissioning), and 60 sq km of fully serviced industrial plots ready for tenant move-in.

Major anchor tenants attracted to Phase 1 include: Tata Electronics' semiconductor fabrication plant (₹91,000 crore investment, sanctioned 2024 — India's first major chip-fab), Vedanta-Foxconn EV battery plant (under negotiation), and several Japanese auto-component manufacturers. The Tata Electronics plant alone is the largest single investment ever made in a Gujarat smart city.

Dholera is also designed as India's first 'plug-and-play' industrial city: tenants get land + utility-ready plots + integrated logistics from a single SPV, dramatically reducing land-acquisition + utility-setup cycles that typically delay Indian industrial investments by 18-24 months.

Cross-references

5

Indian Standards, IRC codes, and InfraLens knowledge articles that bear on this project's design and execution. Each link opens the relevant reference page.

Related calculators

6

InfraLens calculators most relevant for smart city projects.

Notable features

  • 920 sq km — among the world's largest greenfield smart-city developments
  • Flagship of $90 billion Delhi-Mumbai Industrial Corridor (DMIC, Japan-India)
  • Anchor tenant: Tata Electronics semiconductor fab (₹91,000 crore — India's first)
  • 70 km arterial roads + integrated trunk utilities + desalination plant operational
  • Designed for 2 million population + 800,000 jobs at full build-out (2040)
  • First Indian 'plug-and-play' industrial city
  • DMICDC + Gujarat 51:49 JV

Records

3
01
Largest greenfield smart-city development in India
02
Flagship of world's largest single bilateral industrial corridor (DMIC)
03
Hosts India's first major semiconductor fab (Tata Electronics)

Stakeholders

1
DI
Client / Owner
Dholera Industrial City Development Limited (DICDL) — DMIC + Gujarat

Engineering

Structural type
Greenfield industrial smart city — Delhi-Mumbai Industrial Corridor (DMIC) flagship
Deck
Foundation
Span arrangement